R195
|
1754.59 |
New Cons'n |
1997-02 |
|
South Troy Industrial Park Road Phase I (Southern End)
Improve existing East Industrial Parkway from Main Street/Burden Avenue (US 4) to northern terminus and construct a new two-lane road from there to Monroe Street, including sidewalks and bike lanes.
Local C below is for water line installation.
Project previously included R195A. R195 & R195A are capped in total. Any funding changes require at least Planning Committee action.
C rolled-over
|
Troy, City, 4000 feet |
|
STP-Flex |
2.839 |
.005 I  |
|
|
|
|
|
|
STP-Flex |
|
|
2.839 C |
|
|
|
|
|
STP-Urb. |
  |
.040 D |
|
|
|
|
|
|
Local |
1.200 |
|
1.200 C |
|
|
|
|
|
Total |
4.039 |
.045    |
4.039    |
  |
  |
  |
  |
  |
ROW Incid. |
  |
.005    |
  |
  |
  |
  |
  |
  |
Construct'n |
4.039 |
  |
4.039    |
  |
  |
  |
  |
  |
Detailed Des |
  |
.040    |
  |
  |
  |
  |
  |
  |
|
Agency: City
Func. Class: UC
Plan Ref.: NV
May Require EIS
AQ Status: Non-Exempt
|
|
|
R195A
|
1761.30 |
New Cons'n |
1997-02 |
|
South Troy Industrial Park Road Phase II (Northern End)
Construct a new two-lane road from Monroe Street to Adams Street, including sidewalks, bike lanes a new bridge over the Poestenkill.
Project previously was included in R195. R195 & R195A are capped in total. Any funding changes require at least Planning Committee action.
I & R rolled over. C deferred 1 year. 30k moved from I to C.
|
Troy, City, 4000 feet |
|
STP-Urb. |
6.417 |
|
.300 D |
|
4.800 C |
|
|
|
STP-Urb. |
|
|
1.200 R |
|
.047 R |
|
|
|
STP-Urb. |
|
|
.070 I  |
|
|
|
|
|
Total |
6.417 |
  |
1.570    |
  |
4.847    |
  |
  |
  |
Detailed Des |
0.300 |
  |
.300    |
  |
  |
  |
  |
  |
Construct'n |
4.800 |
  |
  |
  |
4.800    |
  |
  |
  |
ROW Aquis'n |
1.247 |
  |
1.200    |
  |
.047    |
  |
  |
  |
ROW Incid. |
0.070 |
  |
.070    |
  |
  |
  |
  |
  |
|
Agency: City
Func. Class: UC
Plan Ref.: NV
May Require EIS
AQ Status: Exempt
|
|
|
R277
|
1757.96 |
Bike/Ped |
2007-12 |
|
Lansingburgh Sidewalks
Pedestrian improvements along 116th St., 114th St., 113th St., and bicycle connections between 114th St. from Gurley Avenue to 2nd Ave.
As of 5/4/11 this project is not capped.
Funded via RG103 & was, changed to STP- Flex upon CMAQ termination.
|
Troy, City, 675 linear feet |
|
STP-Flex |
  |
|
|
|
|
|
|
.097 C |
STP-Flex |
|
|
|
|
|
|
|
.031 P |
Total |
  |
  |
  |
  |
  |
  |
  |
.128    |
Construct'n |
  |
  |
  |
  |
  |
  |
  |
.097    |
Prelim. Des. |
  |
  |
  |
  |
  |
  |
  |
.031    |
|
Agency: City
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R278
|
1757.98 |
Traff Op'n |
2007-12 |
|
126th Street/US 4 (2nd Avenue)
This was programmed as a top candidate for a roundabout. Final design depends on the project design process.
The roundabout includes streetscape improvements and crosswalks.
Funded via RG103 & was, changed to STP- Flex upon CMAQ termination.
|
Troy, City, NA |
|
STP-Flex |
  |
|
|
|
|
|
|
1.100 C |
STP-Flex |
|
|
|
|
|
|
|
.264 P |
STP-Flex |
|
|
|
|
|
|
|
.011 I  |
Total |
  |
  |
  |
  |
  |
  |
  |
1.375    |
Construct'n |
  |
  |
  |
  |
  |
  |
  |
1.100    |
Prelim. Des. |
  |
  |
  |
  |
  |
  |
  |
.264    |
ROW Incid. |
  |
  |
  |
  |
  |
  |
  |
.011    |
|
Agency: City
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R287
|
1758.15 |
Br.Replace |
2007-12 |
|
CR 68 (Snyder's Lake Road) Large Culvert and Bridge Over Wynantskill Creek
Bridge is replacement of BIN 3303610
Culvert to be Replaced with a Precast Box Culvert, Located between NY 150 and BIN 3303610. Culvert funded from RG138.
Includes former R312. C phase rolled over, then deferred 1 year twice, R added by DOT rolled over
|
Poestenkill, County |
|
STP-Urb. |
1.545 |
|
|
.034 R |
1.511 C |
|
|
|
Total |
1.545 |
  |
  |
.034    |
1.511    |
  |
  |
  |
ROW Aquis'n |
0.034 |
  |
  |
.034    |
  |
  |
  |
  |
Construct'n |
1.511 |
  |
  |
  |
1.511    |
  |
  |
  |
|
Agency: County
Func. Class: UMC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R289 |
1758.14 |
Br.Replace |
2010-15 |
|
CR 114 Over Powamppokonk Creek: Bridge Replacement
BIN 3304080
|
Schaghticoke (T), County |
|
STP-Off |
  |
1.340 C |
|
|
|
|
|
|
Total |
  |
1.340    |
  |
  |
  |
  |
  |
  |
Construct'n |
  |
1.340    |
  |
  |
  |
  |
  |
  |
|
Agency: County
Func. Class: RmC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R292
|
1758.38 |
Reconst'n |
2010-15 |
|
US 4, Couse Corners to Mannix Road: Corridor Improvements
More information is in the 2013-18 TIP project listing.
|
East Greenbush, State, Ln-Mi |
|
STP-Flex |
  |
|
|
|
|
|
|
5.940 C |
STP-Flex |
|
|
|
|
|
|
|
.350 D |
STP-Flex |
|
|
|
|
|
|
|
.050 R |
STP-Flex |
|
|
|
|
|
|
|
.400 P |
Total |
  |
  |
  |
  |
  |
  |
  |
6.740    |
Construct'n |
  |
  |
  |
  |
  |
  |
  |
5.940    |
Detailed Des |
  |
  |
  |
  |
  |
  |
  |
.350    |
ROW Aquis'n |
  |
  |
  |
  |
  |
  |
  |
.050    |
Prelim. Des. |
  |
  |
  |
  |
  |
  |
  |
.400    |
|
Agency: Town
Func. Class:
Plan Ref.: HWY Cond
No EIS Required
AQ Status: Exempt
|
|
|
R295
|
1759.15 |
Safety |
2010-15 |
|
21st Street Realignment & Hoosick Street/Burdett Avenue Intersection
More information is in the 2013-18 TIP project listing.
|
Troy, City |
|
Safety |
  |
|
|
|
|
|
|
1.015 C |
Safety |
|
|
|
|
|
|
|
.140 P |
Safety |
|
|
|
|
|
|
|
.140 D |
Safety |
|
|
|
|
|
|
|
.075 R |
Total |
  |
  |
  |
  |
  |
  |
  |
1.370    |
Construct'n |
  |
  |
  |
  |
  |
  |
  |
1.015    |
Prelim. Des. |
  |
  |
  |
  |
  |
  |
  |
.140    |
Detailed Des |
  |
  |
  |
  |
  |
  |
  |
.140    |
ROW Aquis'n |
  |
  |
  |
  |
  |
  |
  |
.075    |
|
Agency: City
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R296
|
1758.93 |
BridgeMisc |
2010-15 |
|
East Road (CR 33) over Kinderhook Creek: Element Specific Bridge Repair
Bin: 3303760
Construction and ROW were funded from RG126.
|
Stephentown, County |
|
STP-Off |
  |
|
|
|
|
|
|
.550 C |
STP-Off |
|
|
|
|
|
|
|
.075 P |
STP-Off |
|
|
|
|
|
|
|
.075 D |
STP-Off |
|
|
|
|
|
|
|
.021 R |
Total |
  |
  |
  |
  |
  |
  |
  |
.721    |
Construct'n |
  |
  |
  |
  |
  |
  |
  |
.550    |
Prelim. Des. |
  |
  |
  |
  |
  |
  |
  |
.075    |
Detailed Des |
  |
  |
  |
  |
  |
  |
  |
.075    |
ROW Aquis'n |
  |
  |
  |
  |
  |
  |
  |
.021    |
|
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R309
|
1043.58 |
Bike/Ped |
2016-21 |
|
US 9 and 20 Sidewalk Construction from Bruen Court to the Rensselaer City Line
P has been delayed one year.
I & R and additional funds for P & D were added by DOT. C deferred 1 year R rolled over. R folded into C and C increased by another 48K. The total increase is $102K.
Local funds are from CDTA for a concrete pad for a bus shelter
|
East Greenbush, State, 1940 ft |
|
STP-Urb. |
0.675 |
.077 D |
|
.675 C |
|
|
|
|
STP-Urb. |
|
.078 P |
|
|
|
|
|
|
STP-Urb. |
|
.009 I  |
|
|
|
|
|
|
Local |
0.006 |
|
|
.006 C |
|
|
|
|
Total |
0.681 |
.164    |
  |
.681    |
  |
  |
  |
  |
Detailed Des |
  |
.077    |
  |
  |
  |
  |
  |
  |
Construct'n |
0.681 |
  |
  |
.681    |
  |
  |
  |
  |
Prelim. Des. |
  |
.078    |
  |
  |
  |
  |
  |
  |
ROW Incid. |
  |
.009    |
  |
  |
  |
  |
  |
  |
|
Agency: Town
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R310
|
1760.34 |
Bike/Ped |
2016-21 |
|
Sand Lake Hamlets Sidewalks & Multi-Use Path
1820 feet of new sidewalk in Sand Lake, Replace 43 pieces of sidewalk and other sidewalk repairs in 33 locations in West Sand Lake, 1400 feet of new multi-use path
NYSDOT deferred C one year twice, then advanced via amendment.
|
Sand Lake, Multiple, 3250 ft |
|
STP-Urb. |
0.723 |
.049 P |
|
.723 C |
|
|
|
|
STP-Urb. |
|
.049 D |
|
|
|
|
|
|
State |
0.233 |
|
|
.233 C |
|
|
|
|
Total |
0.956 |
.098    |
  |
.956    |
  |
  |
  |
  |
Prelim. Des. |
  |
.049    |
  |
  |
  |
  |
  |
  |
Construct'n |
0.956 |
  |
  |
.956    |
  |
  |
  |
  |
Detailed Des |
  |
.049    |
  |
  |
  |
  |
  |
  |
|
Agency: Town
Func. Class: Mult
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R313
|
1001.32 |
Br.Replace |
2016-21 |
|
NY 2 over NY 22 Bridge: Replacement
BIN 1000250
P rolled-over and increased by 81k. NYSDOT added 250k in 20-21 for P, totalling 331k added. D deferred one year, C deferred one year twice. 75k moved from D to P.
|
Petersburgh, State |
|
NHPP |
6.851 |
|
.216 P |
.325 P |
.250 D |
|
|
|
NHPP |
|
|
|
|
6.060 C |
|
|
|
Total |
6.851 |
  |
.216    |
.325    |
6.310    |
  |
  |
  |
Prelim. Des. |
0.541 |
  |
.216    |
.325    |
  |
  |
  |
  |
Detailed Des |
0.250 |
  |
  |
  |
.250    |
  |
  |
  |
Construct'n |
6.060 |
  |
  |
  |
6.060    |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: RmA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R314
|
1760.49 |
BridgeMisc |
2016-21 |
|
CR 129 (Tamarac Road): Replace Large Culvert with an Aluminum Box Culvert
Located between NY 7 and Storm Hill Rd.
This project was funded from RG138. C rolled over and deferred 1 year
|
Pittstown, County |
|
STP-Flex |
0.513 |
|
|
|
.513 C |
|
|
|
Total |
0.513 |
  |
  |
  |
.513    |
  |
  |
  |
Construct'n |
0.513 |
  |
  |
  |
.513    |
  |
  |
  |
|
Agency: County
Func. Class: RMC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R315
|
1043.57 |
Br.Replace |
2016-21 |
|
US 9 Bridge over I-90 (Exit 11): Replacement
BIN 1092730 P & D rolled over twice. C rolled over and was deferred one year
|
Schodack, State |
|
NHPP |
10.917 |
|
|
|
|
|
9.917 C |
|
NHPP |
|
|
|
|
.500 P |
|
|
|
NHPP |
|
|
|
|
.500 D |
|
|
|
Total |
10.917 |
  |
  |
  |
1.000    |
  |
9.917    |
  |
Construct'n |
9.917 |
  |
  |
  |
  |
  |
9.917    |
  |
Prelim. Des. |
0.500 |
  |
  |
  |
.500    |
  |
  |
  |
Detailed Des |
0.500 |
  |
  |
  |
.500    |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R316
|
1001.36 |
Br.Replace |
2016-21 |
|
NY 2 Bridge over the Poestenkill: Replacement
BIN 1000190 R rolled over. D added by DOT. NSDOT moved 2k from R to I
|
Brunswick, State |
|
NHPP |
3.898 |
|
3.658 C |
|
|
|
|
|
NHPP |
|
|
.200 D |
|
|
|
|
|
NHPP |
|
|
.038 R |
|
|
|
|
|
NHPP |
|
|
.002 I  |
|
|
|
|
|
Total |
3.898 |
  |
3.898    |
  |
  |
  |
  |
  |
Construct'n |
3.658 |
  |
3.658    |
  |
  |
  |
  |
  |
Detailed Des |
0.200 |
  |
.200    |
  |
  |
  |
  |
  |
ROW Aquis'n |
0.038 |
  |
.038    |
  |
  |
  |
  |
  |
ROW Incid. |
0.002 |
  |
.002    |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R318
|
1760.36 |
Reconst'n |
2016-21 |
|
East Street from Partition St. to Third Ave.: Reconstruction
Improvements to pavement, and pedestrian accommodations.
Local funds will provide storm water, and sanitary sewer separation and utilities.
|
Rensselaer, City, .61 cl-mi |
|
STP-Urb. |
  |
1.851 C |
|
|
|
|
|
|
Total |
  |
1.851    |
  |
  |
  |
  |
  |
  |
Construct'n |
  |
1.851    |
  |
  |
  |
  |
  |
  |
|
Agency: City
Func. Class: UMC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R320
|
1089.75 |
Traff Op'n |
2016-21 |
|
NY 4 from the Troy City Line to NY 43: Highway, Intersection, ADA, Bike/Ped and Streetscape Improvements
NY547, PROGRAM CODE RPS9 & NY060, PROGRAM CODE RPS0
This project includes R321 from the 2016-21 TIP.
NYSDOT moved .231M from R & I to C.
|
North Greenbush, Town, 2.8 cl-mi |
|
Demo. |
  |
.300 P |
|
|
|
|
|
|
Demo. |
|
.297 R |
|
|
|
|
|
|
Demo. |
|
.343 D |
|
|
|
|
|
|
Demo. |
|
8.566 C |
|
|
|
|
|
|
Total |
  |
9.506    |
  |
  |
  |
  |
  |
  |
Prelim. Des. |
  |
.300    |
  |
  |
  |
  |
  |
  |
ROW Aquis'n |
  |
.297    |
  |
  |
  |
  |
  |
  |
Detailed Des |
  |
.343    |
  |
  |
  |
  |
  |
  |
Construct'n |
  |
8.566    |
  |
  |
  |
  |
  |
  |
|
Agency: Town
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R322
|
1760.69 |
Br.Replace |
2016-21 |
|
Murdock Road Bridge over the Tsatsawassa Creek: Bridge Replacement
BIN 2201870
Capped at the dollar amounts shown. The 20% local match is 5% local and 15% toll credits.
|
Nassau (T), County |
|
STPOffNY |
  |
.952 C |
|
|
|
|
|
|
STPOffNY |
|
.015 R |
|
|
|
|
|
|
Total |
  |
.967    |
  |
  |
  |
  |
  |
  |
Construct'n |
  |
.952    |
  |
  |
  |
  |
  |
  |
ROW Aquis'n |
  |
.015    |
  |
  |
  |
  |
  |
  |
|
Agency: County
Func. Class: RmC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R323
|
1760.84 |
Bike/Ped |
2016-21 |
|
Rensselaer Riverfront Multi-Use Trail
This project constructs 3750 feet of multi-use trail and 100 feet of bike/ped accomodations between DeLaet's Landing and Riverfront Park.
These funds are capped. R & C were deferred one year. R & C then rolled over.
|
Rensselaer, City, 4750 feet |
|
TAP |
1.423 |
.017 I  |
|
|
.037 D |
|
1.086 C |
|
TAP |
|
.038 D |
|
|
.273 R |
|
|
|
TAP |
|
.122 P |
|
|
.027 I  |
|
|
|
Total |
1.423 |
.177    |
  |
  |
.337    |
  |
1.086    |
  |
ROW Incid. |
0.027 |
.017    |
  |
  |
.027    |
  |
  |
  |
Detailed Des |
0.037 |
.038    |
  |
  |
.037    |
  |
  |
  |
Construct'n |
1.086 |
  |
  |
  |
  |
  |
1.086    |
  |
ROW Aquis'n |
0.273 |
  |
  |
  |
.273    |
  |
  |
  |
Prelim. Des. |
  |
.122    |
  |
  |
  |
  |
  |
  |
|
Agency: City
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R324 |
1933.49 |
Safety |
2016-21 |
|
Howland Avenue (formerly Depot Hill Road): Grade Crossing Signal Upgrade
Installation of Automatic Gates, Flashing Lights and Pavement Repair
|
Schaghticoke (T), Town |
|
Rail |
0.305 |
|
.305 C |
|
|
|
|
|
Total |
0.305 |
  |
.305    |
  |
  |
  |
  |
  |
Construct'n |
0.305 |
  |
.305    |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: RL
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R325 |
1933.50 |
Safety |
2016-21 |
|
Old Schaghticoke Road: Grade Crossing Signal Upgrade
Installation of Automatic Gates, Flashing Lights and Pavement Repair
|
Schaghticoke (T), Town |
|
Rail |
0.625 |
|
.625 C |
|
|
|
|
|
Total |
0.625 |
  |
.625    |
  |
  |
  |
  |
  |
Construct'n |
0.625 |
  |
.625    |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: RmA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R326
|
1760.87 |
Bike/Ped |
2016-21 |
|
Hoosic River Greenway Trail Enhancement
First phase of a proposed 2.2-mile trail Includes a 700-foot trail extension from the current terminus to Sewer Plant Road, installation of a 5-car trailhead parking lot, and trailhead amenities
This is a Recreational Trails project C rolled-over, then delayed 2 years. D was added because it was never obligated.
|
Hoosick Falls, Town, 700 Ft |
|
FA |
0.120 |
|
.015 D |
|
.105 C |
|
|
|
Total |
0.120 |
  |
.015    |
  |
.105    |
  |
  |
  |
Detailed Des |
0.015 |
  |
.015    |
  |
  |
  |
  |
  |
Construct'n |
0.105 |
  |
  |
  |
.105    |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R327
|
1760.94 |
Safety |
2016-21 |
|
City of Rensselaer PSAP
Pedestrian safety improvements at 6 signalized intersections
The funding cap for this project was removed.
|
Rensselaer, City |
|
Safe-100 |
0.450 |
.025 P |
|
.450 C |
|
|
|
|
Safe-100 |
|
.025 D |
|
|
|
|
|
|
Total |
0.450 |
.050    |
  |
.450    |
  |
  |
  |
  |
Prelim. Des. |
  |
.025    |
  |
  |
  |
  |
  |
  |
Construct'n |
0.450 |
  |
  |
.450    |
  |
  |
  |
  |
Detailed Des |
  |
.025    |
  |
  |
  |
  |
  |
  |
|
Agency: City
Func. Class: Mult
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R328
|
1761.19 |
Bridge R/R |
2016-21 |
|
Campbell Avenue over Wynantskill: Bridge Repair or Replace
P & D rolled-over, C deferred one year $147K remains unspent from D. Local amount added as shown
BIN 2202290
|
Troy, City |
|
NHPP-95 |
3.777 |
|
.325 P |
3.127 C |
|
|
|
|
NHPP-95 |
|
|
.325 D |
|
|
|
|
|
Local |
0.307 |
|
|
.307 C |
|
|
|
|
Total |
4.084 |
  |
.650    |
3.434    |
  |
  |
  |
  |
Prelim. Des. |
0.325 |
  |
.325    |
  |
  |
  |
  |
  |
Construct'n |
3.434 |
  |
  |
3.434    |
  |
  |
  |
  |
Detailed Des |
0.325 |
  |
.325    |
  |
  |
  |
  |
  |
|
Agency: City
Func. Class: UmA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R329
|
1761.24 |
Bridge R/R |
2016-21 |
|
Stop 13 Road over Wynantskill: Bridge Repair or Replace
BIN 2201960
NYSDOT moved funds between P, D & I and from C to R.
C rolled over twice Bridge NY
|
Sand Lake, Town |
|
STPOffNY |
1.026 |
.076 D |
|
|
.987 C |
|
|
|
STPOffNY |
|
.132 P |
.039 R |
|
|
|
|
|
STPOffNY |
|
.017 I  |
|
|
|
|
|
|
Local |
0.250 |
|
|
|
.250 C |
|
|
|
Total |
1.276 |
.225    |
.039    |
  |
1.237    |
  |
  |
  |
Detailed Des |
  |
.076    |
  |
  |
  |
  |
  |
  |
Construct'n |
1.237 |
  |
  |
  |
1.237    |
  |
  |
  |
Prelim. Des. |
  |
.132    |
  |
  |
  |
  |
  |
  |
ROW Aquis'n |
0.039 |
  |
.039    |
  |
  |
  |
  |
  |
ROW Incid. |
  |
.017    |
  |
  |
  |
  |
  |
  |
|
Agency: Town
Func. Class: UL
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R330
|
1188.39 |
Br.Replace |
2019-24 |
|
NY 67 Over B&M RR: Bridge Replacement
BIN 1303390
|
Schaghticoke (T), State |
|
NHPP |
7.164 |
|
|
|
.450 P |
.200 R |
|
|
NHPP |
|
|
|
|
.050 I  |
.450 D |
|
|
NHPP |
|
|
|
|
|
6.014 C |
|
|
Total |
7.164 |
  |
  |
  |
.500    |
6.664    |
  |
  |
Prelim. Des. |
0.450 |
  |
  |
  |
.450    |
  |
  |
  |
ROW Aquis'n |
0.200 |
  |
  |
  |
  |
.200    |
  |
  |
ROW Incid. |
0.050 |
  |
  |
  |
.050    |
  |
  |
  |
Detailed Des |
0.450 |
  |
  |
  |
  |
.450    |
  |
  |
Construct'n |
6.014 |
  |
  |
  |
  |
6.014    |
  |
  |
|
Agency: NYSDOT
Func. Class: RmA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R331
|
1761.75 |
Br.Replace |
2019-24 |
|
South Street Bridge: Bridge Replacement & Pedestrian Improvements
South Street between 2nd Avenue and Aiken Avenue
BIN 2202200
NYSDOT moved 7k from R to I after the amendment, D, R & C were deferred one year I rolled over
|
Rensselaer, City |
|
STP-Urb. |
2.193 |
|
.150 P |
|
|
|
1.843 C |
|
STP-Urb. |
|
|
|
|
.150 D |
|
|
|
STP-Urb. |
|
|
|
.022 I  |
.028 R |
|
|
|
Total |
2.193 |
  |
.150    |
.022    |
.178    |
  |
1.843    |
  |
Prelim. Des. |
0.150 |
  |
.150    |
  |
  |
  |
  |
  |
Construct'n |
1.843 |
  |
  |
  |
  |
  |
1.843    |
  |
Detailed Des |
0.150 |
  |
  |
  |
.150    |
  |
  |
  |
ROW Incid. |
0.022 |
  |
  |
.022    |
  |
  |
  |
  |
ROW Aquis'n |
0.028 |
  |
  |
  |
.028    |
  |
  |
  |
|
Agency: City
Func. Class: UL
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
Best Road (CR 55) from Sand Lake Town Line to NY 150: Overlay
C deferred 1 year
This PIN was merged into PIN 1761.70 (R333) in March 2022.
|
Sand Lake, County, 1.64 cl-mi |
|
Total |
  |
  |
  |
  |
  |
  |
  |
  |
|
Agency: County
Func. Class: RMC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
Eastern Union Turnpike (CR 49) from Glass Lake Road to NY 43: Overlay and and BEST ROAD (CR 55): OVERLAY, FROM SAND LAKE TOWN LINE TO NY 150
C deferred 1 year
This PIN now includes PIN 1761.77 (R332). Projects Merged in March 2022.
P and D phases will be performed in-house by the County. All funds from PIN 1761.77 (R332) combined into C.
|
Sand Lake, County, 1.3 cl-mi |
|
STP-Flex |
0.604 |
|
|
|
.604 C |
|
|
|
Total |
0.604 |
  |
  |
  |
.604    |
  |
  |
  |
Construct'n |
0.604 |
  |
  |
  |
.604    |
  |
  |
  |
|
Agency: County
Func. Class: UMC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
Fogarty Road (CR 126) Wetsel Road to Pittstown Town Line: Overlay
C rolled over and deferred 1 year D rolled over
The County completed the project using non-federal funds. This project has been removed from the TIP.
|
Schaghticoke (T), County, .65 cl-mi |
|
Total |
  |
  |
  |
  |
  |
  |
  |
  |
|
Agency: County
Func. Class: UmC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
Pershing Avenue (CR 68)from Troy Avenue to Peck Road: Overlay
C rolled over and deferred 1 year D rolled over twice
This was combined with R337in August 2021.In November 2021 the scope and cost of R337 was removed. Scope and funding returned to original programming.
|
North Greenbush, County, 0.84 cl-mi |
|
STP-Urb. |
0.238 |
|
.002 P |
|
.234 C |
|
|
|
STP-Urb. |
|
|
|
|
.002 D |
|
|
|
Total |
0.238 |
  |
.002    |
  |
.236    |
  |
  |
  |
Prelim. Des. |
0.002 |
  |
.002    |
  |
  |
  |
  |
  |
Construct'n |
0.234 |
  |
  |
  |
.234    |
  |
  |
  |
Detailed Des |
0.002 |
  |
  |
  |
.002    |
  |
  |
  |
|
Agency: County
Func. Class: UMC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
River Road (CR 120) from CR 125 to Washington County Line: Overlay
The County completed this project using non-federal funds. This project has been removed from the TIP.
|
Schaghticoke (T), County, .92 cl-mi |
|
Total |
  |
  |
  |
  |
  |
  |
  |
  |
|
Agency: County
Func. Class: UmC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
Snyders Lake Road (CR 68) from CR 65 (Bloomingrove Drive) to Troy Avenue: Overlay
C rolled over and deferred 1 year D rolled over
This was combined in August 2021 with R335.In November 2021 the scope and cost of R337 was removed from R335. The project was completed by the County using non-federal funds.
|
North Greenbush, County, 2.62 cl-mi |
|
Total |
  |
  |
  |
  |
  |
  |
  |
  |
|
Agency: County
Func. Class: UmC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
Third Avenue from the Bridge to City/Town Line: Pavement Rehabilitation & Bike/Ped Improvements
D rolled over
|
Rensselaer, City, .29 cl-mi |
|
STP-Urb. |
0.575 |
|
.040 P |
.040 D |
|
|
|
|
STP-Urb. |
|
|
|
.495 C |
|
|
|
|
Total |
0.575 |
  |
.040    |
.535    |
  |
  |
  |
  |
Prelim. Des. |
0.040 |
  |
.040    |
  |
  |
  |
  |
  |
Detailed Des |
0.040 |
  |
  |
.040    |
  |
  |
  |
  |
Construct'n |
0.495 |
  |
  |
.495    |
  |
  |
  |
  |
|
Agency: City
Func. Class: UmA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
NY 2 (Congress and Ferry Streets) from 11th Street to the Congress Street Bridge Ramps: Corridor Improvements
Includes: Mill & Fill, restriping to one driving lane each, repair 50% of sidewalks, add curb extensions and bike lanes
P & D were advanced one year
|
Troy, City, 1.23 cl-mi |
|
STP-Urb. |
4.035 |
|
|
|
.284 D |
|
|
|
STP-Urb. |
|
|
|
|
.284 P |
|
3.467 C |
|
Total |
4.035 |
  |
  |
  |
.568    |
  |
3.467    |
  |
Detailed Des |
0.284 |
  |
  |
  |
.284    |
  |
  |
  |
Prelim. Des. |
0.284 |
  |
  |
  |
.284    |
  |
  |
  |
Construct'n |
3.467 |
  |
  |
  |
  |
  |
3.467    |
  |
|
Agency: City
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R340
|
1089.79 |
Safety |
2019-24 |
|
Intersection of US 4 and I-90: Intersection Safety Improvements
The scope has been finalized to be a modern roundabout as a safety enhancement.
The Local funds were added as developer mitigation funding for capacity enhancements at the following intersections: US 4 & Hampton Inn Drive, US 4 & NY 151, and NY 151 & Tempel Lane
P & D were advanced by NYSDOT. C was advanced 2 years
|
East Greenbush, State |
|
Safety |
4.726 |
|
.584 P |
.292 D |
|
|
|
|
Safety |
|
|
|
3.850 C |
|
|
|
|
Local |
2.265 |
|
|
.015 R |
|
|
|
|
Local |
|
|
|
2.250 C |
|
|
|
|
Total |
6.991 |
  |
.584    |
6.407    |
  |
  |
  |
  |
Prelim. Des. |
0.584 |
  |
.584    |
  |
  |
  |
  |
  |
Detailed Des |
0.292 |
  |
  |
.292    |
  |
  |
  |
  |
Construct'n |
6.100 |
  |
  |
6.100    |
  |
  |
  |
  |
ROW Aquis'n |
0.015 |
  |
  |
.015    |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: UI
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
I-90 Exit 10 to NYS Thruway: Pavement Corrective Maintenance
P, D & C advanced 2 years D rolled over
|
Schodack, State, 6.45 cl-mi |
|
NHPP |
8.541 |
|
.300 P |
.300 D |
|
|
|
|
NHPP |
|
|
|
7.941 C |
|
|
|
|
Total |
8.541 |
  |
.300    |
8.241    |
  |
  |
  |
  |
Prelim. Des. |
0.300 |
  |
.300    |
  |
  |
  |
  |
  |
Detailed Des |
0.300 |
  |
  |
.300    |
  |
  |
  |
  |
Construct'n |
7.941 |
  |
  |
7.941    |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: RI
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
I-90 Hudson River to Exit 10: Pavement Corrective Maintenance
P & D advanced 2 years, C advanced 1 year
|
Multiple, State, 7.1 cl-mi |
|
NHPP |
11.800 |
|
.300 P |
|
|
|
|
|
NHPP |
|
|
.300 D |
|
|
11.200 C |
|
|
Total |
11.800 |
  |
.600    |
  |
  |
11.200    |
  |
  |
Prelim. Des. |
0.300 |
  |
.300    |
  |
  |
  |
  |
  |
Detailed Des |
0.300 |
  |
.300    |
  |
  |
  |
  |
  |
Construct'n |
11.200 |
  |
  |
  |
  |
11.200    |
  |
  |
|
Agency: NYSDOT
Func. Class: RI
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R343 |
1045.17 |
BridgeMisc |
2019-24 |
|
NY 378 Over Hudson: Bridge Paint
BIN 1062850
The other half of this project is A600.
|
Multiple, State |
|
NHPP |
3.428 |
|
|
|
.128 P |
3.150 C |
|
|
NHPP |
|
|
|
|
|
.150 D |
|
|
Total |
3.428 |
  |
  |
  |
.128    |
3.300    |
  |
  |
Prelim. Des. |
0.128 |
  |
  |
  |
.128    |
  |
  |
  |
Construct'n |
3.150 |
  |
  |
  |
  |
3.150    |
  |
  |
Detailed Des |
0.150 |
  |
  |
  |
  |
.150    |
  |
  |
|
Agency: NYSDOT
Func. Class: UPE
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R344
|
1045.18 |
Prob Asses |
2019-24 |
|
NY 378 Troy Menands Bridge Study
Bridge Replacement Study: Evaluate options to relocate the bridge to a location TBD. Bike/ped accommodations will be evaluated.
The other half of this project is A605. Rolled over
|
Multiple, State |
|
NHPP-NY |
0.433 |
|
|
.433 P |
|
|
|
|
Total |
0.433 |
  |
  |
.433    |
  |
  |
  |
  |
Prelim. Des. |
0.433 |
  |
  |
.433    |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: UPE
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R345
|
1761.83 |
Bike/Ped |
2016-21 |
|
Rensselear Bicycle & Pedestrians Access Improvements
1.8 mile paved, off-road trail through 'The Hollow', 0.81 miles of on-road sharrows & signage, & pedestrian crossing improvements at five intersections.
P rolled over. C deferred 1 year. D rolled over twice
|
Rensselaer, City, 2.6 mi |
|
TAP |
3.070 |
|
.155 P |
.155 D |
|
|
2.760 C |
|
Total |
3.070 |
  |
.155    |
.155    |
  |
  |
2.760    |
  |
Prelim. Des. |
0.155 |
  |
.155    |
  |
  |
  |
  |
  |
Detailed Des |
0.155 |
  |
  |
.155    |
  |
  |
  |
  |
Construct'n |
2.760 |
  |
  |
  |
  |
  |
2.760    |
  |
|
Agency: City
Func. Class: Mult
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R346 |
1761.10 |
BridgeMisc |
2019-24 |
|
Morner Road Over Mill Creek: Culvert
The construction phase includes all other costs.
|
East Greenbush, State |
|
State |
0.497 |
|
.497 C |
|
|
|
|
|
Total |
0.497 |
  |
.497    |
  |
  |
  |
  |
  |
Construct'n |
0.497 |
  |
.497    |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: UL
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R347 |
1761.11 |
BridgeMisc |
2019-24 |
|
Mannix Road Over Mill Creek: Culvert
The construction phase includes all other costs.
|
East Greenbush, State |
|
State |
0.517 |
|
.517 C |
|
|
|
|
|
Total |
0.517 |
  |
.517    |
  |
  |
  |
  |
  |
Construct'n |
0.517 |
  |
.517    |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: UL
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R348 |
1761.14 |
BridgeMisc |
2019-24 |
|
Partition Street Over Quackenderry Creek: Culvert
The construction phase includes all other costs.
|
Rensselaer, State |
|
State |
0.987 |
|
.987 C |
|
|
|
|
|
Total |
0.987 |
  |
.987    |
  |
  |
  |
  |
  |
Construct'n |
0.987 |
  |
.987    |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: UL
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R349
|
1810.29 |
Bike/Ped |
2019-24 |
|
ADA Compliance on NY 4 and NY 9/20
Upgrade Pedestrian Facilities to ADA Compliance, upgrade traffic signal at NY 9/20 and Elliot Road, & install safety features identified in PSAP.
NY 4: NY 9/20 to Genet Elementary School
NY 9/20: Hays Road to NY 4
Partially funded via RG23 & RG118. NYSDOT added the D phase.
|
East Greenbush, State, 1.1 miles |
|
STP-Urb. |
2.097 |
|
.037 I  |
|
|
|
|
|
STP-Urb. |
|
|
.270 R |
|
|
|
|
|
STP-Urb. |
|
|
.240 D |
|
|
|
|
|
STP-Urb. |
|
|
1.550 C |
|
|
|
|
|
Safe-NY |
0.135 |
|
.135 C |
|
|
|
|
|
Total |
2.232 |
  |
2.232    |
  |
  |
  |
  |
  |
ROW Incid. |
0.037 |
  |
.037    |
  |
  |
  |
  |
  |
ROW Aquis'n |
0.270 |
  |
.270    |
  |
  |
  |
  |
  |
Detailed Des |
0.240 |
  |
.240    |
  |
  |
  |
  |
  |
Construct'n |
1.685 |
  |
1.685    |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
VILLAGE OF NASSAU INTERSECTION AND PEDESTRIAN UPGRADES
RE-CONSTRUCT SIDEWALKS AND CROSSWALKS, AND PERFORM SPOT INTERSECTION UPGRADES ALONG CHATHAM Street FROM KAUNAMEEK Street TO CHURCH Street; KAUNAMEEK Street FROM MALDEN Street TO CHATHAM Street; FAIRGROUNDS Street FROM CHATHAM Street TO JOHN Street; JOHN Street FROM ALBANY Avenue TO SOUTH OF SCHOOL Street; AND ADDITIONAL SPOT IMPROVEMENTS.
VILLAGE OF NASSAU, RENSSELAER COUNTY. R354
|
Nassau (V), Village |
|
TAP |
3.071 |
|
|
|
|
.230 P |
|
|
TAP |
|
|
|
|
|
.231 D |
2.610 C |
|
Total |
3.071 |
  |
  |
  |
  |
.461    |
2.610    |
  |
Prelim. Des. |
0.230 |
  |
  |
  |
  |
.230    |
  |
  |
Detailed Des |
0.231 |
  |
  |
  |
  |
.231    |
  |
  |
Construct'n |
2.610 |
  |
  |
  |
  |
  |
2.610    |
  |
|
Agency: Village
Func. Class:
Plan Ref.:
Not Applicable
AQ Status: Exempt
|
|
|
|
TOWN OF SAND LAKE BEACH SIDEWALK CONNECTOR
INSTALL NEW SIDEWALK ALONG NY NY 351 (REICHARDS LAKE ROAD) FROM THE INTERSECTION WITH NY NY 43 TO THE RACQUET LAKE TOWN BEACH AT THE INTERSECTION WITH TOLLGATE ROAD.
TOWN OF SAND LAKE, RENSSELAER COUNTY. R355
|
Sand Lake, Town |
|
TAP |
0.892 |
|
|
|
|
.067 P |
|
|
TAP |
|
|
|
|
|
.067 D |
.758 C |
|
Total |
0.892 |
  |
  |
  |
  |
.134    |
.758    |
  |
Prelim. Des. |
0.067 |
  |
  |
  |
  |
.067    |
  |
  |
Detailed Des |
0.067 |
  |
  |
  |
  |
.067    |
  |
  |
Construct'n |
0.758 |
  |
  |
  |
  |
  |
.758    |
  |
|
Agency: Town
Func. Class:
Plan Ref.:
Not Applicable
AQ Status: Exempt
|
|
|