Information for TIP Project Number A242

All funds are in millions of dollars.

Project Listings |  Clickable Maps |  Help

Project Description

Slingerlands Bypass (NY 85) Phase 2

Extend NY 85 as a 4-lane road to an Intersection with NY 140 (Cherry Avenue Extension) and widen from two lanes to four between Maher Road and Blessing Road.

Includes redesign and reconstruction of New Scotland Road between Cherry Avenue Extension and the Blue Cross building to accommodate local traffic, bicycles, and pedestrians.

Phase 1 is A349 from the 1999-04 TIP, and Phase 3 is A243 .




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source

2005-07

2007-08

2008-09

2009-10

2010-11

2011-12

Post '12

STP-Flex

2.894 R

0

0

0

0

0

0

STP-Flex

16.604 C

0

0

0

0

0

0

STP-Flex

1.850 D

0

0

0

0

0

0



Funding Totals by Phase

Phase

Five-Year Funding

Seven-Year Funding

Engineering

0

1.850

Right-of-Way

0

2.894

Construction

0

16.604

Total

0

21.348



Other Information

TIP Number: A242

Func. Class: UPA

PIN: 1125.24

Length: 1.0 Ln-Mi

Project Type: New Cons'n

Plan Ref.: Beth

Jurisdiction: State

EIS Required

Location: Bethlehem

Air Quality: Non-Exempt

Implementer: NYSDOT






CDTC Home Page   |  Site Map