Address : One Park Place Albany, NY 12205-1606

Phone : (518) 458-2161 | Email: cdtc@cdtcmpo.org

2019-24 TIP TIP Number S240 (PIN 1760.40) < TIP # > | < PIN >
All funds are in matched millions of dollars.
This project is based on the project fact sheet used in the 2016-21 TIP Update.

Project Listings |  Interactive Map |  Previous Online TIP's

Project Description

Sunnyside Road from Freemans Bridge Road (NY 911F) to the Village of Scotia Line: Cold Recycling

This project was funded from RG138 . C rolled over three times




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source 2018-19
(Oblig'd)
2019-20
(1st Year)
2020-21
(2nd Year)
2021-22
(3rd Year)
2022-23
(4th Year)
2023-24
(5th Year)
Post '24

STP-Flex

0 0.331 C 0 0 0 0 0

Total

0 0.331 0 0 0 0 0



Funding Totals by Phase

Phase Five-Year Funding (2019-20 thru 2023-24) Six-Year Funding (2018-19 thru 2023-24)

Construction

0.331

0.331

Total

0.331

0.331




Other Information

TIP Number: S240 First TIP: 2016-21
PIN: 1760.40 Func. Class: UMC
Project Type: R&P Length: .76 cl-mi
Jurisdiction: County Plan Ref.: NV
Location: Glenville No EIS Required
Implementer: County Air Quality: Exempt





CDTC Home Page