Information for TIP Project Number S160

All funds are in millions of dollars.

Project Listings |  Clickable Maps |  Help

Project Description

Mohawk-Hudson Bike-Hike Trail

1) State/Washington intersection ped improvements, and 2) Class 1 trail connecting two existing class 1 trails in the City of Schenectady

Includes pedestrian actuation, refuge island, and re-striping of crosswalks at the intersection of State/Washington

The federal portion is a maximum of $0.345M. S160 was originally was funded via RG41 from the 2002-03 FFY at a cost of $0.050M with 20% local match. It was amended to include project S156 from the 2001-06 TIP, which had a 50% local match and a cost of $0.610M.




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source

2005-07

2007-08

2008-09

2009-10

2010-11

2011-12

Post '12

STP-Flex

0.431 C

0

0

0

0

0

0

Local

0.500 C

0

0

0

0

0

0



Funding Totals by Phase

Phase

Five-Year Funding

Seven-Year Funding

Construction

0

0.931

Total

0

0.931



Other Information

TIP Number: S160

Func. Class: NA

PIN: 1755.91

Length: .33 cl-mi

Project Type: Bike/Ped

Plan Ref.: NV

Jurisdiction: County

No EIS Required

Location: Schenectady

Air Quality: Exempt

Implementer: County






CDTC Home Page   |  Site Map