Address : One Park Place Albany, NY 12205-1606

Phone : (518) 458-2161 | Email: cdtc@cdtcmpo.org

2019-24 TIP TIP Number S258 (PIN 1761.18) < TIP # > | < PIN >
All funds are in matched millions of dollars.

Project Listings |  Interactive Map |  Previous Online TIP's

Project Description

Francis Avenue Over I-890: Bridge Repair or Replace

BIN 2203080 C deferred one year, P & D rolled-over & decreased from .263 each. D rolled over again.




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source 2018-19
(Oblig'd)
2019-20
(1st Year)
2020-21
(2nd Year)
2021-22
(3rd Year)
2022-23
(4th Year)
2023-24
(5th Year)
Post '24

NHPP-95

0 0 2.933 C 0 0 0 0

NHPP-95

0 0.180 P 0.220 D 0 0 0 0

Local

0 0 0.544 C 0 0 0 0

Total

0 0.180 3.697 0 0 0 0



Funding Totals by Phase

Phase Five-Year Funding (2019-20 thru 2023-24) Six-Year Funding (2018-19 thru 2023-24)

Engineering

0.400

0.400

Construction

3.477

3.477

Total

3.877

3.877




Other Information

TIP Number: S258 First TIP: 2016-21
PIN: 1761.18 Func. Class: UMC
Project Type: Bridge R/R Length: NA
Jurisdiction: City Plan Ref.: NV
Location: Schenectady No EIS Required
Implementer: City Air Quality: Exempt





CDTC Home Page