Information for TIP Project Number A464

All funds are in millions of dollars.

Project Listings |  Clickable Maps |  Help

Project Description

Helderberg Hudson Rail Trail: Phase 1 (Vooreesville to the Port of Albany)

This is the construction of a multi-use trail on an abandonded railroad line with guiderail, drainage and rehabilitation of four bridges.

Federal funding is 80%, with a maximum $2.368M federal share.

The I phase was added by project selection authority.




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source

2005-07

2007-08

2008-09

2009-10

2010-11

2011-12

Post '12

CMAQ

0

0.266 P

0.266 D

2.411 C

0

0

0

CMAQ

0

0

0.017 I

0

0

0

0



Funding Totals by Phase

Phase

Five-Year Funding

Seven-Year Funding

Engineering

0.532

0.532

Right-of-Way

0.017

0.017

Construction

2.411

2.411

Total

2.960

2.960



Other Information

TIP Number: A464

Func. Class: NA

PIN: 1757.32

Length: 9.7 Miles

Project Type: Bike/Ped

Plan Ref.: NV

Jurisdiction: County

No EIS Required

Location: Multiple

Air Quality: Exempt

Implementer: County






CDTC Home Page   |  Site Map