A290
|
1347.07 |
New Cons'n |
1993-98 |
|
Selkirk Bypass
More information is in the 2013-18 TIP project listing.
Additional funding is dependent on identification of a fund source.
|
Bethlehem, State, 1 Mile |
|
NHPP |
  |
|
|
|
|
|
|
7.985 C |
NHPP |
|
|
|
|
|
|
|
.119 D |
Total |
  |
  |
  |
  |
  |
  |
  |
8.104    |
Construct'n |
  |
  |
  |
  |
  |
  |
  |
7.985    |
Detailed Des |
  |
  |
  |
  |
  |
  |
  |
.119    |
|
Agency: NYSDOT
Func. Class: RMC
Plan Ref.: 9W
May Require EIS
AQ Status: Non-Exempt
|
|
|
A295
|
1132.16 |
Recon/Cap |
1993-98 |
|
New Karner Road (NY 155), from US 20 to Watervliet Shaker Road: Corridor Improvements
Includes safety and complete streets improvements
Related Project: A336 from the 2003-08 TIP.
|
Multiple, County, 3.0 mi |
|
STP-Urb. |
7.200 |
|
|
|
.375 D |
|
6.550 C |
|
STP-Urb. |
|
|
|
|
.275 P |
|
|
|
Total |
7.200 |
  |
  |
  |
.650    |
  |
6.550    |
  |
Detailed Des |
0.375 |
  |
  |
  |
.375    |
  |
  |
  |
Construct'n |
6.550 |
  |
  |
  |
  |
  |
6.550    |
  |
Prelim. Des. |
0.275 |
  |
  |
  |
.275    |
  |
  |
  |
|
Agency: County
Func. Class: UPA
Plan Ref.: Pine
EIS Required
AQ Status: Exempt
|
|
|
A453
|
1759.22 |
Recon/Cap |
2005-10 |
|
Watervliet Shaker Road, from Karner Road to Albany Shaker Road: Corridor Improvements, Phase 3
More information is in the 2013-18 TIP project listing.
|
Colonie (T), County, 4.0 Ln-Mi |
|
STP-Flex |
  |
|
|
|
|
|
|
3.600 C |
Local |
  |
|
|
|
|
|
|
2.835 C |
Total |
  |
  |
  |
  |
  |
  |
  |
6.435    |
Construct'n |
  |
  |
  |
  |
  |
  |
  |
6.435    |
|
Agency: County
Func. Class: UPA
Plan Ref.: GEIS/Air
EIS Required
AQ Status: Non-Exempt
|
|
|
A523
|
1759.14 |
Reconst'n |
2010-15 |
|
Albany Shaker Road & Northern Boulevard: Reconstruction
Albany Shaker Road, Corporate Woods Boulevard to US 9 Overpass Bridge: New sidewalks and curbs, pedestrian facilities, crosswalks, bicycle facilities, signals, and drainage.
Northern Boulevard, US 9 Bridge to I-90 Bridge: turning lanes, raised landscaped median, shared travel lane.
|
Albany, City, 1.39 cl-mi |
|
STP-Flex |
  |
|
|
|
|
|
|
9.670 C |
STP-Flex |
|
|
|
|
|
|
|
.200 R |
STP-Flex |
|
|
|
|
|
|
|
.600 P |
STP-Flex |
|
|
|
|
|
|
|
.600 D |
Total |
  |
  |
  |
  |
  |
  |
  |
11.070    |
Construct'n |
  |
  |
  |
  |
  |
  |
  |
9.670    |
ROW Aquis'n |
  |
  |
  |
  |
  |
  |
  |
.200    |
Prelim. Des. |
  |
  |
  |
  |
  |
  |
  |
.600    |
Detailed Des |
  |
  |
  |
  |
  |
  |
  |
.600    |
|
Agency: City
Func. Class: Mult
Plan Ref.: HWY Cond
No EIS Required
AQ Status: Exempt
|
|
|
A524
|
1759.17 |
Safety |
2010-15 |
|
Albany County High Risk Rural Road Safety Program: Various Locations
Guide rail, slope flattening, advanced warning signs, fixed object removal/modification, curve delineation with chevrons, and similar low-cost safety improvements at high risk locations on county roads.
|
Multiple, County |
|
Safety |
  |
|
|
|
|
|
|
.440 C |
Safety |
|
|
|
|
|
|
|
.050 D |
Safety |
|
|
|
|
|
|
|
.050 P |
Total |
  |
  |
  |
  |
  |
  |
  |
.540    |
Construct'n |
  |
  |
  |
  |
  |
  |
  |
.440    |
Detailed Des |
  |
  |
  |
  |
  |
  |
  |
.050    |
Prelim. Des. |
  |
  |
  |
  |
  |
  |
  |
.050    |
|
Agency: County
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
Hudson Avenue from Tibbits Avenue to the Watervliet City Line: Mill & Fill
Also, improve ADA compliant crosswalks, install high visibility crosswalks, and improve cyclist safety. Also includes a new sidewalk along Lower Hudson Avenue.
This project was funded from RG138. C rolled-over.
|
Green Island, Village, 1.05 cl-mi |
|
STP-Urb. |
0.855 |
.051 D |
.855 C |
|
|
|
|
|
STP-Urb. |
|
.049 P |
|
|
|
|
|
|
Total |
0.855 |
.100    |
.855    |
  |
  |
  |
  |
  |
Detailed Des |
  |
.051    |
  |
  |
  |
  |
  |
  |
Construct'n |
0.855 |
  |
.855    |
  |
  |
  |
  |
  |
Prelim. Des. |
  |
.049    |
  |
  |
  |
  |
  |
  |
|
Agency: Village
Func. Class: Mult
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
Krumkill Road from Font Grove Road (CR 306) to the Normanskill: Cold in Place Recycling
Includes 200 ft of structural repairs
This project was funded from RG138.
|
New Scotland, Town, .85 cl-mi |
|
STP-Urb. |
  |
.316 C |
|
|
|
|
|
|
Total |
  |
.316    |
  |
  |
  |
  |
  |
  |
Construct'n |
  |
.316    |
  |
  |
  |
  |
  |
  |
|
Agency: Town
Func. Class: UMC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
A572 |
1051.77 |
BridgeMisc |
2016-21 |
|
I-787 NB Ramp over the SME to SME WB: Element Specific Repairs
BIN 109299A
|
Albany, State |
|
NHPP |
10.639 |
.450 D |
10.639 C |
|
|
|
|
|
NHPP |
|
.450 P |
|
|
|
|
|
|
Total |
10.639 |
.900    |
10.639    |
  |
  |
  |
  |
  |
Detailed Des |
  |
.450    |
  |
  |
  |
  |
  |
  |
Construct'n |
10.639 |
  |
10.639    |
  |
  |
  |
  |
  |
Prelim. Des. |
  |
.450    |
  |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: UI
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
A573
|
1528.84 |
BridgeMisc |
2016-21 |
|
I-90 Bridge over Erie Blvd.: Element Specific Repairs
BINS 1092451, 1092452
Now included in A574
|
Albany, State |
|
Total |
  |
  |
  |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: UI
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
A574
|
1528.82 |
BridgeMisc |
2016-21 |
|
I-90 Bridges over Fuller Road & Erie Blvd: Element Specific Repairs
BIN 1034479, 1092451 & 1092452
Includes A573
The NHFP funds show in the STIP as NHPP. NYSDOT will change them to NHFP (Freight) before project award.
|
Albany, State |
|
NHPP |
  |
6.133 C |
|
|
|
|
|
|
NHFP |
  |
7.527 C |
|
|
|
|
|
|
Total |
  |
13.660    |
  |
  |
  |
  |
  |
  |
Construct'n |
  |
13.660    |
  |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: UI
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
A575 |
1039.56 |
BridgeMisc |
2016-21 |
|
US 9W Bridge over I-787: Element Specific Repairs
BIN 1054460
|
Albany, State |
|
STP-Urb. |
  |
2.959 C |
|
|
|
|
|
|
Total |
  |
2.959    |
  |
  |
  |
  |
  |
  |
Construct'n |
  |
2.959    |
  |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
A576
|
1007.16 |
Br.Replace |
2016-21 |
|
NY 144 Bridge over the Hannacrois Creek: Replacement
BIN 1038070 I, D & R rolled over. I added by DOT. D, R & C deferred 1 year.
|
Coeymans, State |
|
NHPP |
3.275 |
|
|
3.100 C |
|
|
|
|
NHPP |
|
|
|
.100 D |
|
|
|
|
NHPP |
|
|
|
.005 I  |
|
|
|
|
NHPP |
|
|
|
.070 R |
|
|
|
|
Total |
3.275 |
  |
  |
3.275    |
  |
  |
  |
  |
Construct'n |
3.100 |
  |
  |
3.100    |
  |
  |
  |
  |
Detailed Des |
0.100 |
  |
  |
.100    |
  |
  |
  |
  |
ROW Incid. |
0.005 |
  |
  |
.005    |
  |
  |
  |
  |
ROW Aquis'n |
0.070 |
  |
  |
.070    |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: UMC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
A577
|
1760.31 |
Bike/Ped |
2016-21 |
|
Voorheesville Pedestrian Connectivity
Installation of sidewalks on Altamont Road (NY 156), Maple Avenue (NY 85A), and Voorheesville Avenue (CR 306)
Includes several pedestrian amenities
Jurisdiction is both State and County
|
Voorheesville, Multiple, 5400 ft |
|
STP-Urb. |
  |
.667 C |
|
|
|
|
|
|
Total |
  |
.667    |
  |
  |
  |
  |
  |
  |
Construct'n |
  |
.667    |
  |
  |
  |
  |
  |
  |
|
Agency: Village
Func. Class: Mult
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
A579
|
1760.33 |
Bike/Ped |
2016-21 |
|
Watervliet Bike Path
From the northern terminus of the Mohawk-Hudson Bike Trail northerly on Broadway to 23Road Street in Watervliet, ending at the Hudson Shores Park.
About 50% off-road & 50% cycle track.
|
Watervliet, City, 9800 ft |
|
STP-Urb. |
  |
.016 D |
|
|
|
|
|
|
STP-Urb. |
|
.025 P |
|
|
|
|
|
|
STP-Urb. |
|
1.235 C |
|
|
|
|
|
|
Total |
  |
1.276    |
  |
  |
  |
  |
  |
  |
Detailed Des |
  |
.016    |
  |
  |
  |
  |
  |
  |
Prelim. Des. |
  |
.025    |
  |
  |
  |
  |
  |
  |
Construct'n |
  |
1.235    |
  |
  |
  |
  |
  |
  |
|
Agency: City
Func. Class: Mult
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
A581
|
1760.45 |
Bike/Ped |
2016-21 |
|
West Old State Road: New Sidewalk
South side of the road, from Gardenview Terrace to Regina Drive, and from an existing walkway on Victoria Drive to Lynnwood Elementary School.
C rolled over twice I & R added by DOT
|
Guilderland, Town, 1760 ft |
|
STP-Urb. |
0.280 |
.025 D |
|
|
.227 C |
|
|
|
STP-Urb. |
|
.045 P |
|
.030 R |
|
|
|
|
STP-Urb. |
|
|
|
.023 I  |
|
|
|
|
Total |
0.280 |
.070    |
  |
.053    |
.227    |
  |
  |
  |
Detailed Des |
  |
.025    |
  |
  |
  |
  |
  |
  |
Construct'n |
0.227 |
  |
  |
  |
.227    |
  |
  |
  |
Prelim. Des. |
  |
.045    |
  |
  |
  |
  |
  |
  |
ROW Aquis'n |
0.030 |
  |
  |
.030    |
  |
  |
  |
  |
ROW Incid. |
0.023 |
  |
  |
.023    |
  |
  |
  |
  |
|
Agency: Town
Func. Class: UL
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
A583
|
1085.40 |
Safety |
2016-21 |
|
Carman Road Safety Improvements
Two roundabouts (one at Carman Road and Lydius Street and one at Carman Road and the Ramp to I-890/I-90)
The other listing for this project is S272. D rolled over.
|
Guilderland, State, .53 cl-mi |
|
Safety |
2.350 |
|
|
2.350 C |
|
|
|
|
Safe-NY |
2.260 |
|
.056 I  |
1.100 C |
|
|
|
|
Safe-NY |
|
|
|
.150 D |
|
|
|
|
Safe-NY |
|
|
.330 P |
.624 R |
|
|
|
|
Total |
4.610 |
  |
.386    |
4.224    |
  |
  |
  |
  |
Construct'n |
3.450 |
  |
  |
3.450    |
  |
  |
  |
  |
ROW Incid. |
0.056 |
  |
.056    |
  |
  |
  |
  |
  |
Detailed Des |
0.150 |
  |
  |
.150    |
  |
  |
  |
  |
Prelim. Des. |
0.330 |
  |
.330    |
  |
  |
  |
  |
  |
ROW Aquis'n |
0.624 |
  |
  |
.624    |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
A584
|
1810.74 |
Bike/Ped |
2016-21 |
|
Menands Bike/Ped Connector & NY 32 Resurface
NY 32 resurfacing from the Albany City line to the railroad bridge just north of I-787 ramp, and the ramps to I-787. Includes road diet and an upgraded traffic signal, and is a drawdown on RG136.
Construct trail connection with Bike/Ped Bridge over I-787 along NY 913T (Access Ramps to I-787) from NY 32 to Mohawk Hudson Bike Hike Trail
|
Menands, State, 300 ft |
|
NHPP |
2.950 |
|
2.950 C |
|
|
|
|
|
Flex-NY |
4.790 |
.010 I  |
.040 R |
|
|
|
|
|
Flex-NY |
|
.740 D |
4.750 C |
|
|
|
|
|
Total |
7.740 |
.750    |
7.740    |
  |
  |
  |
  |
  |
Construct'n |
7.700 |
  |
7.700    |
  |
  |
  |
  |
  |
ROW Incid. |
  |
.010    |
  |
  |
  |
  |
  |
  |
ROW Aquis'n |
0.040 |
  |
.040    |
  |
  |
  |
  |
  |
Detailed Des |
  |
.740    |
  |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
A586
|
1760.79 |
Bike/Ped |
2016-21 |
|
US 20 (Western Avenue), from Devonshire Drive to Mercy Care Lane: New Sidewalk
This is on the south side and includes curbs and intersction ramps.
These funds are capped. C rolled-over. 6K was moved from C to R and 25K was added to R (it was not used in the 16-21 TIP). Local C phase and State C phase added in 2/22.
R rolled over & C rolled over twice
|
Guilderland, Town, 2250 ft |
|
State |
0.055 |
|
|
|
.055 C |
|
|
|
CMAQ |
0.730 |
|
|
.031 R |
.699 C |
|
|
|
Local |
0.048 |
|
|
|
.048 C |
|
|
|
Total |
0.833 |
  |
  |
.031    |
.802    |
  |
  |
  |
Construct'n |
0.802 |
  |
  |
  |
.802    |
  |
  |
  |
ROW Aquis'n |
0.031 |
  |
  |
.031    |
  |
  |
  |
  |
|
Agency: Town
Func. Class: UL
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
A587
|
1760.80 |
Traff Op'n |
2016-21 |
|
US NY 9W/Feura Bush Road/Glenmont Road (NYS NY 910A): Roundabout
Includes Sidewalk Extension on Glenmont Road to Glenmont Elementary School
These funds are capped. R rolled-over. 204K was moved from C to R.
C rollder over
|
Bethlehem, Town |
|
CMAQ |
4.172 |
|
.329 R |
3.843 C |
|
|
|
|
Total |
4.172 |
  |
.329    |
3.843    |
  |
  |
  |
  |
ROW Aquis'n |
0.329 |
  |
.329    |
  |
  |
  |
  |
  |
Construct'n |
3.843 |
  |
  |
3.843    |
  |
  |
  |
  |
|
Agency: Town
Func. Class: Mult
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
A588
|
1051.82 |
Bike/Ped |
2016-21 |
|
Albany Skyway
AKA the Albany Corning Preserve Bicycle & Pedestrian Connector Ramp
Converts NB I-787 Ramp from Quay Street to Clinton Avenue to a linear park, connecting Broadway to the Corning Preserve
NYSDOT moved .150M from C to D and added .100M to C. STP-Urban funds were not obligated, so they rolled over.
|
Albany, State |
|
NHPP |
0.715 |
|
.715 C |
|
|
|
|
|
STP-Urb. |
1.685 |
|
|
1.685 C |
|
|
|
|
Demo. |
2.400 |
.750 D |
2.400 C |
|
|
|
|
|
State |
2.800 |
|
2.800 C |
|
|
|
|
|
TAP |
6.250 |
|
6.250 C |
|
|
|
|
|
Total |
13.850 |
.750    |
12.165    |
1.685    |
  |
  |
  |
  |
Construct'n |
13.850 |
  |
12.165    |
1.685    |
  |
  |
  |
  |
Detailed Des |
  |
.750    |
  |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
A589
|
1760.91 |
Bike/Ped |
2016-21 |
|
City of Albany South End Connector Lowline
Shared-Use path connecting Albany County Hudson-Helderberg Rail Trail at its trail head in the City's South End (.24 miles from South Pearl Street and Mount Hope Drive) and the Mohawk Hudson Bike Hike Trail at its trail head at the intersection of Broadway and Quay Street
This is a Recreational Trails project at 50% match. C rolled-over three times.
|
Albany, City, 1.5 mi |
|
FA 50% |
0.325 |
|
|
|
.325 C |
|
|
|
Total |
0.325 |
  |
  |
  |
.325    |
  |
  |
  |
Construct'n |
0.325 |
  |
  |
  |
.325    |
  |
  |
  |
|
Agency: City
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
A590
|
1760.92 |
Safety |
2016-21 |
|
City of Albany PSAP
Pedestrian safety improvements at: 20 uncontrolled crosswalks & 12 signalized intersections
The funding cap for this project was removed.
P rolled-over. C deferred 1 year twice. D rolled over twice. NYSDOT added 183K to C.
|
Albany, City |
|
Safe-100 |
1.669 |
|
.104 P |
|
1.416 C |
|
|
|
Safe-100 |
|
|
|
.149 D |
|
|
|
|
Total |
1.669 |
  |
.104    |
.149    |
1.416    |
  |
  |
  |
Prelim. Des. |
0.104 |
  |
.104    |
  |
  |
  |
  |
  |
Construct'n |
1.416 |
  |
  |
  |
1.416    |
  |
  |
  |
Detailed Des |
0.149 |
  |
  |
.149    |
  |
  |
  |
  |
|
Agency: City
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
A591
|
1933.61 |
Safety |
2016-21 |
|
NY 146 at SMS Rail Line MP 17.62: Grade Crossing Signal Upgrade
This is will upgrade active warning devices and surface
Toll credits will be used for match.
|
Altamont, Village |
|
Rail-100 |
  |
.210 D |
|
|
|
|
|
|
Rail-100 |
|
.385 C |
|
|
|
|
|
|
Total |
  |
.595    |
  |
  |
  |
  |
  |
  |
Detailed Des |
  |
.210    |
  |
  |
  |
  |
  |
  |
Construct'n |
  |
.385    |
  |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: RMC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
CSX Rail Crossing at Port Road: Grade Crossing Upgrade
Install new automatic flashing lights and gates.
|
Albany, City |
|
Rail |
  |
.370 D |
|
|
|
|
|
|
Rail |
|
.315 C |
|
|
|
|
|
|
Total |
  |
.685    |
  |
  |
  |
  |
  |
  |
Detailed Des |
  |
.370    |
  |
  |
  |
  |
  |
  |
Construct'n |
  |
.315    |
  |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: UMC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
Henry Johnson Boulevard, Sheridan Avenue to Livingston Avenue: Mill & Fill
ADA-compliant pedestrian amenities for all sidewalks and crosswalks. Replace 1,000 square feet of sidewalk.
The City is no longer seeking federal aid for this project. This project has been removed from the TIP.
|
Albany, City, .36 cl-mi |
|
Total |
  |
  |
  |
  |
  |
  |
  |
  |
|
Agency: City
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
Lark Street, Madison Avenue to Washington Avenue: Corridor Improvements
Pavement Rehab, ADA-compliant pedestrian amenities for all sidewalks and crosswalks. Replace 1,200 square feet of sidewalk. Sidewalk expansions, curbline extensions and additional pedestrian crossings.
|
Albany, City, .38 cl-mi |
|
STP-Urb. |
0.743 |
|
|
|
.639 C |
|
|
|
STP-Urb. |
|
|
|
|
.052 P |
|
|
|
STP-Urb. |
|
|
|
|
.052 D |
|
|
|
Local |
0.089 |
|
|
|
.043 P |
|
|
|
Local |
|
|
|
|
.046 D |
|
|
|
Total |
0.832 |
  |
  |
  |
.832    |
  |
  |
  |
Construct'n |
0.639 |
  |
  |
  |
.639    |
  |
  |
  |
Prelim. Des. |
0.095 |
  |
  |
  |
.095    |
  |
  |
  |
Detailed Des |
0.098 |
  |
  |
  |
.098    |
  |
  |
  |
|
Agency: City
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
A595
|
1051.85 |
BridgeMisc |
2019-24 |
|
Dunn Bridge WB To I-787 SB: Element Specific Repairs
BIN 109294A
C deferred one year
|
Albany, State |
|
NHPP |
12.350 |
|
.800 P |
|
|
.800 D |
10.750 C |
|
Total |
12.350 |
  |
.800    |
  |
  |
.800    |
10.750    |
  |
Prelim. Des. |
0.800 |
  |
.800    |
  |
  |
  |
  |
  |
Detailed Des |
0.800 |
  |
  |
  |
  |
.800    |
  |
  |
Construct'n |
10.750 |
  |
  |
  |
  |
  |
10.750    |
  |
|
Agency: NYSDOT
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
A596
|
1528.83 |
BridgeMisc |
2019-24 |
|
Everett Road Bridge over I-90: Element Specific Repairs
Includes widening shoulders and adding sidewalks.
BIN 1034529 NYSDOT advanced P 2 years
NYSDOT is no longer progressing Everett Road over I-90 rehabilitation work. Some element specific repairs will be made as part of multi-site bridge preservation. This project has been removed from the TIP.
|
Albany, State |
|
Total |
  |
  |
  |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: Mult
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
I-787 Exit 3B to Exit 7 (NY 378): Pavement Corrective Maintenance
NYSDOT advance C
|
Multiple, State, 4.33 cl-mi |
|
NHPP |
4.677 |
|
4.677 C |
|
|
|
|
|
SDF |
  |
.150 D |
|
|
|
|
|
|
SDF |
|
.150 P |
|
|
|
|
|
|
Total |
4.677 |
.300    |
4.677    |
  |
  |
  |
  |
  |
Construct'n |
4.677 |
  |
4.677    |
  |
  |
  |
  |
  |
Detailed Des |
  |
.150    |
  |
  |
  |
  |
  |
  |
Prelim. Des. |
  |
.150    |
  |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: UI
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
A598 |
1039.55 |
Br.Replace |
2019-24 |
|
US 9W Over CSX/CP Rail: Replacement
BIN 1007570
P was advanced one year
|
Bethlehem, State |
|
STP-Flex |
12.147 |
|
|
1.000 P |
1.000 D |
|
|
|
STP-Flex |
|
|
|
|
|
10.147 C |
|
|
Total |
12.147 |
  |
  |
1.000    |
1.000    |
10.147    |
  |
  |
Prelim. Des. |
1.000 |
  |
  |
1.000    |
  |
  |
  |
  |
Detailed Des |
1.000 |
  |
  |
  |
1.000    |
  |
  |
  |
Construct'n |
10.147 |
  |
  |
  |
  |
10.147    |
  |
  |
|
Agency: NYSDOT
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
Cohoes Avenue, Arch Street to the Cohoes City Line: Mill & Fill
Install concrete sidewalks from Arch Street to Tibbits Avenue and repair all sidewalk ramps to meet ADA standards.
|
Green Island, Village, .88 cl-mi |
|
STP-Urb. |
1.399 |
|
|
.094 P |
.094 D |
|
|
|
STP-Urb. |
|
|
|
|
1.211 C |
|
|
|
Total |
1.399 |
  |
  |
.094    |
1.305    |
  |
  |
  |
Prelim. Des. |
0.094 |
  |
  |
.094    |
  |
  |
  |
  |
Detailed Des |
0.094 |
  |
  |
  |
.094    |
  |
  |
  |
Construct'n |
1.211 |
  |
  |
  |
1.211    |
  |
  |
  |
|
Agency: Village
Func. Class: UMC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
A600 |
1045.17 |
BridgeMisc |
2019-24 |
|
NY 378 Over Hudson: Bridge Paint
BIN 1062850
The other half of this project is R343.
|
Multiple, State |
|
NHPP |
3.428 |
|
|
|
.128 P |
3.150 C |
|
|
NHPP |
|
|
|
|
|
.150 D |
|
|
Total |
3.428 |
  |
  |
  |
.128    |
3.300    |
  |
  |
Prelim. Des. |
0.128 |
  |
  |
  |
.128    |
  |
  |
  |
Construct'n |
3.150 |
  |
  |
  |
  |
3.150    |
  |
  |
Detailed Des |
0.150 |
  |
  |
  |
  |
.150    |
  |
  |
|
Agency: NYSDOT
Func. Class: UPE
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
Delaware Avenue, Elsmere Avenue to Normans Kill Bridge: Mill & Fill, Complete Streets & Road Diet Project
Funding for pavement preservation is not included below and will be paid for by the NYSDOT pavement preservation set-aside, RG136.
All phases except R deferred 1 year. Then all phases including R were deferred 1 year.
$49K moved from C to P & $28K from C to
|
Bethlehem, Town, 1.31 cl-mi |
|
TAP |
3.640 |
|
|
|
.045 R |
3.033 C |
|
|
TAP |
|
|
|
|
.369 P |
|
|
|
TAP |
|
|
|
|
.005 I  |
|
|
|
TAP |
|
|
|
|
.188 D |
|
|
|
Total |
3.640 |
  |
  |
  |
.607    |
3.033    |
  |
  |
ROW Aquis'n |
0.045 |
  |
  |
  |
.045    |
  |
  |
  |
Construct'n |
3.033 |
  |
  |
  |
  |
3.033    |
  |
  |
Prelim. Des. |
0.369 |
  |
  |
  |
.369    |
  |
  |
  |
ROW Incid. |
0.005 |
  |
  |
  |
.005    |
  |
  |
  |
Detailed Des |
0.188 |
  |
  |
  |
.188    |
  |
  |
  |
|
Agency: Town
Func. Class: UmA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
A602 |
1306.82 |
Safety |
2019-24 |
|
I-87 Exit 6 Interchange Safety Improvements
Add a merge lane on both on-Ramps to I-87 from NY 7
|
Colonie (T), State |
|
Safety |
1.824 |
|
|
.174 P |
1.650 C |
|
|
|
SDF |
0.174 |
|
|
|
.174 D |
|
|
|
Total |
1.998 |
  |
  |
.174    |
1.824    |
  |
  |
  |
Prelim. Des. |
0.174 |
  |
  |
.174    |
  |
  |
  |
  |
Construct'n |
1.650 |
  |
  |
  |
1.650    |
  |
  |
  |
Detailed Des |
0.174 |
  |
  |
  |
.174    |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: UI
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
A603
|
1761.80 |
Safety |
2019-24 |
|
Albany Shaker Road (CR 151), Wolf Road to Everett Road: Safety Improvements
Speed limit reduction, additional pedestrian improvements at select intersections & a new traffic signal at Shaker Elementary
P & D rolled over. C deferred one year
|
Colonie (T), County, 2.5 cl-mi |
|
Safety |
0.575 |
|
|
|
.044 P |
.485 C |
|
|
Safety |
|
|
|
|
.046 D |
|
|
|
Local |
0.285 |
|
|
|
|
.285 C |
|
|
Total |
0.860 |
  |
  |
  |
.090    |
.770    |
  |
  |
Prelim. Des. |
0.044 |
  |
  |
  |
.044    |
  |
  |
  |
Construct'n |
0.770 |
  |
  |
  |
  |
.770    |
  |
  |
Detailed Des |
0.046 |
  |
  |
  |
.046    |
  |
  |
  |
|
Agency: Town
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
A604
|
1085.49 |
Bike/Ped |
2019-24 |
|
Carman Road Sidewalks
Construct a 5-foot concrete sidewalk on the east side of Carman Road from Okara Drive to existing sidewalk near East Old State Road
|
Guilderland, Town, 4800 ft |
|
STP-Urb. |
0.628 |
|
|
|
.044 D |
.540 C |
|
|
STP-Urb. |
|
|
|
|
.044 P |
|
|
|
Total |
0.628 |
  |
  |
  |
.088    |
.540    |
  |
  |
Detailed Des |
0.044 |
  |
  |
  |
.044    |
  |
  |
  |
Construct'n |
0.540 |
  |
  |
  |
  |
.540    |
  |
  |
Prelim. Des. |
0.044 |
  |
  |
  |
.044    |
  |
  |
  |
|
Agency: Town
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
A605
|
1045.18 |
Prob Asses |
2019-24 |
|
NY 378 Troy Menands Bridge Study
Bridge Replacement Study: Evaluate options to relocate the bridge to a location TBD. Bike/ped accommodations will be evaluated.
The other half of this project is R344. Rolled over
|
Multiple, State |
|
NHPP-NY |
0.433 |
|
|
.433 P |
|
|
|
|
Total |
0.433 |
  |
  |
.433    |
  |
  |
  |
  |
Prelim. Des. |
0.433 |
  |
  |
.433    |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: UPE
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
A606 |
1761.17 |
BridgeMisc |
2019-24 |
|
James Street Over Eagles Nest Creek: Culvert
The construction phase includes all other costs.
|
Cohoes, State |
|
State |
0.995 |
|
.995 C |
|
|
|
|
|
Total |
0.995 |
  |
.995    |
  |
  |
  |
  |
  |
Construct'n |
0.995 |
  |
.995    |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: UL
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
NY 146 OVER NORMANSKILL, BRIDGE REPLACEMENT TOWN OF GUILDERLAND, ALBANY COUNTY, BIN 1038310. A607
This project is funded with NHPP-NY which is from statewide (not from Region One or CDTC)funds.
|
Guilderland, State |
|
NHPP-NY |
4.964 |
|
|
|
.360 D |
|
|
|
NHPP-NY |
|
|
|
|
4.604 C |
|
|
|
State |
0.360 |
|
.360 P |
|
|
|
|
|
Total |
5.324 |
  |
.360    |
  |
4.964    |
  |
  |
  |
Detailed Des |
0.360 |
  |
  |
  |
.360    |
  |
  |
  |
Construct'n |
4.604 |
  |
  |
  |
4.604    |
  |
  |
  |
Prelim. Des. |
0.360 |
  |
.360    |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class:
Plan Ref.:
No EIS Required
AQ Status: Exempt
|
|
|
|
Trail Restoration and Improvements at Edmund Niles Huyck Preserve; Rensselaerville, Albany County; OPRHP 219571
This is a Recreational Trails Project
|
Rensselaerville, Town, NA |
|
FA |
0.250 |
|
|
|
.250 C |
|
|
|
Total |
0.250 |
  |
  |
  |
.250    |
  |
  |
  |
Construct'n |
0.250 |
  |
  |
  |
.250    |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: NA
Plan Ref.:
No EIS Required
AQ Status: Exempt
|
|
|