Champlain Canal Trail
This project includes: 1) making the
width of the path consistent throughout,
2) 25 feet of retaining wall, 3)
leveling about 90 feet, 4) bike racks
and informational, educational, and
historical signage.
Federal funding is 80%, with a maximum
of $0.0144M.
This project was funded via RG41
from
the 2005-08 period.
|