Information for TIP Project Number A476

All funds are in millions of dollars.
This listing includes the amendment for this project of 09/09.

Project Listings |  Clickable Maps |  Help

Project Description

Siena College Perimeter Loop Road

The perimeter loop road would begin on the Spring Street side of Siena College and pass the athletic complex and artificial turf field into the interior of the campus.

Siena College will sponsor the engineering phases and the construction sponsorship is undetermined.




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source

2005-07

2007-08

2008-09

2009-10

2010-11

2011-12

Post '12

Demo.

0.375 P

0

0

0

0

0

0

Demo.

1.250 C

0

0

0

0

0

0

Demo.

0

0

0

1.147 C

0

0

0



Funding Totals by Phase

Phase

Five-Year Funding

Seven-Year Funding

Engineering

0

0.375

Construction

1.147

2.397

Total

1.147

2.772



Other Information

TIP Number: A476

Func. Class: NA

PIN: 1757.41

Length: NA

Project Type: New Cons'n

Plan Ref.: NV

Jurisdiction: Multiple

No EIS Required

Location: Colonie (T)

Air Quality: Exempt

Implementer: Town






CDTC Home Page   |  Site Map