TIP Number |
PIN |
Truncated Description |
RG1
|
1TR6.02
|
Park and Ride Lots for Carpools Set-Aside
|
RG15
|
1806.51
|
Durable Pavement Markings Set-Aside
|
RG16
|
1B00.02
|
State Bridge Inspection Set-Aside
|
RG22
|
1B03.02
|
Local Bridge Inspection Set-Aside
|
RG23
|
Multiple
|
Traffic Signal Set-Aside
|
RG27
|
1T05.02
|
Travel Demand Management
|
RG28
|
1805.61
|
Intelligent Transportation System (ITS) Implementation Set-Aside
|
RG29
|
1755.63
|
CDTC Technical Services
|
RG31
|
1821.44
|
Corridor Management Initiative
|
RG36
|
1T07.94
|
Large Sign Set-Aside
|
RG37
|
1754.40
|
HELP Program
|
RG37A
|
1806.60
|
TMC Operating Costs
|
RG38
|
1821.62
|
NY 5 ITS Transit Component ("Best Bus")
|
RG39
|
1T07.57
|
ITS Set-Aside for Local Traffic Signals
|
RG40
|
1932.19
|
Grade Crossing Safety Improvements Set-Aside
|
RG41
|
Multiple
|
Spot Improvements for Bicycle and Pedestrian Access Set-Aside
|
RG54
|
H219
|
Epoxy Permanent Markings on NYS Thruway
|
RG76
|
1806.17
|
Safetrak Paving Set-Aside
|
RG79
|
1821.72
|
Commuter Rail Demonstration
|
RG96
|
1RTP.01
|
Recreational Trails Projects
|
RG97
|
1SB1.04
|
Mohawk Towpath Guide Book & Web Design
|
RG98
|
1SB2.04
|
Mohawk Towpath Interpretive Signage
|
T6A
|
1824.01
|
Elderly and Handicapped Vehicles
|
T6B
|
1824.37
|
STAR Buses Replacement
|
T9
|
1820.50
|
Facility Improvements
|
T11
|
1821.17
|
Passenger Facility Improvements at Various Locations
|
T14A
|
1824.03
|
Transit Operations Support
|
T14B
|
|
Transit Operations Support for Northway Commuter Service
|
T16
|
1820.55
|
Transit Support Vehicles
|
T17
|
1820.48
|
Transit Bus Replacement
|
T36
|
Multiple
|
Contingencies, Administration and Planning for CDTA Projects
|
T52
|
1824.06
|
Fixed Route Service in Saratoga County
|
T54
|
1821.63
|
New Rensselaer Amtrak Station
|
T57
|
|
Preventive Maintenance
|
T58
|
|
Bikes on Buses
|
T59
|
|
Replacement Shuttle Vehicles
|
T60
|
|
Replace/Upgrade Radio System
|
T61
|
|
Fare Collection Systems
|
T62
|
|
Information Systems
|
T64
|
|
Customer Information Systems
|
T66
|
1823.01
|
Welfare to Work
|
T67
|
|
Rensselaer Amtrak Station ITS
|
T69
|
|
New Bus Rapid Transit (BRT) Vehicles
|
T70
|
|
New Bus Rapid Transit (BRT) Stations
|
T71
|
|
Rensselaer Amtrak Station: Parking Structure Improvements
|
T77
|
|
Commuter Services Reporting to NTD
|
A196
|
1306.47
|
NY 7 Bridge over I-890: Bridge Replacement
|
A198
|
1306.50
|
NY 7 Bridge over I-87 (Exit 6): Bridge Reconstruction or Replacement
|
A199
|
1460.37
|
NY 32 Bridge over D&H Railroad at Wards Lane: Bridge Repairs
|
A229
|
1528.52
|
I-90, from Patroon Island Bridge to Exit 5A (Bridge over CSX Spur):
|
A235
|
1043.07
|
US 9 and Livingston Avenue: Intersection Improvements
|
A237
|
1753.09
|
Everett Road, from Albany Shaker Road to Exchange Street: Corridor Improvements
|
A240
|
1721.51
|
Exit 3 or 4/Airport Connector
|
A242
|
1125.24
|
Slingerlands Bypass (NY 85) Phase 2
|
A243
|
1125.19
|
Slingerlands Bypass (NY 85) Phase 3
|
A247
|
1007.14
|
NY 144, from Greene County Line to NY 143: Resurfacing
|
A248
|
1007.16
|
NY 144 Bridge over Hannacrois Creek: Bridge Deck Repairs
|
A261
|
1460.31
|
NY 32, from CR 301 to CR 308: Reconstruction
|
A262
|
1007.13
|
NY 144 Bridge over Coeymans Creek: Bridge Replacement
|
A272
|
H401
|
Thruway Interchange 22: Resurfacing
|
A286
|
B109
|
Old State Road Bridge over the Thruway (Milepost 150.81): Bridge Rehabilitation
|
A287
|
1753.26
|
North Mohawk Street, from Mohawk Street to North City Line: Pavement
|
A289
|
1753.36
|
Grade Separation of Lincoln Avenue and Amtrak Tracks
|
A290
|
1347.07
|
Selkirk Bypass
|
A295
|
1753.60
|
New Karner Road (NY 155), from US 20 to NY 5: Corridor Improvments
|
A296
|
1753.37
|
Relocation of Maxwell Road Part 1: Albany Shaker Road Intersection
|
A309
|
B103
|
Thruway Bridge over US 9W at Milepost 140.98: Bridge Rehabilitation
|
A315
|
1051.50
|
I-787, from US 9W to the South Mall Expressway: Resurfacing
|
A319
|
1528.55
|
I-90, from Thruway to Exit 5A (Bridge over CSX Spur): Rehabilitation of
|
A321
|
1125.18
|
NY 85 Near the State Office Campus: Resurfacing
|
A335
|
1011.10
|
NY 145 Bridge over Fox Creek: Bridge Replacement
|
A336
|
1754.05
|
New Karner Road Bridge over CSX: Bridge Replacement
|
A337
|
1090.11
|
NY 443 from Delaware Plaza to the DHRR: Reconstruction
|
A338
|
1754.42
|
Elm Avenue from Delaware Avenue (NY 443) to Delmar Bypass (NY 32): Reconstruction
|
A339
|
1754.43
|
Cherry Avenue (CR 52) from Kenwood Avenue (NY 140) to Delaware Avenue (NY
|
A340
|
1754.44
|
Lark Street (US 9W) from Madison Avenue to Clinton Avenue: Reconstruction
|
A341
|
1754.45
|
Central Avenue (NY 5), from City Limits to Everett Road: Resurfacing
|
A342
|
1754.46
|
Morris/Cordell Grade Crossing Consolidation and Separation
|
A343
|
1754.47
|
Airport Cargo Facility Access
|
A344
|
1754.48
|
Church Street Reconstruction
|
A345
|
1754.49
|
Elm Street Bypass
|
A348
|
1125.23
|
NY 85 over Onesquethaw Creek: Bridge Replacement
|
A351
|
1721.75
|
I-87 Bridge over Pollock Road: Bridge Replacement
|
A359
|
1039.42
|
US 9W, Greene County Line to Bethlelem Line: Reconstruction
|
A365
|
1132.12
|
NY 155, from NY 85A to NY 20: Reconstruction
|
A367
|
1804.96
|
NY 7, from US 9 to I-787: Crack and Joint Seal
|
A368
|
1804.92
|
NY 910E (New Scotland Road) over the Normanskill: Bridge Replacement
|
A370
|
1721.78
|
I-87 Bridge over Watervliet Shaker Road: Bridge Replacement
|
A371
|
1004.05
|
NY 140 (Kenwood Avenue), from NY 443 (Delaware Avenue) to the CR 52 (Cherry
|
A372
|
1754.04
|
Watervliet Shaker Road, from Karner Road to Albany Shaker Road: Phased Corridor
|
A375
|
1721.60
|
I-87, from Exit 1 to the Saratoga County Line: Reconstruction
|
A377
|
1754.67
|
Village of Voorheesville Pedestrian Circulation
|
A382
|
NA
|
Construct New Industrial Access Road
|
A392
|
1754.91
|
Relocation of Maxwell Road Part 2: Wolf Road Service Road
|
A393
|
1755.02
|
Dunbar Hollow Bridge over the Hannacrois Creek: Bridge Reconstruction or
|
A394
|
1935.49
|
NYSDOT/Amtrak Rail Initiative: Livingston Avenue Bridge Rehabilitation
|
A395
|
1935.52
|
NYSDOT/Amtrak Rail Initiative: Rensselaer to Schenectady Double Track.
|
A397
|
1006.11
|
NY 143 Bridge over Hannacrois Creek: Bridge Reconstruction or Replacement
|
A398
|
1002.10
|
NY 85A Bridge over Vly Creek: Bridge Reconstruction or Replacement
|
A399
|
1045.10
|
NY 378 Bridge over D&H: Bridge Reconstruction or Replacement
|
A400
|
1754.74
|
Old Ravena Road Bridge over CSX: Bridge Replacement or Reconstruction
|
A401
|
1755.23
|
CR 53 (Jericho Road) Bridge over Dowerskill: Bridge Reconstruction or
|
A404
|
1821.94
|
Park and Ride Lot at the End of I-787
|
A406
|
1755.61
|
Albany County Sign Management
|
A407
|
1755.62
|
City of Albany Sign Management
|
A408
|
1755.40
|
Old Ravena Road over CSX; Bridge Replacement or Reconstruction
|
A409
|
1755.72
|
City of Albany Bike Racks
|
A410
|
1755.73
|
South Bethlehem Sidewalks
|
A411
|
1755.74
|
Cohoes Bike Racks
|
A413
|
1755.76
|
Green Island Bridge Sidewalks
|
A416
|
1460.42
|
NY 32 Bridge over the Mohawk River: Bridge Replacement
|
A420
|
1756.06
|
New Scotland Road, City line to Thruway: Reconstruction
|
A421
|
|
Freeway Travel Time Study
|
A422
|
|
Voorheesville Railroad Crossing
|
A423
|
|
Carman Road Sidewalks
|
A424
|
1756.05
|
Cannon Street Reconstruction
|
A425
|
|
Mohawk-Hudson Bike-Hike Trail: Widening and Resurfacing
|
A426
|
1722.14
|
Thruway: Pavement Rehabilitation
|
A427
|
1722.15
|
Thruway Exit 23: Pavement Repairs
|
A428
|
1722.19
|
Thruway: Pavement Rehabilitation
|
A429
|
H855
|
Thruway: Pavement Rehabilitation
|
A430
|
H503
|
Thruway: Pavement Rehabilitation
|
A431
|
1755.19
|
Gifford Hollow Over Switzkill: Bridge Replacement
|
A432
|
1756.35
|
Bridge Avenue Bridge Over Mohawk River: Bridge Replacement
|
A433
|
1756.38
|
CR 53 (Old School Road) Bridge over CSX Selkirk Yard: Bridge Replacement
|
A434
|
1806.45
|
Washington Avenue over NY 85: Bridge Replacement
|
A435
|
1756.63
|
ITS Transit Signal Priority on Washington and Western Avenues
|
A436
|
1111.35
|
Western Avenue, Fuller Road to Albany City Line: Sidewalk Construction
|
A437
|
1756.32
|
Mohawk-Hudson Bike-Hike Trail: Bridge Rehabilitation
|
A438
|
1756.59
|
19th Street, from City Line to Congress Steet Bridge: Reconstruction
|
A439
|
1528.73
|
Thruway: Pavement Rehabilitation
|
A440
|
1756.61
|
Delaware Avenue, Madison Avenue to Thruway Bridge: Reconstruction
|
A441
|
NA
|
Watervliet Skaker Road & Old Wolf Road: Roundabout
|
A442
|
1721.80
|
I-87 Bridge over Albany Shaker Road: Replacement of Two Bridges
|
A443
|
1721.88
|
I-87 Bridge over Mohawk River: Replacement of Two Bridges
|
A444
|
1756.80
|
Port of Albany Security Improvements
|
A445
|
|
Central Avenue Safety Improvements
|
A446
|
|
Mohawk-Hudson Bike-Hike Trail from NY 9 to Cohoes City Line: Paving
|
A447
|
|
McKnown Road from Western Avenue to Woodscape Drive: New Sidewalk
|
A460
|
S037.00
|
Operational Subsidy for Container Shipments
|
A471
|
|
Port of Albany Rehabilitation and Operational Improvments
|
A473
|
1756.86
|
Albany Waterfront/Corning Preserve Improvements
|
R106
|
1001.28
|
NY 2 Bridge over the Poestenkill: Bridge Replacement
|
R107
|
1057.14
|
NY 150 Bridge over the Moordenerkill (BIN 1038560): Bridge Replacement
|
R108
|
1111.29
|
US 20, from Columbia County to Nassau: Resurfacing
|
R111
|
1306.53
|
NY 7, from McChesney Avenue to NY 142: Reconstruction and Hoosick Street
|
R123
|
1130.45
|
NY 22 in the Village of Hoosick Falls: Reconstruction
|
R128
|
1335.17
|
NY 40 Bridge over the Tomhannock Creek: Bridge Replacement
|
R130
|
1001.27
|
NY 2, from Petersburg to the Massachusetts State Line: Resurfacing
|
R134
|
1188.27
|
NY 67 Bridge over the Champlain Canal and Hudson River: Bridge Rehabilitation
|
R135
|
1086.23
|
NY 43 over Tsatsawassa Creek: Bridge Replacment
|
R137
|
H269
|
Thruway, Berkshire Spur from Milepost B1.6 to Milepost B6.4: Rehabilitation in
|
R155
|
1753.39
|
NY 2, from 11th Street to Pawling Avenue/Brunswick Road: Reconstruction
|
R166
|
1306.58
|
NY 7, from CR 95 (Hill Road) to the Vermont State Line: Reconstruction
|
R168
|
1097.04
|
NY 9J, from Castleton to CR 6 (Maple Hill Road): Reconstruction
|
R172
|
1753.99
|
Mechanic Street Bridge over B&M Railroad: Bridge Replacement
|
R173
|
1089.62
|
I-90 Exit 8 Connector Phase 2: ITS Demonstration.
|
R175
|
1754.51
|
ITS Signal Upgrades at Two Locations
|
R178
|
1754.52
|
Troy-Menands Bridge Pedestrian and Bicycle Access
|
R179
|
1001.18
|
NY 2 Bridge over Little Hoosick River: Bridge Replacement
|
R181
|
1086.24
|
NY 43 Bridge over Taborton Creek: Bridge Replacement
|
R183
|
1097.05
|
NY 9J, from Columbia County Line to Castleton Line: Reconstruction
|
R184
|
1130.60
|
NY 22 Bridge over the Walloomsac River: Bridge Replacement
|
R185
|
1130.63
|
NY 22 Bridge over Kinderhook Creek: Bridge Replacement
|
R186
|
1306.61
|
NY 7 Bridge over Hoosick River: Bridge Replacement
|
R187
|
1306.62
|
NY 7, from Raymertown to Tomhannock Resevoir: Reconstruction
|
R190
|
1503.09
|
NY 66 Bridge over Kinderhook Creek: Bridge Replacement
|
R191
|
1754.00
|
Cottrell Road Bridge over Walloomsac River: Bridge Replacement
|
R192
|
1754.02
|
Hansen Road Bridge over the B&M Railroad: Bridge Replacement
|
R195
|
1754.59
|
South Troy Industrial Park Road
|
R196
|
1754.68
|
CR 111 (Pitts-Johns Road) Bridge over the Hoosick River: Bridge Restoration
|
R197
|
1754.69
|
Washington Avenue, from I-90 Exit 8 to Broadway: Sidewalk Renovation
|
R198
|
1754.70
|
New Sidewalks on the East Side of Brookside Avenue and at the Intersection
|
R202
|
1755.03
|
56 Road Bridge over Poestenkill Creek: Bridge Replacement
|
R203
|
1754.99
|
CR 40 (Plank Road) Bridge over the Poestenkill Creek: Bridge Replacement
|
R204
|
1755.04
|
CR 3 (South Schodack Road) Bridge over CSX: Bridge Replacement
|
R206
|
1935.51
|
NYSDOT/Amtrak Rail Initiative: Rensselaer Amtrak Shop Construction
|
R207
|
1941.16
|
NYSDOT/Amtrak Rail Initiative: Track Improvements in Rensselaer County
|
R208
|
1755.25
|
Cropsey Road Bridge over Poestenkill Creek: Bridge Replacement or
|
R209
|
1755.24
|
Powers Road Bridge over Poestenkill Creek: Bridge Replacement or
|
R215
|
1001.26
|
NY 2, Grafton to Petersburgh: Resurfacing
|
R219
|
1755.42
|
ITS Signal Improvements in the City of Troy
|
R222
|
1806.25
|
ATIS in Rensselaer County
|
R223
|
1755.66
|
Troy Pedestrian Bicycle Trail
|
R224
|
1528.65
|
I-90, Exit 10 to Exit 11: Resurfacing
|
R225
|
1528.66
|
I-90, Exit 11 to the NYS Thruway Exit B1: Resurfacing
|
R228
|
|
Village Pedestrian/Cyclist Crosswalks
|
R229
|
1756.31
|
Sherwood Avenue in East Greenbush, US 9 & 20 to Red Mill Road: Sidewalk
|
R230
|
B130
|
Castleton Bridge on Thruway: Rehabilitation of Substructure
|
R231
|
B131
|
Castleton Bridge on Thruway: Mitigation of Footing Erosion
|
R232
|
B418
|
Castleton Bridge on Thruway: Steel Repairs on Approach Spans
|
R233
|
B430
|
Castleton Bridge on Thruway: Rehabilitate Underbridge Access Tram
|
R234
|
B136
|
Interchange B1 over Thruway: Bridge Replacements
|
R235
|
1001.31
|
NY 2 over Dayfoot Brook: Bridge Replacement
|
R236
|
1036.01
|
NY 351 over Poestenkill: Bridge Replacement
|
R237
|
1036.02
|
NY 351 over Quakenkill: Bridge Replacement
|
R238
|
1043.34
|
NY 9 over NY 9J and NY 9 over AMTRAK & CSX: Bridge Replacement
|
R239
|
1188.33
|
NY 67 Bridge over Hoosick River: Bridge Replacement
|
R240
|
1755.20
|
Brookside Avenue over Wynantskill: Bridge Replacement
|
R241
|
1755.31
|
CR 49 (East Union) Over Unnamed Creek: Bridge Replacement
|
R242
|
1756.37
|
Spring Avenue Over Poestenkill: Bridge Replacement
|
R243
|
1756.42
|
NY 43 over East Street and Broadway Over AMTRAK Service Road: Bridge
|
R244
|
1756.70
|
ITS Signal Improvements in the City of Troy Phase 2
|
R245
|
1756.62
|
NY 2, from 5th Avenue to 11th Street: Reconstruction
|
R246
|
1089.64
|
NY 4 over the Hudson River: Bridge Replacement
|
R247
|
1722.18
|
Berkshire Spur Resurfacing
|
R248
|
|
9th Street Gateway Streetscape
|
R249
|
|
First Alley Connector Sidewalk
|
R250
|
|
NY 151: Flashing Beacons
|
R251
|
|
Scott Avenue (NY 150) from Prins Way to Ransom Avenue: Sidewalk Rehabilitation
|
SA48
|
1188.21
|
NY 67 Bridge over I-87 Exit 12: Bridge Reconstruction
|
SA57
|
1460.33
|
NY 32 Bridge over Barge Canal: Bridge Rehabilitation
|
SA73
|
1753.31
|
CR 52 Bridge over the Glowgee Creek: Bridge Replacement
|
SA84
|
1089.54
|
US 4 Bridge over the D&H Railroad: Bridge Reconstruction
|
SA88
|
1096.18
|
NY 50, North of Saratoga Springs: Reconstruction
|
SA101
|
1753.43
|
Ushers Road and Vischer Ferry Road
|
SA104
|
1753.63
|
Batchellerville Bridge (CR 98): Alternatives Analysis and Preliminary
|
SA108
|
1085.27
|
Balltown Road, from River Road to Glenridge Road: Corridor Improvements
|
SA109
|
1804.42
|
Glenridge Road, from Maple Avenue to NY 146: Reconstruction
|
SA122
|
1721.56
|
I-87 Bridge over the D&H Railroad North of Saratoga Springs: Bridge Replacement
|
SA131
|
1754.53
|
ITS Signal Upgrades at 21 Intersections in the City of Saratoga Springs
|
SA132
|
1754.54
|
CR 7 (South Shore Road) over Batcheller Creek: Bridge Replacement
|
SA133
|
1754.55
|
South Broadway/Ballston Avenue Intersection Improvements
|
SA134
|
1821.66
|
Replacement Buses for Upstate Transit Northway Service
|
SA136
|
1754.57
|
Saratoga Springs Downtown Pedestrian Improvements
|
SA142
|
1089.58
|
NY 4, in the Village of Schuylerville: Reconstruction
|
SA145
|
1188.30
|
NY 67 Bridge over Gordon Creek: Bridge Replacement
|
SA147
|
1721.74
|
Kinns Road Bridge over I-87: Bridge Replacement
|
SA148
|
1754.01
|
CR 49 Bridge over Kaydeross Creek: Bridge Replacement
|
SA149
|
1804.93
|
Fulton Street Bridge over Old Champlain Canal: Bridge Replacement
|
SA152
|
1116.43
|
NY 9N Bridge over the Hudson River: Bridge Replacement
|
SA153
|
1236.14
|
NY 29, Jockey Street to Armer Road: Reconstruction.
|
SA154
|
1236.19
|
NY 29, Armer Road to Creek Road: Reconstruction.
|
SA155
|
1754.61
|
CR 59 (Middle Line Road) Bridge over the Kayaderosseras: Bridge Replacement
|
SA158
|
1754.71
|
North Bridge at Peebles Island State Park
|
SA160
|
NA
|
Pedestrian Improvements on Broadway in Saratoga Springs
|
SA161
|
NA
|
Clifton Park Center Road: Resurfacing
|
SA163
|
1821.70
|
Saratoga Springs Train Station
|
SA164
|
1821.71
|
Scenic Train: Corinth to North Creek
|
SA165
|
NA
|
Rehabilitation of Lock C-5 in Northumberland
|
SA170
|
1188.32
|
NY 67 Bridge over Unnamed Creek: Bridge Replacement or Rehabilitation
|
SA174
|
1236.18
|
NY 29, Creek Road to Middle Line Road: Resurfacing
|
SA176
|
1755.16
|
Ralph Street Bridge over Kayderosseras Creek
|
SA177
|
|
Town of Malta Trail Improvements
|
SA178
|
|
Arongen-Shenendahowa Public Library Multi-Use Path
|
SA180
|
1755.81
|
Crosswalk and Four Pedestrian Signs, Town of Stillwater
|
SA181
|
1755.93
|
Spring Run Trail Construction
|
SA182
|
|
Ruhle Road Pedestrian Bridge Restoration
|
SA185
|
1188.31
|
NY 67 from I-87 to NY 50: Resurfacing
|
SA186
|
1755.89
|
Copeland Covered Bridge
|
SA187
|
|
CDTA's Rural Transit Service in Saratoga
|
SA188
|
|
City of Mechanicville Rural Transit Service
|
SA190
|
|
Green Street Connector Sidewalk Reconstruction, Village of Schuylerville
|
SA191
|
|
Hadley Sidewalk Improvement
|
SA192
|
|
Pedestrian Improvements, Town of Malta
|
SA193
|
|
Town of Milton Property Streetscape Improvements
|
SA194
|
1755.99
|
Hadley Train Station
|
SA195
|
|
Zim Smith Mid-County Trail
|
SA196
|
|
Historic Hadley Bow Bridge: Preservation
|
SA197
|
1806.85
|
Saratoga National Historic Park: Slide Repair
|
SA198
|
1247.08
|
NY 9P over Saratoga Lake Outlet: Bridge Replacement
|
SA199
|
1756.23
|
Bryant's Bridge Road Bridge over Fish Creek: Bridge Replacement
|
SA200
|
1754.56
|
Canal Road Bike Path
|
SA201
|
1756.60
|
Ballston Avenue, Union Street to Hamilton Street: Safety Improvements
|
SA202
|
1941.18
|
Saratoga Springs to Corinth: Track Purchase and Rehabilitation
|
SA203
|
1941.17
|
Saratoga Station Power Switches
|
SA204
|
1SB3.01
|
Lakes to Locks Passage, All-American Road
|
SA205
|
1089.64
|
NY 4 over the Hudson River: Bridge Replacement
|
SA206
|
1721.88
|
I-87 Bridge over Mohawk River: Replacement of Two Bridges
|
SA207
|
1756.66
|
Construction, Restoration & Rehabilitation of Roads and
|
SA208
|
1756.55
|
Batchellerville Bridge (CR 98): Temporary Repairs
|
SA209
|
1722.12
|
I-87, Exit 15 to Hudson River: Resurfacing
|
SA210
|
1722.17
|
Northway Access Feasibility Study
|
SA211
|
|
Rehabilitation of Lock E-6
|
SA212
|
1756.79
|
Hudson Crossing Multi-Use Path
|
SA213
|
|
South Street from Hudson View Cemetary to Talmadge Park: Sidewalk Replacement
|
S79
|
1003.43
|
NY 103 Bridge over Erie Canal: Bridge Rehabilitation
|
S93
|
1306.51
|
NY 7 at the Five Corners: Intersection Improvements
|
S94
|
1306.52
|
NY 7 and NY 146: Intersection Improvements
|
S96
|
1085.27
|
Balltown Road, from River Road to Glenridge Road: Corridor Improvements
|
S97
|
1096.19
|
NY 50, Freeman's Bridge Road to Glenridge Road: Corridor Improvements
|
S101
|
1020.08
|
NY 158, from Curry Road to Railroad: Resurfacing
|
S120
|
1804.42
|
Glenridge Road, from Maple Avenue to NY 146: Reconstruction
|
S121
|
1753.65
|
State Street (NY 5), from Furman Street to Fehr Avenue: Resurfacing
|
S124
|
1525.29
|
I-890, from Campbell Road to Exit 26: Reconstruction
|
S126
|
1096.21
|
NY 50 Bridge over the Indiankill: Bridge Replacement
|
S129
|
1021.29
|
NY 159 Bridge over CSX: Bridge Replacement
|
S131
|
B112
|
Thruway Bridge over CSX (Milepost 158.98)
|
S136
|
1034.18
|
NY 5, from NY 147 to Washington Avenue: Resurfacing
|
S140
|
1754.63
|
Mohawk-Hudson Bike-Hike Trail: Corridor Improvements
|
S141
|
1754.65
|
Rail Corridor Bridge Improvements
|
S142
|
1754.64
|
Kings Road Sidewalks
|
S143
|
1754.66
|
Bicycle and Pedestrian Path Near Lock 8
|
S144
|
1754.58
|
State Street Streetscape
|
S146
|
NA
|
State Street Transportation Corridor Streetscape
|
S149
|
1755.06
|
Cole Road Bridge over the Normanskill: Bridge Reconstruction
|
S150
|
1935.52
|
NYSDOT/Amtrak Rail Initiative: Rensselaer to Schenectady Double Track
|
S153
|
1755.78
|
Bike Trail in Niskayuna, Repairs
|
S154
|
|
Mohawk-Hudson Bike-Hike Trail
|
S155
|
1755.79
|
Scotia Sidewalks
|
S157
|
1756.01
|
Maple Avenue Realignment
|
S158
|
1357.12
|
I-88 Resurfacing Part 2: NYS Thruway Exit 25A to Weaver Road
|
S160
|
1756.16
|
Mohawk-Hudson Bike-Hike Trail
|
S161
|
|
Glenville & Scotia Sidewalks
|
S162
|
H503
|
Thruway: Pavement Rehabilitation
|
S163
|
1528.75
|
Thruway: Pavement Rehabilitation
|
S164
|
H76
|
Thruway: Drainage Improvements
|
S165
|
R33
|
Mohawk-Hudson Bike-Hike Trail: Rotterdam Junction to Amsterdam
|
S166
|
1306.66
|
NY 7 over Normanskill: Bridge Replacement
|
S167
|
1755.33
|
Oak Street over CSX: Bridge Replacement
|
S168
|
1805.68
|
Ferry Road over Backchannel Mohawk: Bridge Replacement
|
S169
|
1528.74
|
Thruway: Pavement Rehabilitation
|
S170
|
1941.19
|
Western Gateway Transportation Center
|
S171
|
|
Rehabilitation at Lock E-8
|
S172
|
1306.72
|
NY 7, I-890 to St. David’s Lane:
|