Address : One Park Place Albany, NY 12205-1606

Phone : (518) 458-2161 | Email: cdtc@cdtcmpo.org

2019-24 TIP TIP Number SA312 (PIN 1760.93) < TIP # > | < PIN >
All funds are in matched millions of dollars.

Project Listings |  Interactive Map |  Previous Online TIP's

Project Description

Clifton Park PSAP

Pedestrian safety improvements at: 3 uncontrolled crosswalks & 5 signalized intersections

The funding cap for this project was removed.

C deferred 1 year




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source 2018-19
(Oblig'd)
2019-20
(1st Year)
2020-21
(2nd Year)
2021-22
(3rd Year)
2022-23
(4th Year)
2023-24
(5th Year)
Post '24

Safe-100

0.031 P 0 0.338 C 0 0 0 0

Safe-100

0.031 D 0 0 0 0 0 0

Local

0 0 0.067 C 0 0 0 0

Total

0.062 0 0.405 0 0 0 0



Funding Totals by Phase

Phase Five-Year Funding (2019-20 thru 2023-24) Six-Year Funding (2018-19 thru 2023-24)

Engineering

0

0.062

Construction

0.405

0.405

Total

0.405

0.467




Other Information

TIP Number: SA312 First TIP: 2016-21
PIN: 1760.93 Func. Class: RmA
Project Type: Safety Length: NA
Jurisdiction: Town Plan Ref.: NV
Location: Clifton Park No EIS Required
Implementer: Town Air Quality: Exempt





CDTC Home Page