TIP Number
|
PIN
|
Truncated Description
|
RG1
|
|
Park and Ride Lots for Carpools Set-Aside
|
RG15
|
1T06.55
|
Durable Pavement Markings Set-Aside
|
RG16
|
1B00.02
|
State Bridge Inspection Set-Aside
|
RG22
|
1B97.02
|
Local Bridge Inspection Set-Aside
|
RG27
|
1T05.02
|
Travel Demand Management
|
RG28
|
1753.73
|
Intelligent Transportation System (ITS)
|
RG29
|
1753.57
|
CDTC Technical Services
|
RG31
|
1821.44
|
Corridor Management Initiative
|
RG37
|
1754.40
|
ITS Block Operating Costs
|
RG38
|
1821.62
|
NY 5 ITS Transit Component ("Best Bus")
|
RG39
|
1T07.57
|
ITS Set-Aside for Local Traffic Signals
|
RG40
|
1932.19
|
Grade Crossing Safety Improvements Set-Aside
|
RG41
|
1T07.58
|
Spot Improvements for Bicycle and Pedestrian Access Set-Aside
|
RG42
|
B153
|
Bridge Painting on NYS Thruway
|
RG44
|
B336
|
Region-Wide Substructure Rehabilitation and Replacement on NYS Thruway
|
RG45
|
B322
|
Chain-Link Fencing at High Priority Bridges on NYS Thruway
|
RG46
|
B327
|
Thruway Bridge Inspection
|
RG51
|
B274
|
Retrofit to Fractured Critical Members on NYS Thruway
|
RG52
|
B281
|
Strengthening Low-Rated Bridges on NYS Thruway
|
RG53
|
H163/H771
|
Mill and Fill on NYS Thruway
|
RG54
|
H219
|
Roadway Striping with Permanent Striping on NYS Thruway
|
RG55
|
H230
|
Safety Upgrades on NYS Thruway
|
RG56
|
H772
|
Rock Remediation on NYS Thruway
|
RG57
|
H229
|
Noise Attenuation Projects on NYS Thruway
|
RG59
|
1804.95
|
Culvert Repairs & Replacement on State-Owned Facilities
|
RG66
|
1940.99
|
Navigation Lights on Canal
|
RG67
|
1T00.01
|
Bridge Materials for State Facilities
|
RG70
|
1T06.16
|
Interstate Signing
|
RG72
|
1T06.48
|
Large Culvert Replacements on State Facilities
|
RG76
|
1T07.14
|
Safetrak Paving Set-Aside
|
RG78
|
1T05.30
|
Bridge Painting Set-Aside
|
RG79
|
1821.72
|
Commuter Rail Demonstration
|
RG80
|
1721.57
|
Permanent Variable Message Signs for Interstate Roads
|
RG81
|
1821.62
|
NY 5 and Wolf Road ITS Signal Component
|
RG82
|
NA
|
Set-Aside for New Visions Contingencies for Existing Projects
|
RG83
|
NA
|
Set-Aside for High Priority Enhancement Projects not Funded by the Enhancement
|
RG84
|
1805.53
|
10 State Bridge Scour Repairs
|
RG85
|
1805.74
|
Armor Coating Set-Aside for State Roads
|
RG86
|
1805.67
|
5 to 7 State Bridge Repairs
|
RG87
|
1T05.53
|
Bridge Cleaning and Miscellaneous Bridge Set-Aside for State Roads
|
RG88
|
1805.77
|
Crack and Joint Sealing and Miscellaneous Pavement Work Set-Aside
|
RG89
|
1T07.89
|
Emergency Standby Contract Set-Aside for State Roads
|
RG90
|
1805.59
|
Simplified Maintenance and Vendor In-Place Paving Set-Aside for State
|
T6A
|
1824.01
|
Section 5310 Vehicles for Elderly and Handicapped Transportation by Private
|
T6B
|
1824.37
|
STAR Buses Replacement
|
T9
|
1820.50
|
Facility Improvements
|
T11
|
1821.17
|
Passenger Facility Improvements at Various Locations
|
T14A
|
1824.03
|
Non-CDTA Transit Operations Support
|
T16
|
1820.55
|
Transit Support Vehicles
|
T17
|
1820.48
|
Transit Bus Replacement
|
T32
|
1824.04
|
Leasing Tires for Buses
|
T36
|
Multiple
|
Contingencies, Administration and Planning for CDTA Projects
|
T44
|
1821.08
|
Transportation Ordinances
|
T49
|
1T05.09
|
Region-Wide Guaranteed Ride Home Program
|
T51
|
1821.14
|
Transit Operations in Construction Work Zones
|
T52
|
1824.06
|
Fixed Route Service in Saratoga County
|
T54
|
1821.63
|
New Rensselaer Amtrak Station
|
T56
|
1821.65
|
Access Transit: Capital Expenses
|
T57
|
|
Preventive Maintenance
|
T58
|
|
Bikes on Buses
|
T59
|
|
Replacement Shuttle Vehicles
|
T60
|
|
Replace/Upgrade Radio System
|
T61
|
|
Fare Collection Systems
|
T62
|
|
Information Systems
|
T63
|
|
New Star Facility
|
T64
|
|
Customer Information Systems
|
T65
|
1824.05
|
Shop Equipment
|
T66
|
|
Welfare to Work
|
T67
|
|
Rensselaer Amtrak Station ITS
|
A196
|
1306.47
|
NY 7 Bridge over I-890: Bridge Replacement
|
A198
|
1306.50
|
NY 7 Bridge over I-87 (Exit 6): Bridge Reconstruction or Replacement
|
A199
|
1460.37
|
NY 32 Bridge over D&H Railroad at Wards Lane: Bridge Repairs
|
A209
|
1125.16
|
Buckingham Drive Bridge over NY 85: Bridge Replacement
|
A226
|
1043.16
|
Lark/Dove Interchange: Repair Bridge Deck, Contract #4
|
A229
|
1528.52
|
I-90 Bridge over Conrail and Spur: Bridge Rehabilitation
|
A235
|
1043.07
|
US 9 and Livingston Avenue: Intersection Improvements
|
A237
|
1753.09
|
Everett Road, from Albany Shaker Road to Exchange Street: Corridor Improvements
|
A240
|
1721.51
|
Exit 3 or 4/Airport Connector Issues
|
A242
|
1125.24
|
Slingerlands Bypass (NY 85) Phase 2
|
A243
|
1125.19
|
Slingerlands Bypass (NY 85) Phase 3
|
A247
|
1007.14
|
NY 144, from Greene County Line to NY 143: Resurfacing
|
A248
|
1007.16
|
NY 144 Bridge over Hannacrois Creek: Bridge Deck Repairs
|
A249
|
1049.03
|
NY 397 Bridge over the Bozenkill: Bridge Replacement
|
A252
|
1352.04
|
NY 156, from the Altamont Line to NY 443: Resurfacing
|
A257
|
1804.44
|
Campus Bridge over NY 85: Bridge Reconstruction
|
A261
|
1460.31
|
NY 32, from CR 301 to CR 308: Reconstruction
|
A262
|
1007.13
|
NY 144 Bridge over Coeymans Creek: Bridge Replacement
|
A264
|
1007.15
|
NY 144 Bridge over the Vlomankill: Bridge Rehabilitation
|
A265
|
1006.07
|
NY 143, from NY 9W to Coeymans' Hollow: Reconstruction
|
A267
|
1085.26
|
NY 146 in the Village of Altamont: Reconstruction
|
A272
|
H317
|
Thruway Interchange 22: Resurfacing
|
A274
|
1753.35
|
Whitehall Road, from New Scotland Avenue to Cardinal Avenue: Reconstruction Includes drainage, sidewalks, curbs, and
|
A275
|
1753.34
|
Albany Shaker Road, from NY 7 to Watervliet Shaker Road: Expand from Two
|
A285
|
B108
|
Karner Road Bridge over the Thruway (Milepost 149.95): Bridge
|
A286
|
B109
|
Old State Road Bridge over the Thruway (Milepost 150.81): Bridge Rehabilitation
|
A287
|
1753.26
|
North Mohawk Street, from Mohawk Street to North City Line: Pavement
|
A289
|
1753.36
|
Grade Separation of Lincoln Avenue and Amtrak Tracks
|
A290
|
1347.07
|
Selkirk Bypass
|
A295
|
1753.60
|
New Karner Road (NY 155), from US 20 to NY 5: Corridor Improvments
|
A296
|
1753.37
|
Relocation of Maxwell Road Part 1: Albany Shaker Road Intersection
|
A307
|
H67
|
Thruway Safety Work and Bridge Approach Rail (Milepost 141.3 to 161.3)
|
A309
|
B103
|
Thruway Bridge over US 9W at Milepost 140.98: Bridge Rehabilitation
|
A315
|
1051.50
|
I-787, from US 9W to the South Mall Expressway: Resurfacing
|
A317
|
1306.57
|
NY 2 Bridge over US 9: Bridge Reconstruction
|
A318
|
1528.55
|
I-90, Exit 6 to Patroon Island: Resurfacing
|
A319
|
1528.56
|
I-90, from I-87 to Exit 6: Reconstruction
|
A321
|
1125.18
|
NY 85 Near the State Office Campus: Resurfacing
|
A322
|
1805.50
|
Wolf Road, from NY 5 to New Exit 3/4: Reconstruction
|
A323
|
1090.10
|
NY 443, from CR 52 to the D&H Railroad: Resurfacing
|
A324
|
B125
|
Thruway Berkshire Spur Ramp over The Thruway (Milepost B00.00): Bridge
|
A330
|
1090.12
|
NY 443 over Onesquethaw Creek: Bridge Replacement
|
A333
|
1754.38
|
Pearl Street Reconstruction Part 2: from Pine to Livingston Avenue Part 1 rolled off the TIP and Part 3 is
|
A334
|
1754.39
|
Pearl Street Reconstruction Part 3: from McCarty Avenue to Madison Avenue Part 1 rolled off the TIP and Part 2 is
|
A335
|
1011.10
|
NY 145 Bridge over Fox Creek: Bridge Replacement
|
A336
|
1754.05
|
New Karner Road Bridge over Conrail: Bridge Replacement
|
A337
|
1090.11
|
NY 443 from Delaware Plaza to the DHRR: Reconstruction
|
A338
|
1754.42
|
Elm Avenue from Delaware Avenue (NY 443) to Delmar Bypass (NY 32):
|
A339
|
1754.43
|
Cherry Avenue (CR 52) from Kenwood Avenue (NY 140) to Delaware Avenue (NY
|
A340
|
1754.44
|
Lark Street (US 9W) from Madison Avenue to Clinton Avenue: Reconstruction
|
A341
|
1754.45
|
Central Avenue (NY 5), from City Limits to Manning Blvd.: Reconstruction
|
A342
|
1754.46
|
Morris/Cordell Grade Crossing Consolidation and Separation
|
A343
|
1754.47
|
Pinegrove Avenue Construction
|
A344
|
1754.48
|
Church Street Reconstruction
|
A345
|
1754.49
|
Elm Street Bypass
|
A346
|
1805.33
|
Eight Culvert Replacements on State Facilities in Albany and Rensselaer
|
A347
|
1754.50
|
Lincoln Avenue Sidewalk, Village Bike Route Designation
|
A348
|
1125.23
|
NY 85 over Onesquethaw Creek: Bridge Replacement
|
A349
|
1125.25
|
Slingerlands Bypass (NY 85) Phase 1
|
A351
|
1721.75
|
I-87 Bridge over Pollock Road: Bridge Replacement
|
A353
|
1721.77
|
I-87 Bridge over Sand Creek Road: Bridge Replacement In-Kind
|
A354
|
B289
|
Thruway Bridge over Conrail (Milepost 133.51): Bridge Reconstruction
|
A355
|
B106
|
Thruway Bridge over Krumkill Road (at Milepost 144.87): Bridge Replacement
|
A358
|
1006.10
|
NY 143, from BIN 103803 to CR 103: Resurfacing
|
A359
|
1039.42
|
US 9W, Greene County Line to Bethlelem Line: Reconstruction
|
A360
|
1039.43
|
NY 9W & 32: Delmar Bypass Reconstruction
|
A361
|
1045.09
|
NY 378 Bridge over Hudson River: Tower Removal
|
A362
|
1051.51
|
I-787, from NY 378 to NY 7: Resurfacing
|
A363
|
1092.04
|
South Mall Expressway Bridges: Deck Work
|
A364
|
1125.20
|
NY 85 in the Town of Rensselaerville: Reconstruction
|
A365
|
1132.12
|
NY 155, from NY 85A to NY 20: Reconstruction
|
A366
|
1460.40
|
NY 32, from City of Albany to City of Watervliet: Resurfacing
|
A367
|
1804.96
|
NY 7, from US 9 to I-787: Crack and Joint Seal
|
A368
|
1804.92
|
NY 910E (New Scotland Road) over the Normanskill: Bridge Replacement
|
A369
|
1002.09
|
NY 85A, from NY 155 to Western Village Line in Voorheesville: Reconstruction
|
A370
|
1721.78
|
I-87 Bridge over Watervliet Shaker Road: Bridge Replacement
|
A371
|
1004.05
|
NY 140 (Kenwood Avenue), from NY 443 (Delaware Avenue) to the CR 52 (Cherry
|
A372
|
1754.04
|
Watervliet Shaker Road, from Karner Road to Albany Shaker Road: Corridor
|
A375
|
1721.60
|
I-87, from Exit 1 to the Saratoga County Line: Reconstruction
|
A376
|
1754.60
|
Waterfront Pedestrian Bridge
|
A377
|
1754.67
|
Village of Voorheesville Pedestrian Circulation
|
A378
|
1754.72
|
Tandem Lot Relocation Study
|
A379
|
NA
|
Broadway & Harbor Access Project, Broadway Harbor Gateway & Corridor
|
A380
|
NA
|
Port of Albany Maintenance Dredging on Both Sides of the River
|
A381
|
NA
|
Port of Albany: Rebuild Multi-Purpose Dock on Both Sides of the River
|
A382
|
NA
|
Construct New Industrial Access Road
|
A392
|
1754.91
|
Relocation of Maxwell Road Part 2: Wolf Road Service Road
|
A393
|
1755.02
|
Dunbar Hollow Bridge over the Hannacrois Creek: Bridge Reconstruction or
|
A394
|
NA
|
NYSDOT/Amtrak Rail Initiative: Livingston Avenue Bridge Rehabilitation
|
A395
|
NA
|
NYSDOT/Amtrak Rail Initiative: Rensselaer to Schenectady Double Track.
|
A396
|
1039.46
|
NY 9W Bridge over Conrail: Bridge Reconstruction or Replacement
|
A397
|
1006.11
|
NY 143 Bridge over Hannacrois Creek: Bridge Reconstruction or Replacement
|
A398
|
1002.10
|
NY 85A Bridge over Vly Creek: Bridge Reconstruction or Replacement
|
A399
|
1045.10
|
NY 378 Bridge over D&H: Bridge Reconstruction or Replacement
|
A400
|
1754.74
|
Old Ravena Road Bridge over Conrail: Bridge Replacement or Reconstruction
|
A401
|
1755.23
|
CR 53 (Jericho Road) Bridge over Dowerskill: Bridge Reconstruction or
|
A404
|
|
Park and Ride Lot at the End of I-787
|
A405
|
1755.45
|
Tory Cave Access Path and Indian Ladder Road
|
A406
|
1755.61
|
Albany County Sign Management
|
A407
|
1755.62
|
City of Albany Sign Management
|
A408
|
1755.40
|
Old Ravena Road over Conrail; Bridge Replacement or Reconstruction
|
A409
|
|
City of Albany Bike Racks
|
A410
|
|
Bethlehem Sidewalks
|
A411
|
|
Cohoes Bike Racks
|
A412
|
|
Mohawk-Hudson Bikeway
|
A413
|
|
Green Island Bridge Sidewalks
|
A414
|
|
Wards Lane Sidewalk
|
A415
|
|
Albany Waterfront Intermodal Enhancements
|
R105
|
1089.48
|
Vandenburg Avenue, from Williams Road to Morrison Avenue: Reconstruction
|
R106
|
1001.28
|
NY 2 Bridge over the Poestenkill: Bridge Replacement
|
R107
|
1057.14
|
NY 150 Bridge over the Moordenerkill (BIN 1038560): Bridge Replacement
|
R108
|
1111.29
|
US 20, from Columbia County to Nassau: Resurfacing
|
R110
|
1753.87
|
Third Street (Partition Street to Washington Avenue) and Third Avenue
|
R111
|
1306.53
|
NY 7, from McChesney Avenue to NY 142: Reconstruction and Hoosick Street
|
R115
|
1753.25
|
Church Street Bridge over the Hoosick River: Bridge Replacement
|
R120
|
1086.20
|
NY 43, Glass Lake to Denault Corners: Resurfacing
|
R123
|
1130.45
|
NY 22 in the Village of Hoosick Falls: Reconstruction
|
R127
|
1188.19
|
NY 67, Valley Falls to Eagle Bridge: Resurfacing
|
R128
|
1335.17
|
NY 40 Bridge over the Tomhannock Creek: Bridge Replacement
|
R130
|
1001.27
|
NY 2, from Petersburg to the Massachusetts State Line: Resurfacing
|
R133
|
1057.13
|
NY 150 Bridge over the Moordenerkill (BIN 1038530): Bridge Replacement
|
R134
|
1188.27
|
NY 67 Bridge over the Champlain Canal and Hudson River: Bridge Rehabilitation
|
R135
|
1086.23
|
NY 43 over Tsatsawassa Creek: Bridge Replacment
|
R137
|
H269
|
Thruway, Berkshire Spur from Milepost B1.6 to Milepost B6.4: Rehabilitation in
|
R138
|
H269
|
Thruway Interchange B-1 (at Milepost B6.58): Rehabilitate Toll Plaza
|
R145
|
B130
|
Thruway Berkshire Spur Bridge at Milepost B1.08: Substructure Repairs
|
R151
|
B136
|
Thruway Berkshire Spur Interchange with US 9 (Milepost B6.58 and B6.59): Bridge
|
R154
|
B139
|
Thruway Berkshire Spur Bridge over NY 203 (Milepost's B8.93): Bridge Repairs
|
R155
|
1753.39
|
NY 2, from 11th Street to Pawling Avenue/Brunswick Road: Reconstruction Includes new sidewalks and curbs.
|
R156
|
1753.40
|
Bridges at Burden Lake
|
R157
|
1043.15
|
US 9 & 20 Reconstruction Part 1: from Ames Plaza to US 4
|
R163
|
H65
|
Thruway, from Milepost B6.4 to Milepost B18: Resurfacing
|
R164
|
1111.30
|
US 20 Bridge over the Valatiekill: Bridge Replacement
|
R166
|
1306.58
|
NY 7, from CR 95 (Hill Road) to the Vermont State Line: Reconstruction
|
R168
|
1097.04
|
NY 9J, from Castleton to CR 6 (Maple Hill Road): Reconstruction
|
R169
|
1753.90
|
Broadway/Waterfront Access
|
R172
|
1753.99
|
Mechanic Street Bridge over B&M Railroad: Bridge Replacement
|
R173
|
1089.62
|
I-90 Exit 8 Connector Phase 2: ITS Demonstration.
|
R174
|
B131
|
Castleton Bridge (Milepost B1.08): Embankment Erosion Repair
|
R175
|
1754.51
|
ITS Signal Upgrades at Two Locations
|
R176
|
1043.30
|
NY 9 & 20 Reconstruction Part 2: NY 4 to Miller Road
|
R177
|
1043.27
|
NY 9 & 20 Reconstruction Part 3: from Miller Road to I-90
|
R178
|
1754.52
|
Troy-Menands Bridge Pedestrian and Bicycle Access
|
R179
|
1001.18
|
NY 2 Bridge over Little Hoosick River: Bridge Replacement
|
R180
|
1057.16
|
NY 150, from CR 6 to US 9 & 20: Reconstruction
|
R181
|
1086.24
|
NY 43 Bridge over Taborton Creek: Bridge Replacement
|
R182
|
1086.25
|
NY 43 Bridge over West Brook: Bridge Replacement
|
R183
|
1097.05
|
NY 9J, from Columbia County Line to Castleton Line: Reconstruction
|
R184
|
1130.60
|
NY 22 Bridge over the Walloomsac River: Bridge Replacement
|
R185
|
1130.63
|
NY 22 Bridge over Kinderhook Creek: Bridge Replacement
|
R186
|
1306.61
|
NY 7 Bridge over Hoosick River: Bridge Replacement
|
R187
|
1306.62
|
NY 7, from Raymertown to Pittstown: Resurfacing
|
R188
|
1335.18
|
NY 40 Bridge over Hoosick River: Bridge Replacement
|
R189
|
1503.08
|
NY 66, from NY 20 to East Nassau: Resurfacing
|
R190
|
1503.09
|
NY 66 Bridge over Kinderhook Creek: Bridge Replacement
|
R191
|
1754.00
|
Cottrell Road Bridge over Walloomsac River: Bridge Replacement
|
R192
|
1754.02
|
Hansen Road Bridge over the B&M Railroad: Bridge Replacement
|
R194
|
1130.58
|
NY 67, from NY 22 to Vermont Line: Reconstruction
|
R195
|
1754.59
|
South Troy Industrial Park Road
|
R196
|
1754.68
|
CR 111 (Pitts-Johns Road) Bridge over the Hoosick River: Bridge Restoration
|
R197
|
1754.69
|
Washington Avenue, from I-90 Exit 8 to Broadway: Sidewalk Renovation
|
R198
|
1754.70
|
New sidewalks on the East Side of Brookside Avenue and at the Intersection
|
R199
|
1755.04
|
Simons Road Bridge over Amtrak: Bridge Replacement
|
R200
|
1754.87
|
CR 59 over the Hoosick River: Buskirk Covered Bridge Rehabilitation
|
R201
|
1306.63
|
NY 7 and CR 115 Safety Improvements
|
R202
|
1755.03
|
56 Road Bridge over Poestenkill Creek: Bridge Replacement
|
R203
|
1754.99
|
CR 40 (Plank Road) Bridge over the Poestenkill Creek: Bridge Replacement
|
R204
|
1755.04
|
CR 3 (South Schodack Road) Bridge over Conrail: Bridge Replacement
|
R205
|
NA
|
NYSDOT/Amtrak Rail Initiative: Five Remanufactured High-Speed Trainsets
|
R206
|
NA
|
NYSDOT/Amtrak Rail Initiative: Rensselaer Amtrak Shop Construction
|
R207
|
NA
|
NYSDOT/Amtrak Rail Initiative: Track Improvements in Rensselaer County
|
R208
|
1755.25
|
Cropsey Road Bridge over Poestenkill Creek: Bridge Replacement or
|
R209
|
1755.24
|
Powers Road Bridge over Poestenkill Creek: Bridge Replacement or
|
R210
|
1306.68
|
NY 7, from Troy City Line to McChesney Avenue: Reconstruction
|
R211
|
1306.64
|
Hoosick Street Resurfacing and Signal Interconnect
|
R212
|
1528.67
|
I-90, from Exit 10 to Exit 11: Armor Coat
|
R213
|
1805.84
|
Large Culvert Replacement on State Roads
|
R215
|
1001.26
|
NY 2, Grafton to Petersburgh: Resurfacing
|
R218
|
1306.60
|
Bennington Bypass
|
R219
|
1755.42
|
ITS Signal Improvements in the City of Troy
|
R220
|
1755.44
|
Observation Deck and Fishing Pier
|
R221
|
1503.09
|
NY 66 Bridge over Kinderhook Creek: Bridge Rehabilitation
|
R222
|
1806.25
|
ATIS in Rensselaer County
|
R223
|
|
Troy Pedestrian Bicycle Trail
|
SA47
|
1721.39
|
I-87, Saratoga County Line to Exit 9: Resurfacing
|
SA48
|
1188.21
|
NY 67 Bridge over I-87 Exit 12: Bridge Reconstruction
|
SA57
|
1460.33
|
NY 32 Bridge over Barge Canal: Bridge Rehabilitation
|
SA70
|
1188.26
|
NY 67 Bridge over Abandoned Deleware & Hudson Line: Bridge Reconstruction
|
SA73
|
1753.31
|
CR 52 Bridge over the Glowgee Creek: Bridge Replacement
|
SA80
|
1188.20
|
NY 67, Malta/Stillwater Line to the Southern Overlap with NY 9: Resurfacing
|
SA84
|
1089.54
|
US 4 Bridge over the D&H Railroad: Bridge Reconstruction
|
SA88
|
1096.18
|
NY 50, North of Saratoga Springs: Reconstruction
|
SA89
|
1802.27
|
West Avenue, from Church Street (NY 9N) to NY 50: Intersection Improvements at
|
SA93
|
1753.50
|
Middle Line Road (CR 59), from NY 50 to NY 67: Rehabilitate and Upgrade to State
|
SA95
|
1043.19
|
US 9 Intersection with Crescent Road and Church Hill Road: Intersection
|
SA96
|
1753.42
|
Sixth Street Bridge over Railroad: Bridge Replacement
|
SA98
|
1753.44
|
Moe Road, from Grooms Road to NY 146: Resurfacing
|
SA99
|
1753.62
|
Grooms Road (CR 91), from NY 146 to Miller Road: Resurfacing and Drainage
|
SA100
|
1043.20
|
South Broadway (NY 9), from West Fenlon Road to the Avenue of the Pines:
|
SA101
|
1753.43
|
Resurfacing of:
|
SA104
|
1753.63
|
Batchellerville Bridge (CR 98): Alternatives Analysis and Preliminary
|
SA108
|
1085.27
|
Balltown Road, from River Road to Glenridge Road: Corridor Improvements
|
SA109
|
1804.42
|
Glenridge Road, from Maple Avenue to NY 146: Reconstruction
|
SA116
|
1721.55
|
I-87 Bridge over the Snookkill: Bridge Replacement
|
SA121
|
1721.57
|
I-87 Resurfacing Part 1: from Exit 9 to Exit 13
|
SA122
|
1721.56
|
I-87 Bridge over the D&H Railroad North of Saratoga Springs: Bridge Replacement
|
SA131
|
1754.53
|
ITS Signal Upgrades at 21 Intersections in the City of Saratoga Springs
|
SA132
|
1754.54
|
CR 7 (South Shore Road) over Batcheller Creek: Bridge Replacement
|
SA133
|
1754.55
|
South Broadway/Ballston Avenue Intersection Improvements
|
SA134
|
1821.66
|
Replacement Buses for Upstate Transit Northway Service
|
SA135
|
1754.56
|
Sitterly Road and Woodin Road: Bike Paths on 5 Foot Shoulders
|
SA136
|
1754.57
|
Saratoga Springs Downtown Pedestrian Improvements
|
SA137
|
1941.06
|
Erie Canal Concrete Docking between Lock E3 and E4: Rehabilitation
|
SA138
|
NA
|
Glens Falls Feeder Canal 2 & 3
|
SA139
|
NA
|
Glens Falls Feeder Canal Repairs
|
SA140
|
NA
|
Erie Canal Lock E2 Rehabilitation
|
SA141
|
NA
|
Erie Canal Lock 6 Rehabilitation
|
SA142
|
1089.58
|
NY 4, in the Village of Schuylerville: Reconstruction
|
SA143
|
1089.59
|
NY 4, from NY 32 to Village of Schuylerville: Resurfacing
|
SA145
|
1188.30
|
NY 67 Bridge over Gordon Creek: Bridge Replacement
|
SA147
|
1721.74
|
Kinns Road Bridge over I-87: Bridge Replacement
|
SA148
|
1754.01
|
CR 49 Bridge over Kaydeross Creek: Bridge Replacement
|
SA149
|
1804.93
|
Fulton Street Bridge over Old Champlain Canal: Bridge Replacement
|
SA152
|
1116.43
|
NY 9N Bridge over the Hudson River: Bridge Replacement
|
SA153
|
1236.14
|
NY 29, Jockey Street to Armer Road: Reconstruction.
|
SA154
|
1236.19
|
NY 29, Armer Road to Creek Road: Reconstruction.
|
SA155
|
1754.61
|
CR 59 (Middle Line Road) Bridge over the Kayaderosseras: Bridge Replacement
|
SA156
|
1941.05
|
Mechanicville Terminal Wall Rehabilitation
|
SA158
|
1754.71
|
North Bridge at Peebles Island State Park
|
SA159
|
NA
|
Industrial Park Road
|
SA160
|
NA
|
Pedestrian Improvements on Broadway in Saratoga Springs
|
SA161
|
NA
|
Clifton Park Center Road: Resurfacing
|
SA162
|
NA
|
CR 109 (Farm to Market Road), from US 9 to NY 146: Reconstruction
|
SA163
|
1821.70
|
Saratoga Springs Train Station
|
SA164
|
1821.71
|
Scenic Train: Saratoga Springs to North Creek
|
SA165
|
NA
|
Rehabilitation of Lock C-5 in Northumberland
|
SA166
|
1755.05
|
Hans Creek Road Bridge over Hans Creek (BIN 3304270): Bridge Reconstruction
|
SA167
|
1755.05
|
Hans Creek Road Bridge over Hans Creek (BINs 2202800 and 2202810): Bridge
|
SA168
|
1721.92
|
I-87 Resurfacing Part 2: from Exit 9 to Exit 13.
|
SA169
|
1754.75
|
CR 8 Bridge over Sacandaga Reservoir: Bridge Replacement or Rehabilitation
|
SA170
|
1188.32
|
NY 67 Bridge over Unnamed Creek: Bridge Replacement or Rehabilitation
|
SA171
|
1805.69
|
Four Intersections, Including NY 423 at NY 4
|
SA174
|
1236.18
|
NY 29, Creek Road to Middle Line Road: Resurfacing
|
SA175
|
1755.41
|
Sand Lake Road Bridge over Sand Creek: Bridge Replacement
|
SA176
|
1755.16
|
Ralph Street Bridge over Kayderosseras Creek
|
SA177
|
|
Town of Malta Trail Improvements
|
SA178
|
|
Arongen-Shenendahowa Public Library Multi-Use Path
|
SA179
|
|
Station Lane Sidewalks, Saratoga Springs
|
SA180
|
|
Crosswalk and Four Pedestrian Signs, Town of Stillwater
|
SA181
|
|
Spring Run Trail Construction Construction of a 6,600 linear foot trail from East Avenue to I-87. This
|
SA182
|
|
Ruhle Road Pedestrian Bridge: Restoration This project will restore and preserve
|
S79
|
1003.43
|
NY 103 Bridge over Erie Canal: Bridge Rehabilitation
|
S93
|
1306.51
|
NY 7 at the Five Corners: Intersection Improvements
|
S94
|
1306.52
|
NY 7 and NY 146: Intersection Improvements
|
S96
|
1085.27
|
Balltown Road, from River Road to Glenridge Road: Corridor Improvements
|
S97
|
1096.19
|
NY 50, Freeman's Bridge Road to Glenridge Road: Corridor Improvements
|
S101
|
1020.08
|
NY 158, from Curry Road to Railroad: Resurfacing
|
S104
|
1261.05
|
NY 147, from NY 5 to Vley Road: Resurfacing
|
S110
|
1753.51
|
Aqueduct/Maxon Road, from Balltown Road to Erie Blvd.: Reconstruction
|
S111
|
B114
|
Putnam Road Bridge over NYS Thruway (Milepost 159.91): Bridge Reconstruction
|
S115
|
1476
|
NYS Thruway at Milepost 164 Eastbound: Second Stage Drainage
|
S118
|
B115
|
Rynex Corner Road Bridge over NYS Thruway (Milepost 167.03): Bridge
|
S120
|
1804.42
|
Glenridge Road, from Maple Avenue to NY 146: Reconstruction
|
S121
|
1753.65
|
State Street (NY 5), from Furman Street to Fehr Avenue: Resurfacing
|
S124
|
1525.29
|
I-890, from Campbell Road to Exit 26: Reconstruction
|
S125
|
1306.59
|
NY 7, from I-890 to the Five Corners: Traffic Operations Improvements
|
S126
|
1096.21
|
NY 50 Bridge over the Indiankill: Bridge Replacement
|
S127
|
1753.95
|
Mohawk-Hudson Bike Hike Trail
|
S129
|
1021.29
|
NY 159 Bridge over Conrail: Bridge Replacement
|
S130
|
B154
|
Thruway Bridge Painting (Mileposts 158.93, 162.19 & 162.20)
|
S131
|
B112
|
Thruway Bridge over Conrail (Milepost 158.98)
|
S132
|
B290
|
Thruway Bridge over Scotch Church Road (Milepost 167.35)
|
S133
|
B113
|
Thruway over Poentickill (Milepost 159.36)
|
S135
|
NA
|
Erie Canal Lock 8 SW Approach Wall
|
S136
|
1034.18
|
NY 5, from NY 147 to Washington Avenue: Resurfacing
|
S137
|
1357.11
|
I-88, Thruway Interchange to Schoharie County Line: Resurfacing
|
S139
|
1754.62
|
Consaul Road (CR 9) from Balltown Road to County Line: Reconstruction
|
S140
|
1754.63
|
Mohawk-Hudson Bikepath Corridor Improvements
|
S141
|
1754.65
|
Rail Corridor Bridge Improvements
|
S142
|
1754.64
|
Kings Road Sidewalks
|
S143
|
1754.66
|
Lock 8 Bicycle and Pedestrian Access over the Dam
|
S144
|
1754.58
|
State Street Streetscape
|
S145
|
1525.30
|
I-890, Exit 5 to Campbell Road: Resurfacing
|
S146
|
NA
|
State Street Transportation Corridor Streetscape
|
S147
|
NA
|
Scotch Ridge Road: Reconstruction and Realignment
|
S148
|
NA
|
Maple Avenue: Reconstruct and Realign "S" Curve
|
S149
|
1755.06
|
Cole Road Bridge over the Normanskill: Bridge Reconstruction
|
S150
|
NA
|
NYSDOT/Amtrak Rail Initiative: Rensselaer to Schenectady Double Track
|
S151
|
1805.46
|
State Bridge Painting
|
S152
|
|
Mohawk-Hudson Bike-Hike Trail, Near Lock 8: Reconstruction
|
S153
|
|
Bike Trail in Niskayuna, Repairs
|
S154
|
|
Mohawk-Hudson Bike-Hike Trail
|
S155
|
|
Scotia Sidewalks
|
S156
|
|
Mohawk-Hudson Bike Trail
|