List of 2003-08 TIP Projects in TIP Order


TIP Number

PIN

Truncated Description

RG1

1TR6.02

Park and Ride Lots for Carpools Set-Aside
RG15

1806.51

Durable Pavement Markings Set-Aside
RG16

1B00.02

State Bridge Inspection Set-Aside
RG22

1B03.02

Local Bridge Inspection Set-Aside
RG23

Multiple

Traffic Signal Set-Aside
RG27

1T05.02

Travel Demand Management
RG28

1805.61

Intelligent Transportation System (ITS) Implementation Set-Aside
RG29

1755.63

CDTC Technical Services
RG31

1821.44

Corridor Management Initiative
RG36

1T07.94

Large Sign Set-Aside
RG37

1754.40

HELP Program
RG37A

1806.60

TMC Operating Costs
RG38

1821.62

NY 5 ITS Transit Component ("Best Bus")
RG39

1T07.57

ITS Set-Aside for Local Traffic Signals
RG40

1932.19

Grade Crossing Safety Improvements Set-Aside
RG41

Multiple

Spot Improvements for Bicycle and Pedestrian Access Set-Aside
RG54

H219

Epoxy Permanent Markings on NYS Thruway
RG76

1806.17

Safetrak Paving Set-Aside
RG79

1821.72

Commuter Rail Demonstration
RG96

1RTP.01

Recreational Trails Projects
RG97

1SB1.04

Mohawk Towpath Guide Book & Web Design
RG98

1SB2.04

Mohawk Towpath Interpretive Signage
T6A

1824.01

Elderly and Handicapped Vehicles
T6B

1824.37

STAR Buses Replacement
T9

1820.50

Facility Improvements
T11

1821.17

Passenger Facility Improvements at Various Locations
T14A

1824.03

Transit Operations Support
T14B

Transit Operations Support for Northway Commuter Service
T16

1820.55

Transit Support Vehicles
T17

1820.48

Transit Bus Replacement
T36

Multiple

Contingencies, Administration and Planning for CDTA Projects
T52

1824.06

Fixed Route Service in Saratoga County
T54

1821.63

New Rensselaer Amtrak Station
T57

Preventive Maintenance
T58

Bikes on Buses
T59

Replacement Shuttle Vehicles
T60

Replace/Upgrade Radio System
T61

Fare Collection Systems
T62

Information Systems
T64

Customer Information Systems
T66

1823.01

Welfare to Work
T67

Rensselaer Amtrak Station ITS
T69

New Bus Rapid Transit (BRT) Vehicles
T70

New Bus Rapid Transit (BRT) Stations
T71

Rensselaer Amtrak Station: Parking Structure Improvements
T77

Commuter Services Reporting to NTD
A196

1306.47

NY 7 Bridge over I-890: Bridge Replacement
A198

1306.50

NY 7 Bridge over I-87 (Exit 6): Bridge Reconstruction or Replacement
A199

1460.37

NY 32 Bridge over D&H Railroad at Wards Lane: Bridge Repairs
A229

1528.52

I-90, from Patroon Island Bridge to Exit 5A (Bridge over CSX Spur):
A235

1043.07

US 9 and Livingston Avenue: Intersection Improvements
A237

1753.09

Everett Road, from Albany Shaker Road to Exchange Street: Corridor Improvements
A240

1721.51

Exit 3 or 4/Airport Connector
A242

1125.24

Slingerlands Bypass (NY 85) Phase 2
A243

1125.19

Slingerlands Bypass (NY 85) Phase 3
A247

1007.14

NY 144, from Greene County Line to NY 143: Resurfacing
A248

1007.16

NY 144 Bridge over Hannacrois Creek: Bridge Deck Repairs
A261

1460.31

NY 32, from CR 301 to CR 308: Reconstruction
A262

1007.13

NY 144 Bridge over Coeymans Creek: Bridge Replacement
A272

H401

Thruway Interchange 22: Resurfacing
A286

B109

Old State Road Bridge over the Thruway (Milepost 150.81): Bridge Rehabilitation
A287

1753.26

North Mohawk Street, from Mohawk Street to North City Line: Pavement
A289

1753.36

Grade Separation of Lincoln Avenue and Amtrak Tracks
A290

1347.07

Selkirk Bypass
A295

1753.60

New Karner Road (NY 155), from US 20 to NY 5: Corridor Improvments
A296

1753.37

Relocation of Maxwell Road Part 1: Albany Shaker Road Intersection
A309

B103

Thruway Bridge over US 9W at Milepost 140.98: Bridge Rehabilitation
A315

1051.50

I-787, from US 9W to the South Mall Expressway: Resurfacing
A319

1528.55

I-90, from Thruway to Exit 5A (Bridge over CSX Spur): Rehabilitation of
A321

1125.18

NY 85 Near the State Office Campus: Resurfacing
A335

1011.10

NY 145 Bridge over Fox Creek: Bridge Replacement
A336

1754.05

New Karner Road Bridge over CSX: Bridge Replacement
A337

1090.11

NY 443 from Delaware Plaza to the DHRR: Reconstruction
A338

1754.42

Elm Avenue from Delaware Avenue (NY 443) to Delmar Bypass (NY 32): Reconstruction
A339

1754.43

Cherry Avenue (CR 52) from Kenwood Avenue (NY 140) to Delaware Avenue (NY
A340

1754.44

Lark Street (US 9W) from Madison Avenue to Clinton Avenue: Reconstruction
A341

1754.45

Central Avenue (NY 5), from City Limits to Everett Road: Resurfacing
A342

1754.46

Morris/Cordell Grade Crossing Consolidation and Separation
A343

1754.47

Airport Cargo Facility Access
A344

1754.48

Church Street Reconstruction
A345

1754.49

Elm Street Bypass
A348

1125.23

NY 85 over Onesquethaw Creek: Bridge Replacement
A351

1721.75

I-87 Bridge over Pollock Road: Bridge Replacement
A359

1039.42

US 9W, Greene County Line to Bethlelem Line: Reconstruction
A365

1132.12

NY 155, from NY 85A to NY 20: Reconstruction
A367

1804.96

NY 7, from US 9 to I-787: Crack and Joint Seal
A368

1804.92

NY 910E (New Scotland Road) over the Normanskill: Bridge Replacement
A370

1721.78

I-87 Bridge over Watervliet Shaker Road: Bridge Replacement
A371

1004.05

NY 140 (Kenwood Avenue), from NY 443 (Delaware Avenue) to the CR 52 (Cherry
A372

1754.04

Watervliet Shaker Road, from Karner Road to Albany Shaker Road: Phased Corridor
A375

1721.60

I-87, from Exit 1 to the Saratoga County Line: Reconstruction
A377

1754.67

Village of Voorheesville Pedestrian Circulation
A382

NA

Construct New Industrial Access Road
A392

1754.91

Relocation of Maxwell Road Part 2: Wolf Road Service Road
A393

1755.02

Dunbar Hollow Bridge over the Hannacrois Creek: Bridge Reconstruction or
A394

1935.49

NYSDOT/Amtrak Rail Initiative: Livingston Avenue Bridge Rehabilitation
A395

1935.52

NYSDOT/Amtrak Rail Initiative: Rensselaer to Schenectady Double Track.
A397

1006.11

NY 143 Bridge over Hannacrois Creek: Bridge Reconstruction or Replacement
A398

1002.10

NY 85A Bridge over Vly Creek: Bridge Reconstruction or Replacement
A399

1045.10

NY 378 Bridge over D&H: Bridge Reconstruction or Replacement
A400

1754.74

Old Ravena Road Bridge over CSX: Bridge Replacement or Reconstruction
A401

1755.23

CR 53 (Jericho Road) Bridge over Dowerskill: Bridge Reconstruction or
A404

1821.94

Park and Ride Lot at the End of I-787
A406

1755.61

Albany County Sign Management
A407

1755.62

City of Albany Sign Management
A408

1755.40

Old Ravena Road over CSX; Bridge Replacement or Reconstruction
A409

1755.72

City of Albany Bike Racks
A410

1755.73

South Bethlehem Sidewalks
A411

1755.74

Cohoes Bike Racks
A413

1755.76

Green Island Bridge Sidewalks
A416

1460.42

NY 32 Bridge over the Mohawk River: Bridge Replacement
A420

1756.06

New Scotland Road, City line to Thruway: Reconstruction
A421

Freeway Travel Time Study
A422

Voorheesville Railroad Crossing
A423

Carman Road Sidewalks
A424

1756.05

Cannon Street Reconstruction
A425

Mohawk-Hudson Bike-Hike Trail: Widening and Resurfacing
A426

1722.14

Thruway: Pavement Rehabilitation
A427

1722.15

Thruway Exit 23: Pavement Repairs
A428

1722.19

Thruway: Pavement Rehabilitation
A429

H855

Thruway: Pavement Rehabilitation
A430

H503

Thruway: Pavement Rehabilitation
A431

1755.19

Gifford Hollow Over Switzkill: Bridge Replacement
A432

1756.35

Bridge Avenue Bridge Over Mohawk River: Bridge Replacement
A433

1756.38

CR 53 (Old School Road) Bridge over CSX Selkirk Yard: Bridge Replacement
A434

1806.45

Washington Avenue over NY 85: Bridge Replacement
A435

1756.63

ITS Transit Signal Priority on Washington and Western Avenues
A436

1111.35

Western Avenue, Fuller Road to Albany City Line: Sidewalk Construction
A437

1756.32

Mohawk-Hudson Bike-Hike Trail: Bridge Rehabilitation
A438

1756.59

19th Street, from City Line to Congress Steet Bridge: Reconstruction
A439

1528.73

Thruway: Pavement Rehabilitation
A440

1756.61

Delaware Avenue, Madison Avenue to Thruway Bridge: Reconstruction
A441

NA

Watervliet Skaker Road & Old Wolf Road: Roundabout
A442

1721.80

I-87 Bridge over Albany Shaker Road: Replacement of Two Bridges
A443

1721.88

I-87 Bridge over Mohawk River: Replacement of Two Bridges
A444

1756.80

Port of Albany Security Improvements
A445

Central Avenue Safety Improvements
A446

Mohawk-Hudson Bike-Hike Trail from NY 9 to Cohoes City Line: Paving
A447

McKnown Road from Western Avenue to Woodscape Drive: New Sidewalk
A460

S037.00

Operational Subsidy for Container Shipments
A471

Port of Albany Rehabilitation and Operational Improvments
A473

1756.86

Albany Waterfront/Corning Preserve Improvements
R106

1001.28

NY 2 Bridge over the Poestenkill: Bridge Replacement
R107

1057.14

NY 150 Bridge over the Moordenerkill (BIN 1038560): Bridge Replacement
R108

1111.29

US 20, from Columbia County to Nassau: Resurfacing
R111

1306.53

NY 7, from McChesney Avenue to NY 142: Reconstruction and Hoosick Street
R123

1130.45

NY 22 in the Village of Hoosick Falls: Reconstruction
R128

1335.17

NY 40 Bridge over the Tomhannock Creek: Bridge Replacement
R130

1001.27

NY 2, from Petersburg to the Massachusetts State Line: Resurfacing
R134

1188.27

NY 67 Bridge over the Champlain Canal and Hudson River: Bridge Rehabilitation
R135

1086.23

NY 43 over Tsatsawassa Creek: Bridge Replacment
R137

H269

Thruway, Berkshire Spur from Milepost B1.6 to Milepost B6.4: Rehabilitation in
R155

1753.39

NY 2, from 11th Street to Pawling Avenue/Brunswick Road: Reconstruction
R166

1306.58

NY 7, from CR 95 (Hill Road) to the Vermont State Line: Reconstruction
R168

1097.04

NY 9J, from Castleton to CR 6 (Maple Hill Road): Reconstruction
R172

1753.99

Mechanic Street Bridge over B&M Railroad: Bridge Replacement
R173

1089.62

I-90 Exit 8 Connector Phase 2: ITS Demonstration.
R175

1754.51

ITS Signal Upgrades at Two Locations
R178

1754.52

Troy-Menands Bridge Pedestrian and Bicycle Access
R179

1001.18

NY 2 Bridge over Little Hoosick River: Bridge Replacement
R181

1086.24

NY 43 Bridge over Taborton Creek: Bridge Replacement
R183

1097.05

NY 9J, from Columbia County Line to Castleton Line: Reconstruction
R184

1130.60

NY 22 Bridge over the Walloomsac River: Bridge Replacement
R185

1130.63

NY 22 Bridge over Kinderhook Creek: Bridge Replacement
R186

1306.61

NY 7 Bridge over Hoosick River: Bridge Replacement
R187

1306.62

NY 7, from Raymertown to Tomhannock Resevoir: Reconstruction
R190

1503.09

NY 66 Bridge over Kinderhook Creek: Bridge Replacement
R191

1754.00

Cottrell Road Bridge over Walloomsac River: Bridge Replacement
R192

1754.02

Hansen Road Bridge over the B&M Railroad: Bridge Replacement
R195

1754.59

South Troy Industrial Park Road
R196

1754.68

CR 111 (Pitts-Johns Road) Bridge over the Hoosick River: Bridge Restoration
R197

1754.69

Washington Avenue, from I-90 Exit 8 to Broadway: Sidewalk Renovation
R198

1754.70

New Sidewalks on the East Side of Brookside Avenue and at the Intersection
R202

1755.03

56 Road Bridge over Poestenkill Creek: Bridge Replacement
R203

1754.99

CR 40 (Plank Road) Bridge over the Poestenkill Creek: Bridge Replacement
R204

1755.04

CR 3 (South Schodack Road) Bridge over CSX: Bridge Replacement
R206

1935.51

NYSDOT/Amtrak Rail Initiative: Rensselaer Amtrak Shop Construction
R207

1941.16

NYSDOT/Amtrak Rail Initiative: Track Improvements in Rensselaer County
R208

1755.25

Cropsey Road Bridge over Poestenkill Creek: Bridge Replacement or
R209

1755.24

Powers Road Bridge over Poestenkill Creek: Bridge Replacement or
R215

1001.26

NY 2, Grafton to Petersburgh: Resurfacing
R219

1755.42

ITS Signal Improvements in the City of Troy
R222

1806.25

ATIS in Rensselaer County
R223

1755.66

Troy Pedestrian Bicycle Trail
R224

1528.65

I-90, Exit 10 to Exit 11: Resurfacing
R225

1528.66

I-90, Exit 11 to the NYS Thruway Exit B1: Resurfacing
R228

Village Pedestrian/Cyclist Crosswalks
R229

1756.31

Sherwood Avenue in East Greenbush, US 9 & 20 to Red Mill Road: Sidewalk
R230

B130

Castleton Bridge on Thruway: Rehabilitation of Substructure
R231

B131

Castleton Bridge on Thruway: Mitigation of Footing Erosion
R232

B418

Castleton Bridge on Thruway: Steel Repairs on Approach Spans
R233

B430

Castleton Bridge on Thruway: Rehabilitate Underbridge Access Tram
R234

B136

Interchange B1 over Thruway: Bridge Replacements
R235

1001.31

NY 2 over Dayfoot Brook: Bridge Replacement
R236

1036.01

NY 351 over Poestenkill: Bridge Replacement
R237

1036.02

NY 351 over Quakenkill: Bridge Replacement
R238

1043.34

NY 9 over NY 9J and NY 9 over AMTRAK & CSX: Bridge Replacement
R239

1188.33

NY 67 Bridge over Hoosick River: Bridge Replacement
R240

1755.20

Brookside Avenue over Wynantskill: Bridge Replacement
R241

1755.31

CR 49 (East Union) Over Unnamed Creek: Bridge Replacement
R242

1756.37

Spring Avenue Over Poestenkill: Bridge Replacement
R243

1756.42

NY 43 over East Street and Broadway Over AMTRAK Service Road: Bridge
R244

1756.70

ITS Signal Improvements in the City of Troy Phase 2
R245

1756.62

NY 2, from 5th Avenue to 11th Street: Reconstruction
R246

1089.64

NY 4 over the Hudson River: Bridge Replacement
R247

1722.18

Berkshire Spur Resurfacing
R248

9th Street Gateway Streetscape
R249

First Alley Connector Sidewalk
R250

NY 151: Flashing Beacons
R251

Scott Avenue (NY 150) from Prins Way to Ransom Avenue: Sidewalk Rehabilitation
SA48

1188.21

NY 67 Bridge over I-87 Exit 12: Bridge Reconstruction
SA57

1460.33

NY 32 Bridge over Barge Canal: Bridge Rehabilitation
SA73

1753.31

CR 52 Bridge over the Glowgee Creek: Bridge Replacement
SA84

1089.54

US 4 Bridge over the D&H Railroad: Bridge Reconstruction
SA88

1096.18

NY 50, North of Saratoga Springs: Reconstruction
SA101

1753.43

Ushers Road and Vischer Ferry Road
SA104

1753.63

Batchellerville Bridge (CR 98): Alternatives Analysis and Preliminary
SA108

1085.27

Balltown Road, from River Road to Glenridge Road: Corridor Improvements
SA109

1804.42

Glenridge Road, from Maple Avenue to NY 146: Reconstruction
SA122

1721.56

I-87 Bridge over the D&H Railroad North of Saratoga Springs: Bridge Replacement
SA131

1754.53

ITS Signal Upgrades at 21 Intersections in the City of Saratoga Springs
SA132

1754.54

CR 7 (South Shore Road) over Batcheller Creek: Bridge Replacement
SA133

1754.55

South Broadway/Ballston Avenue Intersection Improvements
SA134

1821.66

Replacement Buses for Upstate Transit Northway Service
SA136

1754.57

Saratoga Springs Downtown Pedestrian Improvements
SA142

1089.58

NY 4, in the Village of Schuylerville: Reconstruction
SA145

1188.30

NY 67 Bridge over Gordon Creek: Bridge Replacement
SA147

1721.74

Kinns Road Bridge over I-87: Bridge Replacement
SA148

1754.01

CR 49 Bridge over Kaydeross Creek: Bridge Replacement
SA149

1804.93

Fulton Street Bridge over Old Champlain Canal: Bridge Replacement
SA152

1116.43

NY 9N Bridge over the Hudson River: Bridge Replacement
SA153

1236.14

NY 29, Jockey Street to Armer Road: Reconstruction.
SA154

1236.19

NY 29, Armer Road to Creek Road: Reconstruction.
SA155

1754.61

CR 59 (Middle Line Road) Bridge over the Kayaderosseras: Bridge Replacement
SA158

1754.71

North Bridge at Peebles Island State Park
SA160

NA

Pedestrian Improvements on Broadway in Saratoga Springs
SA161

NA

Clifton Park Center Road: Resurfacing
SA163

1821.70

Saratoga Springs Train Station
SA164

1821.71

Scenic Train: Corinth to North Creek
SA165

NA

Rehabilitation of Lock C-5 in Northumberland
SA170

1188.32

NY 67 Bridge over Unnamed Creek: Bridge Replacement or Rehabilitation
SA174

1236.18

NY 29, Creek Road to Middle Line Road: Resurfacing
SA176

1755.16

Ralph Street Bridge over Kayderosseras Creek
SA177

Town of Malta Trail Improvements
SA178

Arongen-Shenendahowa Public Library Multi-Use Path
SA180

1755.81

Crosswalk and Four Pedestrian Signs, Town of Stillwater
SA181

1755.93

Spring Run Trail Construction
SA182

Ruhle Road Pedestrian Bridge Restoration
SA185

1188.31

NY 67 from I-87 to NY 50: Resurfacing
SA186

1755.89

Copeland Covered Bridge
SA187

CDTA's Rural Transit Service in Saratoga
SA188

City of Mechanicville Rural Transit Service
SA190

Green Street Connector Sidewalk Reconstruction, Village of Schuylerville
SA191

Hadley Sidewalk Improvement
SA192

Pedestrian Improvements, Town of Malta
SA193

Town of Milton Property Streetscape Improvements
SA194

1755.99

Hadley Train Station
SA195

Zim Smith Mid-County Trail
SA196

Historic Hadley Bow Bridge: Preservation
SA197

1806.85

Saratoga National Historic Park: Slide Repair
SA198

1247.08

NY 9P over Saratoga Lake Outlet: Bridge Replacement
SA199

1756.23

Bryant's Bridge Road Bridge over Fish Creek: Bridge Replacement
SA200

1754.56

Canal Road Bike Path
SA201

1756.60

Ballston Avenue, Union Street to Hamilton Street: Safety Improvements
SA202

1941.18

Saratoga Springs to Corinth: Track Purchase and Rehabilitation
SA203

1941.17

Saratoga Station Power Switches
SA204

1SB3.01

Lakes to Locks Passage, All-American Road
SA205

1089.64

NY 4 over the Hudson River: Bridge Replacement
SA206

1721.88

I-87 Bridge over Mohawk River: Replacement of Two Bridges
SA207

1756.66

Construction, Restoration & Rehabilitation of Roads and
SA208

1756.55

Batchellerville Bridge (CR 98): Temporary Repairs
SA209

1722.12

I-87, Exit 15 to Hudson River: Resurfacing
SA210

1722.17

Northway Access Feasibility Study
SA211

Rehabilitation of Lock E-6
SA212

1756.79

Hudson Crossing Multi-Use Path
SA213

South Street from Hudson View Cemetary to Talmadge Park: Sidewalk Replacement
S79

1003.43

NY 103 Bridge over Erie Canal: Bridge Rehabilitation
S93

1306.51

NY 7 at the Five Corners: Intersection Improvements
S94

1306.52

NY 7 and NY 146: Intersection Improvements
S96

1085.27

Balltown Road, from River Road to Glenridge Road: Corridor Improvements
S97

1096.19

NY 50, Freeman's Bridge Road to Glenridge Road: Corridor Improvements
S101

1020.08

NY 158, from Curry Road to Railroad: Resurfacing
S120

1804.42

Glenridge Road, from Maple Avenue to NY 146: Reconstruction
S121

1753.65

State Street (NY 5), from Furman Street to Fehr Avenue: Resurfacing
S124

1525.29

I-890, from Campbell Road to Exit 26: Reconstruction
S126

1096.21

NY 50 Bridge over the Indiankill: Bridge Replacement
S129

1021.29

NY 159 Bridge over CSX: Bridge Replacement
S131

B112

Thruway Bridge over CSX (Milepost 158.98)
S136

1034.18

NY 5, from NY 147 to Washington Avenue: Resurfacing
S140

1754.63

Mohawk-Hudson Bike-Hike Trail: Corridor Improvements
S141

1754.65

Rail Corridor Bridge Improvements
S142

1754.64

Kings Road Sidewalks
S143

1754.66

Bicycle and Pedestrian Path Near Lock 8
S144

1754.58

State Street Streetscape
S146

NA

State Street Transportation Corridor Streetscape
S149

1755.06

Cole Road Bridge over the Normanskill: Bridge Reconstruction
S150

1935.52

NYSDOT/Amtrak Rail Initiative: Rensselaer to Schenectady Double Track
S153

1755.78

Bike Trail in Niskayuna, Repairs
S154

Mohawk-Hudson Bike-Hike Trail
S155

1755.79

Scotia Sidewalks
S157

1756.01

Maple Avenue Realignment
S158

1357.12

I-88 Resurfacing Part 2: NYS Thruway Exit 25A to Weaver Road
S160

1756.16

Mohawk-Hudson Bike-Hike Trail
S161

Glenville & Scotia Sidewalks
S162

H503

Thruway: Pavement Rehabilitation
S163

1528.75

Thruway: Pavement Rehabilitation
S164

H76

Thruway: Drainage Improvements
S165

R33

Mohawk-Hudson Bike-Hike Trail: Rotterdam Junction to Amsterdam
S166

1306.66

NY 7 over Normanskill: Bridge Replacement
S167

1755.33

Oak Street over CSX: Bridge Replacement
S168

1805.68

Ferry Road over Backchannel Mohawk: Bridge Replacement
S169

1528.74

Thruway: Pavement Rehabilitation
S170

1941.19

Western Gateway Transportation Center
S171

Rehabilitation at Lock E-8
S172

1306.72

NY 7, I-890 to St. David’s Lane:






CDTC Home Page   |  Site Map