T6A
|
1824.01 |
CapitalVeh |
1982-87 |
|
Enhanced Mobility of Seniors and Individuals with Disabilities Program
Section 5310 mobility management and other capital projects, including vehicles, that improve access and mobility for seniors and individuals with disabilities. Operating and administrative costs are also eligible under this program.
|
Regional, Multiple |
|
Sec 5310 |
3.150 |
.630 V |
.630 V |
.630 V |
.630 V |
.630 V |
.630 V |
|
5310-Sar |
0.725 |
.145 V |
.145 V |
.145 V |
.145 V |
.145 V |
.145 V |
|
Total |
3.875 |
.775    |
.775    |
.775    |
.775    |
.775    |
.775    |
  |
Vehicles |
3.875 |
.775    |
.775    |
.775    |
.775    |
.775    |
.775    |
  |
|
Agency: NYSDOT
Func. Class: NA
Plan Ref.: CHSAPTP
No EIS Required
AQ Status: Exempt
|
|
|
T6B
|
1820.37 |
CapitalVeh |
1982-87 |
|
STAR Buses Replacement and Expansion
Replacement of STAR (Special Transit Service Available by Request) custom vehicles for paratransit use.
This includeds funds for expansion of the STAR fleet.
|
Regional, CDTA |
|
Sec 5339 |
2.572 |
.640 V |
.570 V |
.630 V |
|
.679 V |
.693 V |
|
Sec 5307 |
0.714 |
|
|
|
.500 V |
.106 V |
.108 V |
|
Total |
3.286 |
.640    |
.570    |
.630    |
.500    |
.785    |
.801    |
  |
Vehicles |
3.286 |
.640    |
.570    |
.630    |
.500    |
.785    |
.801    |
  |
|
Agency: CDTA
Func. Class: NA
Plan Ref.: ADA
No EIS Required
AQ Status: Exempt
|
|
|
T9 |
CDTC09 |
CapitalFac |
1977-82 |
|
Facility Improvements
Renovation of bus washers.
This project was not on the 2013-18 TIP
|
Regional, CDTA |
|
Sec 5339 |
  |
.450 F |
|
|
|
|
|
|
Total |
  |
.450    |
  |
  |
  |
  |
  |
  |
Facilities |
  |
.450    |
  |
  |
  |
  |
  |
  |
|
Agency: CDTA
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
T11
|
1821.18 |
CapitalFac |
1977-82 |
|
Passenger Facility Improvements at Various Locations
Improvements and additions to passenger amenities, including repair, upgrade and replacement of bus shelters and bus stop signage.
|
Regional, CDTA |
|
5307-ATI |
1.086 |
.200 F |
.200 F |
.250 F |
.250 F |
.191 F |
.195 F |
|
Total |
1.086 |
.200    |
.200    |
.250    |
.250    |
.191    |
.195    |
  |
Facilities |
1.086 |
.200    |
.200    |
.250    |
.250    |
.191    |
.195    |
  |
|
Agency: CDTA
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
T14A |
NA |
Oper.Assis |
1979-84 |
|
Transit Operating Assistance
Funding beyond year 1 is estimated.
Related Project: T14B.
|
Regional, Multiple |
|
TOA |
204.881 |
37.165 S |
40.881 S |
41.000 S |
41.000 S |
41.000 S |
41.000 S |
|
Total |
204.881 |
37.165    |
40.881    |
41.000    |
41.000    |
41.000    |
41.000    |
  |
Pro. Service |
204.881 |
37.165    |
40.881    |
41.000    |
41.000    |
41.000    |
41.000    |
  |
|
Agency: CDTA
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
T14B
|
CDTC.08 |
Oper.Assis |
1998-03 |
|
Transit Operations Support for Saratoga Service: Preventive Maintenance & Operating Assistance
Section 5307-Sar funds are allocated for transit (capital or operating) use in Saratoga Springs due to its small urban area status. Match on Operating Assistance is 50%.
TOA Funding beyond year 1 is estimated.
Related Projects: T14A & T57. Funding for 19-20 was increased to match the apportionment.
|
Saratoga Springs, County |
|
5307-Sar |
7.654 |
1.405 V |
1.432 V |
1.429 V |
1.781 V |
1.491 V |
1.521 V |
|
TOA |
2.000 |
.400 S |
.400 S |
.400 S |
.400 S |
.400 S |
.400 S |
|
Total |
9.654 |
1.805    |
1.832    |
1.829    |
2.181    |
1.891    |
1.921    |
  |
Vehicles |
7.654 |
1.405    |
1.432    |
1.429    |
1.781    |
1.491    |
1.521    |
  |
Pro. Service |
2.000 |
.400    |
.400    |
.400    |
.400    |
.400    |
.400    |
  |
|
Agency: CDTA
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
T16 |
1821.80 |
CapitalVeh |
1978-83 |
|
Transit Support Vehicles
Replacement of non-revenue support vehicles for supervisory and maintenance use.
|
Regional, CDTA |
|
Sec 5339 |
0.688 |
.200 V |
.260 V |
|
|
.212 V |
.216 V |
|
Sec 5307 |
0.660 |
|
|
.360 V |
.300 V |
|
|
|
Total |
1.348 |
.200    |
.260    |
.360    |
.300    |
.212    |
.216    |
  |
Vehicles |
1.348 |
.200    |
.260    |
.360    |
.300    |
.212    |
.216    |
  |
|
Agency: CDTA
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
T17
|
1820.48 |
CapitalVeh |
1978-83 |
|
Transit Bus Replacement/Expansion
Purchase or lease transit buses in a manner to maintain existing fixed-route service levels.
The 5339 funds in 18-19 include $0.959M for 5339 no-lo (no or low emissions buses).
May include Trolleys
CDTA deleted 180K Sec 5307 in 19-20 and added 490K 5339-Sar in 19-20.
|
Regional, CDTA |
|
Sec 5339 |
6.240 |
1.389 V |
.920 V |
1.791 V |
1.643 V |
.934 V |
.952 V |
|
5339-Sar |
0.880 |
.128 V |
.618 V |
|
|
.134 V |
.128 V |
|
Sec 5307 |
6.919 |
|
|
|
2.251 V |
2.303 V |
2.365 V |
|
MEP |
3.461 |
5.133 V |
|
3.461 V |
|
|
|
|
ATC |
3.467 |
3.642 V |
|
3.467 V |
|
|
|
|
Total |
20.967 |
10.292    |
1.538    |
8.719    |
3.894    |
3.371    |
3.445    |
  |
Vehicles |
20.967 |
10.292    |
1.538    |
8.719    |
3.894    |
3.371    |
3.445    |
  |
|
Agency: CDTA
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
T57
|
1TR6.04 |
CapitalVeh |
1999-04 |
|
Preventive Maintenance
Ongoing activities to maintain capital assets to ensure bus fleet and other capital items operate efficiently throughout their useful lives.
Starting 2003-08, this project includes T32 (Tire Leasing).
Related Project: T14B. CDTA added 180 K to 19-20.
|
Regional, CDTA |
|
Sec 5307 |
79.294 |
15.930 V |
16.694 V |
16.369 V |
16.808 V |
14.566 V |
14.857 V |
|
Total |
79.294 |
15.930    |
16.694    |
16.369    |
16.808    |
14.566    |
14.857    |
  |
Vehicles |
79.294 |
15.930    |
16.694    |
16.369    |
16.808    |
14.566    |
14.857    |
  |
|
Agency: CDTA
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
T72
|
1820.61 |
CapitalFac |
2005-10 |
|
Safety and Security
Incorporation of FTA's top 20 Security Program Action Items for Transit Agencies & recommendations from CDTA's Facilities Study.
|
Regional, CDTA |
|
Local |
1.000 |
.200 F |
.200 F |
.200 F |
.200 F |
.200 F |
.200 F |
|
Total |
1.000 |
.200    |
.200    |
.200    |
.200    |
.200    |
.200    |
  |
Facilities |
1.000 |
.200    |
.200    |
.200    |
.200    |
.200    |
.200    |
  |
|
Agency: CDTA
Func. Class: NA
Plan Ref.: Multimodal
No EIS Required
AQ Status: Exempt
|
|
|
T77
|
CDTC.20 |
CapitalVeh |
2003-08 |
|
Capital Cost of Contracting for Commuter Service in the Capital District to points North, West and South
The sub-recipient for funds is currently Adirondack Trailways
This project includes T73 from the 2005-10 TIP.
18-19 funds rolled over. 210K left over from 17-18 was added to 19-20. 19-20 funds (.$724M) rolled over.
|
Regional, N.A. |
|
Sec 5307 |
3.810 |
|
.626 V |
1.384 V |
.600 V |
.600 V |
.600 V |
|
Total |
3.810 |
  |
.626    |
1.384    |
.600    |
.600    |
.600    |
  |
Vehicles |
3.810 |
  |
.626    |
1.384    |
.600    |
.600    |
.600    |
  |
|
Agency: CDTA
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
T107
|
CDTC107 |
Trans.Misc |
2016-21 |
|
Hudson River Corridor BRT: Phase 1
Transit (BRT) that will connect Albany, Menands, Watervliet, Troy and Cohoes.
Phase 1 includes: Transit signal priority, station sitework, ped infrastructure and design work for the Troy bus garage expansion.
The Uncle Sam Transit Center was removed from this project and those funds were returned to RG131.
This is a drawdown on RG131. Related project: T90. All funds rolled over.
|
Multiple, CDTA |
|
Total |
  |
  |
  |
  |
  |
  |
  |
  |
|
Agency: CDTA
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Non-Exempt
|
|
|
T108
|
CDTC108 |
Trans.Misc |
2016-21 |
|
TDM Multimodal Implementation
Includes: guaranteed ride home program, transit pass subsidies, park & ride leases, Try Transit, capital carshare, and the regional bikeshare network.
This is a drawdown on RG130. 600K rolled over to 17-18.
The local funds represent a CDTA committment to making up for the same amount funding moved from T108 to T57 by amendment.
All funds rolled over into 19-20 and again to 20-21.
|
Regional, CDTA |
|
STP-Flex |
0.538 |
|
|
.118 P |
.420 P |
|
|
|
Local |
1.863 |
|
|
.483 P |
1.380 P |
|
|
|
Total |
2.401 |
  |
  |
.601    |
1.800    |
  |
  |
  |
Prelim. Des. |
2.401 |
  |
  |
.601    |
1.800    |
  |
  |
  |
|
Agency: CDTA
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
T109
|
1760.59 |
Trans.Misc |
2016-21 |
|
Washington/Western BRT Phase 1
3 city blocks from Dove Street to Lexington Avenue.
Bus stop work, enhanced lighting, raised medians, turn lanes, on-Street parking, signalized mid-block pedestrian crossings, curb extensions and bump outs. The design work was completed under project T90.
This is a drawdown on RG131. This project includes PIN CD109a on the STIP.
All funds rolled over twice.
|
Multiple, CDTA, .46 cl-mi |
|
NHPP |
0.250 |
|
|
.250 C |
|
|
|
|
STP-Flex |
0.250 |
|
|
.250 C |
|
|
|
|
Total |
0.500 |
  |
  |
.500    |
  |
  |
  |
  |
Construct'n |
0.500 |
  |
  |
.500    |
  |
  |
  |
  |
|
Agency: CDTA
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Non-Exempt
|
|
|
T122
|
CDTC122 |
Trans.Misc |
2019-24 |
|
Hudson River Corridor BRT: Final Phase
Connects Waterford to Downtown Albany via Troy, Watervliet, and Menands. Includes buses, stations, transit signal priority, replacement of 10 traffic signals, queue bypass lanes, real-time bus arrival information, two park and ride facilities, expanding a maintenance and storage facility and professional services.
Total local match is $10.592M, 24.9% All phases rolled over.
|
Multiple, CDTA |
|
Sec 5339 |
5.000 |
|
5.000 V |
|
|
|
|
|
Sec 5309 |
37.513 |
|
7.385 V |
|
|
|
|
|
Sec 5309 |
|
|
2.042 S |
|
|
|
|
|
Sec 5309 |
|
|
7.546 F |
|
|
|
|
|
Sec 5309 |
|
|
1.387 R |
|
|
|
|
|
Sec 5309 |
|
|
19.153 C |
|
|
|
|
|
Total |
42.513 |
  |
42.513    |
  |
  |
  |
  |
  |
Vehicles |
12.385 |
  |
12.385    |
  |
  |
  |
  |
  |
Pro. Service |
2.042 |
  |
2.042    |
  |
  |
  |
  |
  |
Facilities |
7.546 |
  |
7.546    |
  |
  |
  |
  |
  |
ROW Aquis'n |
1.387 |
  |
1.387    |
  |
  |
  |
  |
  |
Construct'n |
19.153 |
  |
19.153    |
  |
  |
  |
  |
  |
|
Agency: CDTA
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Non-Exempt
|
|
|
T123
|
1822.15 |
Trans.Misc |
2019-24 |
|
Washington/Western BRT Phase 2
Construct transit, roadway, and pedestrian infrastructure for the future Washington-Western BRT line in the City of Albany adjacent to the University at Albany's Downtown Campus and the new ETEC Campus
The STP-Flex funds are from RG131.
|
Albany, CDTA |
|
STP-Flex |
0.971 |
|
.971 C |
|
|
|
|
|
Local |
0.063 |
|
.063 C |
|
|
|
|
|
TAP |
4.480 |
|
4.480 C |
|
|
|
|
|
Total |
5.514 |
  |
5.514    |
  |
  |
  |
  |
  |
Construct'n |
5.514 |
  |
5.514    |
  |
  |
  |
  |
  |
|
Agency: CDTA
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Non-Exempt
|
|
|
T124
|
1822.16 |
Trans.Misc |
2019-24 |
|
Hudson River Corridor BRT Operations
Service and operational related expenses (such as driver salaries and benefits, fuel, bus maintenance, etc.) of the River Corridor BRT project beginning in the fall of 2020.
Local funds in the Post '24 time period are a commitment to fund the project for the amount shown in FFY 2024-25.
CDTA increased local funding and DOT advanced the CMAQ funds.
|
Multiple, CDTA |
|
CMAQ |
5.544 |
|
5.544 S |
|
|
|
|
|
Local |
11.712 |
|
|
|
3.806 S |
3.900 S |
4.006 S |
2.031 S |
Total |
17.256 |
  |
5.544    |
  |
3.806    |
3.900    |
4.006    |
2.031    |
Pro. Service |
17.256 |
  |
5.544    |
  |
3.806    |
3.900    |
4.006    |
2.031    |
|
Agency: CDTA
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Non-Exempt
|
|
|
T125
|
1824.62 |
Trans.Misc |
2019-24 |
|
Washington/Western BRT Phase 3
Construct new parking facilities and staging area due to the increase in CDTA's fleet.
This project was funded from RG131 and delayed one year.
$0.529M F moved from year 3 to year 2.
|
Albany, CDTA |
|
STP-Flex |
2.178 |
|
|
.953 R |
|
|
|
|
STP-Flex |
|
|
|
1.225 F |
|
|
|
|
Total |
2.178 |
  |
  |
2.178    |
  |
  |
  |
  |
ROW Aquis'n |
0.953 |
  |
  |
.953    |
  |
  |
  |
  |
Facilities |
1.225 |
  |
  |
1.225    |
  |
  |
  |
  |
|
Agency: CDTA
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Non-Exempt
|
|
|
T126
|
1824.70 |
Prob Asses |
2019-24 |
|
Bus Lane Feasibility Study
CDTA & CDTC staff will to assess where bus-only lanes can be implemented and create designs for feasible locations.
These funds will be transferred from the TIP to the UPWPs Bus Lane Feasibility Study under Transit Planning Task (44.26.6.13).
This project was funded from RG131. C rolled over.
|
Albany, CDTA |
|
STP-Flex |
0.120 |
|
|
.120 S |
|
|
|
|
Total |
0.120 |
  |
  |
.120    |
  |
  |
  |
  |
Pro. Service |
0.120 |
  |
  |
.120    |
  |
  |
  |
  |
|
Agency: CDTA
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Non-Exempt
|
|
|
T127 |
1824.63 |
CapitalVeh |
2019-24 |
|
Center for Disability Services
4 Replacement Vehicles- 1 Lot K (28 seat) and 3 Lot I (20 seat)
|
Regional, Multiple |
|
Sec 5310 |
0.456 |
|
.456 V |
|
|
|
|
|
Total |
0.456 |
  |
.456    |
  |
  |
  |
  |
  |
Vehicles |
0.456 |
  |
.456    |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
T128 |
1824.64 |
CapitalVeh |
2019-24 |
|
Schenectady County, NYSARC
2 Replacement Vehicles - Lot I (30 seat)
|
Regional, Multiple |
|
Sec 5310 |
0.205 |
|
.205 V |
|
|
|
|
|
Total |
0.205 |
  |
.205    |
  |
  |
  |
  |
  |
Vehicles |
0.205 |
  |
.205    |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
T129 |
1824.65 |
CapitalVeh |
2019-24 |
|
Northeast Health Foundation 4 Replacement Vehicles - Lot E (11 seat)
|
Regional, Multiple |
|
Sec 5310 |
0.275 |
|
.275 V |
|
|
|
|
|
Total |
0.275 |
  |
.275    |
  |
  |
  |
  |
  |
Vehicles |
0.275 |
  |
.275    |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
T130 |
1824.66 |
CapitalVeh |
2019-24 |
|
Colonie Senior Service Centers 1 Replacement Vehicle - Lot E (11 seat) & hardware & software (dispatch software & 16 mobile tablets)
|
Regional, Multiple |
|
Sec 5310 |
0.092 |
|
.092 V |
|
|
|
|
|
Total |
0.092 |
  |
.092    |
  |
  |
  |
  |
  |
Vehicles |
0.092 |
  |
.092    |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
T131 |
1824.67 |
CapitalVeh |
2019-24 |
|
St. Peter's Hospital Foundation 1 Replacement Vehicle - Lot E (11 seat)
|
Regional, Multiple |
|
Sec 5310 |
0.069 |
|
.069 V |
|
|
|
|
|
Total |
0.069 |
  |
.069    |
  |
  |
  |
  |
  |
Vehicles |
0.069 |
  |
.069    |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
T132 |
1824.68 |
CapitalVeh |
2019-24 |
|
Town of Guilderland 1 Expansion Vehicle - LOT J (24 seat)
|
Regional, Multiple |
|
Sec 5310 |
0.145 |
|
.145 V |
|
|
|
|
|
Total |
0.145 |
  |
.145    |
  |
  |
  |
  |
  |
Vehicles |
0.145 |
  |
.145    |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
T133 |
1824.69 |
CapitalVeh |
2019-24 |
|
NYSARC, Saratoga County Chapter 2 Replacement Vehicles – 1 LOT K (28 seats) and 1 Lot G (14 seats)
|
Regional, Multiple |
|
5310-Sar |
0.224 |
|
.224 V |
|
|
|
|
|
Total |
0.224 |
  |
.224    |
  |
  |
  |
  |
  |
Vehicles |
0.224 |
  |
.224    |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
T134
|
1824.71 |
Trans.Misc |
2019-24 |
|
Washington/Western BRT Phase 4
Match varies by phase and totals $14.305M.
This is the final phase of the BRT purple line.
|
Albany, CDTA |
|
Sec 5309 |
75.194 |
|
|
33.604 C |
|
|
|
|
Sec 5309 |
|
|
|
17.372 V |
|
|
|
|
Sec 5309 |
|
|
|
12.674 S |
|
|
|
|
Sec 5309 |
|
|
|
10.014 F |
|
|
|
|
Sec 5309 |
|
|
|
1.530 R |
|
|
|
|
ARP |
2.491 |
|
|
|
|
1.491 C |
|
|
ARP |
|
|
|
|
|
1.000 F |
|
|
Total |
77.685 |
  |
  |
75.194    |
  |
2.491    |
  |
  |
Construct'n |
35.095 |
  |
  |
33.604    |
  |
1.491    |
  |
  |
Vehicles |
17.372 |
  |
  |
17.372    |
  |
  |
  |
  |
Pro. Service |
12.674 |
  |
  |
12.674    |
  |
  |
  |
  |
Facilities |
11.014 |
  |
  |
10.014    |
  |
1.000    |
  |
  |
ROW Aquis'n |
1.530 |
  |
  |
1.530    |
  |
  |
  |
  |
|
Agency: CDTA
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Non-Exempt
|
|
|
T135
|
CDTC135 |
CapitalVeh |
2019-24 |
|
Retrofit Buses with UV Disinfecting System
Retrofit the existing fixed route fleet with ultra-violet disinfecting technology to help prevent the spread of coronavirus. Future vehicle purchases will include this.
|
Regional, CDTA |
|
Sec 5307 |
0.825 |
|
|
.825 V |
|
|
|
|
Total |
0.825 |
  |
  |
.825    |
  |
  |
  |
  |
Vehicles |
0.825 |
  |
  |
.825    |
  |
  |
  |
  |
|
Agency: CDTA
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
T136
|
CDTC136 |
Prob Asses |
2019-24 |
|
Bus Rapid Transit Expansion Study
This study will identify multiple corridors for the expansion of CDTA's BRT system.
This project was funded from RG131.
|
Regional, CDTA |
|
STP-Flex |
0.350 |
|
|
|
.350 S |
|
|
|
Total |
0.350 |
  |
  |
  |
.350    |
  |
  |
  |
Pro. Service |
0.350 |
  |
  |
  |
.350    |
  |
  |
  |
|
Agency: CDTA
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Non-Exempt
|
|
|
T137
|
CDTC137 |
Trans.Misc |
2019-24 |
|
BusPlus Red Line Upgrades
Icludes the purchase of 60?foot articulated buses, shelter replacements, and new amenities, roadway and lane configuration, traffic calming, pedestrian improvements, raised medians, and transit priority infrastructure.
This project was funded from RG131.
|
Albany, CDTA |
|
NHPP |
9.780 |
|
|
|
|
1.005 D |
|
|
NHPP |
|
|
|
|
|
8.775 C |
|
|
STP-Flex |
5.319 |
|
|
|
|
5.205 V |
|
|
STP-Flex |
|
|
|
|
|
.114 C |
|
|
STP-Urb. |
2.750 |
|
|
|
|
.858 C |
|
|
STP-Urb. |
|
|
|
|
|
1.892 D |
|
|
Local |
0.657 |
|
|
|
|
.657 C |
|
|
Total |
18.506 |
  |
  |
  |
  |
18.506    |
  |
  |
Detailed Des |
2.897 |
  |
  |
  |
  |
2.897    |
  |
  |
Construct'n |
10.404 |
  |
  |
  |
  |
10.404    |
  |
  |
Vehicles |
5.205 |
  |
  |
  |
  |
5.205    |
  |
  |
|
Agency: CDTA
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Non-Exempt
|
|
|
|
TRANSIT FACILITY DESIGN
DESIGN OF FUTURE CDTA TRANSIT FACILITIES TO ACCOMMODATE FUTURE GROWTH IN SERVICE AREA AND TRANSITION TO ZERO EMISSION BUSES.
|
Regional, CDTA |
|
Sec 5307 |
1.000 |
|
|
|
1.000 P |
|
|
|
Total |
1.000 |
  |
  |
  |
1.000    |
  |
  |
  |
Prelim. Des. |
1.000 |
  |
  |
  |
1.000    |
  |
  |
  |
|
Agency: CDTA
Func. Class:
Plan Ref.:
No EIS Required
AQ Status: Exempt
|
|
|
|
TRANSIT RADIO EQUIPMENT
PURCHASE OF NEW TRANSIT RADIO EQUIPMENT TO ACCOMODATE GROWTH IN SERVICE AREA.
|
Regional, CDTA |
|
Sec 5307 |
0.600 |
|
|
|
.600 V |
|
|
|
Total |
0.600 |
  |
  |
  |
.600    |
  |
  |
  |
Vehicles |
0.600 |
  |
  |
  |
.600    |
  |
  |
  |
|
Agency: CDTA
Func. Class:
Plan Ref.:
No EIS Required
AQ Status: Exempt
|
|
|
|
FLEX MICRO-TRANSIT VEHICLE REPLACEMENT / EXPANSION
PURCHASE OF NEW FLEX VEHICLES FOR MICRO-TRANSIT USE
|
Regional, CDTA |
|
Sec 5307 |
0.560 |
|
|
|
.560 V |
|
|
|
Total |
0.560 |
  |
  |
  |
.560    |
  |
  |
  |
Vehicles |
0.560 |
  |
  |
  |
.560    |
  |
  |
  |
|
Agency: CDTA
Func. Class:
Plan Ref.:
No EIS Required
AQ Status: Exempt
|
|
|
|
NYSARC, INC. SARATOGA COUNTY CHAPTER DBA SARATOGA BRIDGES
2 REPLACEMENT VEHICLES AND 1 NEW VEHICLE FOR NYSARC, INC. SARATOGA COUNTY CHAPTER DBA SARATOGA BRIDGES
|
Regional, State |
|
Sec 5310 |
0.351 |
|
|
|
.351 V |
|
|
|
Total |
0.351 |
  |
  |
  |
.351    |
  |
  |
  |
Vehicles |
0.351 |
  |
  |
  |
.351    |
  |
  |
  |
|
Agency: NYSDOT
Func. Class:
Plan Ref.:
No EIS Required
AQ Status: Exempt
|
|
|
|
Saint PETERS HOSPITAL FOUNDATION DBA SCHUYLER RIDGE HEALTHCARE
1 REPLACEMENT VEHICLE FOR Street PETERS HOSPITAL FOUNDATION DBA SCHUYLER RIDGE HEALTHCARE
|
Regional, State |
|
Sec 5310 |
0.078 |
|
|
|
.078 V |
|
|
|
Total |
0.078 |
  |
  |
  |
.078    |
  |
  |
  |
Vehicles |
0.078 |
  |
  |
  |
.078    |
  |
  |
  |
|
Agency: NYSDOT
Func. Class:
Plan Ref.:
No EIS Required
AQ Status: Exempt
|
|
|
|
SUNNYVIEW HOSPITAL AND REHABILITATION CENTER
1 REPLACEMENT VEHICLE FOR SUNNYVIEW HOSPITAL AND REHABILITATION CENTER
|
Regional, State |
|
Sec 5310 |
0.079 |
|
|
|
.079 V |
|
|
|
Total |
0.079 |
  |
  |
  |
.079    |
  |
  |
  |
Vehicles |
0.079 |
  |
  |
  |
.079    |
  |
  |
  |
|
Agency: NYSDOT
Func. Class:
Plan Ref.:
No EIS Required
AQ Status: Exempt
|
|
|
|
NORTHEAST HEALTH FOUNDATION DBA EDDY SENIOR CARE CONNECTIONS
2 REPLACEMENT VEHICLES FOR NORTHEAST HEALTH FOUNDATION DBA EDDY SENIOR CARE CONNECTIONS
|
Regional, State |
|
Sec 5310 |
0.156 |
|
|
|
.156 V |
|
|
|
Total |
0.156 |
  |
  |
  |
.156    |
  |
  |
  |
Vehicles |
0.156 |
  |
  |
  |
.156    |
  |
  |
  |
|
Agency: NYSDOT
Func. Class:
Plan Ref.:
No EIS Required
AQ Status: Exempt
|
|
|
|
CENTER FOR DISABILITY SERVICES INC
6 REPLACEMENT VEHICLES AND 1 DISPATCH SYSTEM FOR CENTER FOR DISABILITY SERVICES INC
|
Regional, State |
|
Sec 5310 |
1.049 |
|
|
|
1.049 V |
|
|
|
Total |
1.049 |
  |
  |
  |
1.049    |
  |
  |
  |
Vehicles |
1.049 |
  |
  |
  |
1.049    |
  |
  |
  |
|
Agency: NYSDOT
Func. Class:
Plan Ref.:
No EIS Required
AQ Status: Exempt
|
|
|
|
COLONIE SENIOR SERVICE CENTERS INC.
2 REPLACEMENT VEHICLES AND 1 NEW VEHICLE FOR COLONIE SENIOR SERVICE CENTERS INC.
|
Regional, State |
|
Sec 5310 |
0.235 |
|
|
|
.235 V |
|
|
|
Total |
0.235 |
  |
  |
  |
.235    |
  |
  |
  |
Vehicles |
0.235 |
  |
  |
  |
.235    |
  |
  |
  |
|
Agency: NYSDOT
Func. Class:
Plan Ref.:
No EIS Required
AQ Status: Exempt
|
|
|
|
RENSSELAER COUNTY CHAPTER, NYSARC. INC
1 REPLACEMENT VEHICLE FOR RENSSELAER COUNTY CHAPTER, NYSARC. INC
|
, State |
|
Sec 5310 |
0.085 |
|
|
|
.085 V |
|
|
|
Total |
0.085 |
  |
  |
  |
.085    |
  |
  |
  |
Vehicles |
0.085 |
  |
  |
  |
.085    |
  |
  |
  |
|
Agency: NYSDOT
Func. Class:
Plan Ref.:
No EIS Required
AQ Status: Exempt
|
|
|
|
WASHINGTON/WESTERN BRT OPERATIONS SERVICE AND OPERATIONAL EXPENSES (SUCH AS DRIVER SALARIES, BENEFITS, FUEL, BUS MAINTENANCE, ETC.) BEGINNING IN FALL OF 2023. THE BUS PLUS PURPLE LINE WILL OPERATE ON AN EIGHT MILE CORRIDOR IN THE CITY OF ALBANY ALONG WASHINGTON AND WESTERN AVENUES.
CITY OF ALBANY, ALBANY COUNTY, T148 FINAL YEAR OF OPERATIONS RELATED TO CMAQ WILL OCCUR IN 27-28 AND, ALTHOUGH IN THE POST TIP PERIOD, THESE SHOULD BE CONSIDERED COMMITTED LOCAL FUNDS.
|
Albany, CDTA |
|
CMAQ |
3.010 |
|
|
|
|
|
3.010 S |
|
CMAQ |
|
|
|
|
|
|
|
3.110 S |
Local |
  |
|
|
|
|
|
|
9.930 S |
Total |
3.010 |
  |
  |
  |
  |
  |
3.010    |
13.040    |
Pro. Service |
3.010 |
  |
  |
  |
  |
  |
3.010    |
13.040    |
|
Agency: CDTA
Func. Class:
Plan Ref.:
Not Applicable
AQ Status: Exempt
|
|
|
|
INTELLIGENT ROUTE PLANNING FOR SYSTEM EXPANSION & IMPROVEMENTS.
REDESIGN AND RESTRUCTURE SERVICE IN THE REGION WITH ASSISTANCE FROM TRANSPORTATION DATA SOFTWARE IN ORDER TO INTELLIGENTLY RESTORE SERVICES TO PRE-COVID LEVELS, MEET CURRENT NEEDS, EXPAND ACCESS TO LOW-INCOME RIDERS AND DISADVANTAGED NEIGHBORHOODS, AND REDUCE GREENHOUSE GAS EMISSIONS.
MULTI-COUNTY. T149
|
Regional, CDTA |
|
ARP |
0.514 |
|
|
|
|
.514 S |
|
|
Total |
0.514 |
  |
  |
  |
  |
.514    |
  |
  |
Pro. Service |
0.514 |
  |
  |
  |
  |
.514    |
  |
  |
|
Agency: CDTA
Func. Class:
Plan Ref.:
Not Applicable
AQ Status: Exempt
|
|
|