| FEDERAL-AID OBLIGATIONS FFY 02-03 |
| TIP# | PHASE | PIN | DESCRIPTION | FUND | OBL DATE | LET DATE |
---|
| A199 | 146037 | RT 32/D&HRR, MENANDS |
| CONSTRUCTION AND INSPECTION | 4.604 | | HBRR | 7/17/2003 | 3/6/2003 |
| DETAILED DESIGN | 0.255 | | HBRR | 6/18/2003 | 3/6/2003 |
| ROW INCIDENTALS | 0.008 | | HBRR | 6/26/2003 | 3/6/2003 |
| PROJECT TOTAL | 4.867 |
| A223 | 111127 | RT 20:RT 158 TO RT 146 |
| CONSTRUCTION AND INSPECTION | -0.267 | | STP-FLEX | 8/21/2003 | 9/25/1997 |
| ROW ACQUISITION | -0.612 | | STP-FLEX | 11/20/2002 | 9/25/1997 |
| PROJECT TOTAL | -0.879 |
| A229 | 152852 | I90 EXIT 5A(CORPORATE WOODS) TO PATROON ISLAND |
| CONSTRUCTION AND INSPECTION | 18.221 | | IM | 3/19/2003 | 6/5/2003 |
| PRELIM.DESIGN | 0.255 | | IM | 3/17/2003 | 6/5/2003 |
| ROW ACQUISITION | 0.102 | | IM | 1/7/2003 | 6/5/2003 |
| PROJECT TOTAL | 18.578 |
| A262 | 100713 | RT 144/COEYMANS CREEK:ALB CO |
| CONSTRUCTION AND INSPECTION | 0.659 | | HBRR | 6/17/2003 | 2/20/2003 |
| DETAILED DESIGN | 0.066 | | HBRR | 6/25/2003 | 2/20/2003 |
| PROJECT TOTAL | 0.725 |
| A274 | 175335 | WHITEHALL ROAD RECONSTRUCTION |
| DETAILED DESIGN | -0.224 | | STP-LG-URB | 4/2/2003 | 3/7/2000 |
| ROW ACQUISITION | -0.098 | | STP-LG-URB | 4/2/2003 | 3/7/2000 |
| PROJECT TOTAL | -0.322 |
| A287 | 175326 | NORTH MOHAWK ST RECONST:COHOES |
| CONSTRUCTION AND INSPECTION | 0.050 | | STP-LG-URB | 12/31/2002 | 7/11/2002 |
| ROW ACQUISITION | 0.038 | | HBRR | 10/9/2002 | 7/11/2002 |
| PROJECT TOTAL | 0.087 |
| A315 | 105150 | I787: RTE. 9W TO RTE. 7 ; RESURFACE |
| CONSTRUCTION AND INSPECTION | 2.009 | | IM | 8/21/2003 | 3/21/2002 |
| PROJECT TOTAL | 2.009 |
| A333 | 175438 | PEARL ST RECON:PINE-LIVINGSTON |
| CONSTRUCTION AND INSPECTION | 0.150 | | STP-LG-URB | 6/5/2003 | 3/9/2000 |
| PROJECT TOTAL | 0.150 |
| A338 | 175442 | ELM AVE(CR 52):RT 443 - RT 32 |
| CONSTRUCTION AND INSPECTION | 4.511 | | STP-FLEX | 3/26/2003 | 1/30/2003 |
| DETAILED DESIGN | 0.012 | | STP-FLEX | 7/21/2003 | 1/30/2003 |
| PROJECT TOTAL | 4.523 |
| A351 | 172175 | I-87/POLLOCK ROAD & SAND CREEK RD. |
| CONSTRUCTION AND INSPECTION | 0.380 | | NHS | 1/22/2003 | 5/18/2000 |
| PROJECT TOTAL | 0.380 |
| A375 | 172160 | I87:EXIT 1 - EXIT 6, RESURF |
| DETAILED DESIGN | 0.090 | | NHS | 7/1/2003 | 2/5/2006 |
| PRELIM.DESIGN | 0.225 | | IM | 7/1/2003 | 2/5/2006 |
| ROW INCIDENTALS | 0.040 | | NHS | 7/1/2003 | 2/5/2006 |
| SCOPING | 0.090 | | IM | 7/1/2003 | 2/5/2006 |
| PROJECT TOTAL | 0.445 |
| A397 | 100611 | RTE 143/HANNACROIX CR |
| CONSTRUCTION AND INSPECTION | 0.932 | | HBRR | 6/16/2003 | 3/27/2003 |
| DETAILED DESIGN | 0.022 | | HBRR | 6/30/2003 | 3/27/2003 |
| PROJECT TOTAL | 0.954 |
| A399 | 104510 | RTE 378/D&HRR, BR. REPL. |
| CONSTRUCTION AND INSPECTION | 1.513 | | HBRR | 6/23/2003 | 5/8/2003 |
| DETAILED DESIGN | -0.151 | | HBRR | 7/10/2003 | 5/8/2003 |
| PROJECT TOTAL | 1.362 |
| A407 | 175562 | ALBANY CITY SIGNS |
| DETAILED DESIGN | 0.171 | | STP-SAFETY | 10/11/2002 | 12/15/2003 |
| PRELIM.DESIGN | 0.171 | | STP-SAFETY | 10/11/2002 | 12/15/2003 |
| SCOPING | 0.086 | | STP-SAFETY | 10/11/2002 | 12/15/2003 |
| PROJECT TOTAL | 0.428 |
| A408 | 175654 | EMERGENCY REPAIRS TO OLD RAVENA RD./CONRAIL, |
| CONSTRUCTION AND INSPECTION | 0.443 | | HBRR | 9/11/2003 | 8/15/2003 |
| PROJECT TOTAL | 0.443 |
| A416 | 146042 | RTE 32/MOHAWK RIVER, BR. REPL. |
| DETAILED DESIGN | 0.029 | | HBRR | 7/7/2003 | 4/15/2008 |
| PROJECT TOTAL | 0.029 |
| A420 | 175605 | CANNON STREET RECONSTRUCTION |
| DETAILED DESIGN | 0.422 | | SPEC APP | 1/16/2003 | 8/1/2003 |
| PRELIM.DESIGN | 0.150 | | SPEC APP | 1/16/2003 | 8/1/2003 |
| ROW INCIDENTALS | 0.029 | | SPEC APP | 1/16/2003 | 8/1/2003 |
| PROJECT TOTAL | 0.601 |
| A423 | 175619 | CARMAN RD. SIDEWALKS |
| DETAILED DESIGN | -0.042 | | STP-FLEX | 7/1/2003 | 9/25/2003 |
| PROJECT TOTAL | -0.042 |
| ADJUSTM | 1FED03 | ADJUSTMENTS TO OLD FA PROJECTS-FFY03 |
| CONSTRUCTION AND INSPECTION | -0.197 | | SPEC APP | 4/22/2003 |
| PRELIM.DESIGN | 0.030 | | HBRR | 4/2/2003 |
| ROW ACQUISITION | -0.662 | | HBRR | 4/7/2003 |
| ROW INCIDENTALS | -0.046 | | STP-RURAL | 12/23/2002 |
| PROJECT TOTAL | -0.876 |
| NOTIP# | 104321 | RTE9/MOHAWK @ CRESCENT |
| CONSTRUCTION AND INSPECTION | -1.222 | | HBRR | 11/7/2002 | 9/15/1996 |
| PROJECT TOTAL | -1.222 |
| R106 | 100128 | RT 2/POESTENKILL: BRUNSWICK |
| PRELIM.DESIGN | 0.100 | | HBRR | 4/21/2003 | 7/1/2005 |
| PROJECT TOTAL | 0.100 |
| R110 | 175387 | 3RD ST & 3RD AVE RECONST:RENSS |
| CONSTRUCTION AND INSPECTION | 0.000 | | STP-LG-URB | 6/16/2003 | 10/31/2001 |
| DETAILED DESIGN | -0.065 | | STP-LG-URB | 4/2/2003 | 10/31/2001 |
| PROJECT TOTAL | -0.065 |
| R111 | 130653 | RT 7: LAKE AVE TO RTE. 142 |
| DETAILED DESIGN | 0.120 | | NHS | 7/1/2003 | 1/29/2004 |
| ROW ACQUISITION | 0.061 | | NHS | 10/16/2002 | 5/3/2001 |
| PROJECT TOTAL | 0.181 |
| R115 | 175325 | CHURCH ST/HOOSIC RIV: HOOSICK |
| DETAILED DESIGN | 0.100 | | HBRR | 1/22/2003 | 9/12/2002 |
| PROJECT TOTAL | 0.100 |
| R123 | 113045 | RT 22:VILLAGE OF HOOSICK FALLS |
| CONSTRUCTION AND INSPECTION | 2.767 | | HBRR | 6/23/2003 | 2/20/2003 |
| PROJECT TOTAL | 2.767 |
| R128 | 133517 | RT 40/TOMHANNOCK CREEK |
| CONSTRUCTION AND INSPECTION | 1.575 | | STP-FLEX | 4/9/2003 | 4/3/2003 |
| DETAILED DESIGN | 0.066 | | STP-FLEX | 3/11/2003 | 4/3/2003 |
| ROW ACQUISITION | 0.018 | | STP-FLEX | 10/11/2002 | 4/3/2003 |
| PROJECT TOTAL | 1.659 |
| R155 | 175339 | RT 2:11TH ST - PAWLING AVENUE |
| DETAILED DESIGN | 0.240 | | STP-LG-URB | 8/8/2003 | 12/15/2004 |
| ROW ACQUISITION | 0.002 | | STP-LG-URB | 10/16/2002 | 12/15/2004 |
| PROJECT TOTAL | 0.242 |
| R156 | 175340 | C.R. 51/UNKNOWN CRK:2 BRGS |
| CONSTRUCTION AND INSPECTION | 0.155 | | HBRR | 7/25/2003 | 3/29/2001 |
| PROJECT TOTAL | 0.155 |
| R157 | 104315 | RT 9&20 RECONSTRUCTION PART I |
| CONSTRUCTION AND INSPECTION | 1.659 | | STP-SAFETY | 12/27/2002 | 4/5/2001 |
| DETAILED DESIGN | 0.077 | | STP-FLEX | 11/6/2002 | 4/5/2001 |
| ROW ACQUISITION | 0.140 | | STP-FLEX | 11/19/2002 | 4/5/2001 |
| PROJECT TOTAL | 1.876 |
| R173 | 108962 | I-90 CONNECTOR PHASE II |
| DETAILED DESIGN | 0.080 | | FED DEMO | 4/7/2003 | 6/1/2006 |
| PROJECT TOTAL | 0.080 |
| R185 | 113063 | RT 22/KINDERHOOK CREEK:RENSS. |
| DETAILED DESIGN | 0.032 | | HBRR | 10/11/2002 | 5/13/2015 |
| PRELIM.DESIGN | 0.064 | | HBRR | 10/11/2002 | 5/13/2015 |
| ROW INCIDENTALS | 0.008 | | HBRR | 10/11/2002 | 5/13/2015 |
| SCOPING | 0.064 | | HBRR | 10/11/2002 | 5/13/2015 |
| PROJECT TOTAL | 0.168 |
| R186 | 130661 | RT 7/HOOSICK RIVER: HOOSICK |
| SCOPING | 0.048 | | HBRR | 4/3/2003 | 8/20/2007 |
| PROJECT TOTAL | 0.048 |
| R190 | 150309 | RT 66/KINDERHOOK CREEK:NASSAU |
| CONSTRUCTION AND INSPECTION | 1.663 | | HBRR | 6/17/2003 | 2/27/2003 |
| DETAILED DESIGN | 0.108 | | HBRR | 10/17/2002 | 2/27/2003 |
| ROW ACQUISITION | 0.015 | | HBRR | 6/26/2003 | 2/27/2003 |
| PROJECT TOTAL | 1.786 |
| R191 | 175400 | COTTRELL RD/WALLOOMSAC:HOOSICK |
| CONSTRUCTION AND INSPECTION | 0.720 | | HBRR | 1/14/2003 | 2/20/2003 |
| PROJECT TOTAL | 0.720 |
| R195 | 175459 | SO.TROY INDUSTRIAL PARK RD. |
| DETAILED DESIGN | 0.104 | | STP-LG-URB | 9/5/2003 | 6/12/2005 |
| PROJECT TOTAL | 0.104 |
| R197 | 175469 | WASHINGTON AVENUE SIDEWALKS |
| CONSTRUCTION AND INSPECTION | 0.240 | | STP-FLEX | 7/31/2003 | 8/30/2003 |
| PROJECT TOTAL | 0.240 |
| R200 | 175487 | CR 59 AND 103 OVER THE HOOSIC RIV. |
| CONSTRUCTION AND INSPECTION | 0.923 | | FED DEMO | 8/25/2003 | 9/9/2003 |
| PROJECT TOTAL | 0.923 |
| R219 | 175542 | TRAFFIC SIGNAL WORK , CITY OF TROY |
| CONSTRUCTION AND INSPECTION | 1.030 | | CMAQ | 8/27/2003 | 12/15/2003 |
| PROJECT TOTAL | 1.030 |
| RG1 | 1TR602 | PARK AND RIDE LOTS SETASIDE |
| PRELIM.DESIGN | 0.040 | | CMAQ | 4/17/2003 |
| PROJECT TOTAL | 0.040 |
| RG23 | 180578 | TRAFFIC SIGNAL REQ. CONTRACT |
| CONSTRUCTION AND INSPECTION | 0.533 | | STP-SAFETY | 11/4/2002 | 3/25/1999 |
| PROJECT TOTAL | 0.533 |
| RG27 | 1T0502 | TRAVEL DEMAND MANAGEMENT |
| MISCELLANEOUS | 0.422 | | CMAQ | 4/17/2003 |
| PROJECT TOTAL | 0.422 |
| RG28 | 175373 | ADVANCED TRAFFIC MANAGEMENT |
| CONSTRUCTION AND INSPECTION | 0.115 | | CMAQ | 8/8/2003 | 1/15/1998 |
| DETAILED DESIGN | 0.243 | | CMAQ | 7/17/2003 | 1/15/1998 |
| PROJECT TOTAL | 0.358 |
| RG31 | 182144 | CORRIDOR MANAGEMENT INITIATIVE |
| MISCELLANEOUS | 0.086 | | STP-FLEX | 4/17/2003 |
| PROJECT TOTAL | 0.086 |
| RG40 | 193193 | BEAVER DAM RD/CONRAIL RR |
| CONSTRUCTION AND INSPECTION | 0.772 | | STP-RAIL | 9/9/2003 |
| PRELIM.DESIGN | 0.049 | | STP-RAIL | 1/9/2003 | 11/25/2003 |
| PROJECT TOTAL | 0.821 |
| RG41 | 175622 | TOWN OF MALTA PED IMPROVE PROJECT |
| CONSTRUCTION AND INSPECTION | 0.012 | | STP-FLEX | 7/25/2003 | 9/13/2003 |
| PRELIM.DESIGN | 0.002 | | STP-FLEX | 12/13/2002 | 9/13/2003 |
| PROJECT TOTAL | 0.014 |
| RG96 | 1RTP02 | RECREATIONAL TRAILS FFY2003 |
| MISCELLANEOUS | 0.100 | | SPEC APP | 5/30/2003 |
| PROJECT TOTAL | 0.100 |
| S144 | 175458 | RT 5, STATE STREET STREETSCAPE PHASE 2 |
| CONSTRUCTION AND INSPECTION | 4.621 | | STP-LG-URB | 1/6/2003 | 2/19/2003 |
| PROJECT TOTAL | 4.621 |
| S149 | 175506 | COLE RD. OVER NORMANSKILL |
| CONSTRUCTION AND INSPECTION | 0.242 | | HBRR | 7/25/2003 | 4/20/2003 |
| PROJECT TOTAL | 0.242 |
| S156 | 175591 | MOHAWK - HUDSON BIKE TRAIL (SCHEN) |
| DETAILED DESIGN | 0.012 | | STP-FLEX | 4/3/2003 | 5/15/2004 |
| PROJECT TOTAL | 0.012 |
| S158 | 135712 | I-88 ; WEAVER RD TO NYS THRUWAY |
| CONSTRUCTION AND INSPECTION | 0.269 | | NHS | 10/22/2002 | 9/26/2002 |
| PROJECT TOTAL | 0.269 |
| SA133 | 175455 | SOUTH BROADWAY @ BALLSTON AVE |
| DETAILED DESIGN | 0.016 | | STP-SM-URB | 1/15/2003 | 12/25/2004 |
| PRELIM.DESIGN | 0.092 | | STP-SM-URB | 1/15/2003 | 12/25/2004 |
| SCOPING | 0.012 | | STP-SM-URB | 1/15/2003 | 12/25/2004 |
| PROJECT TOTAL | 0.120 |
| SA148 | 175401 | C.R.49/KAYADEROSSERAS CREEK |
| CONSTRUCTION AND INSPECTION | 0.950 | | HBRR | 4/22/2003 | 8/15/2003 |
| PROJECT TOTAL | 0.950 |
| SA154 | 123619 | RT 29:MILTON W. TN LINE - SHAW/BOYHAVEN RDS |
| CONSTRUCTION AND INSPECTION | 0.963 | | NHS | 4/2/2003 | 3/21/2002 |
| PROJECT TOTAL | 0.963 |
| SA164 | 182171 | WARREN COUNTY SCENIC TRAIN: CORINTH TO |
| CONSTRUCTION AND INSPECTION | 6.451 | | FED DEMO | 1/27/2003 | 8/16/2003 |
| DETAILED DESIGN | 0.064 | | FED DEMO | 1/14/2003 | 8/16/2003 |
| PROJECT TOTAL | 6.515 |
| SA170 | 118832 | RTE 67/UNKNOWN CREEK, BR.REPL. |
| DETAILED DESIGN | 0.024 | | HBRR | 10/16/2002 | 10/7/2005 |
| PRELIM.DESIGN | 0.040 | | HBRR | 10/16/2002 | 10/7/2005 |
| ROW INCIDENTALS | 0.028 | | HBRR | 10/16/2002 | 10/7/2005 |
| SCOPING | 0.028 | | HBRR | 10/16/2002 | 10/7/2005 |
| PROJECT TOTAL | 0.120 |
| SA191 | 175620 | HADLEY SIDEWALK IMPROVEMENT |
| CONSTRUCTION AND INSPECTION | 0.025 | | STP-FLEX | 4/30/2003 | 2/15/2003 |
| PROJECT TOTAL | 0.025 |
| SA203 | 194117 | SARATOGA STATION TRACK/POWER SWITCHES |
| CONSTRUCTION AND INSPECTION | 0.370 | | FED DEMO | 2/25/2003 | 6/1/2003 |
| PROJECT TOTAL | 0.370 |
| SA48 | 118821 | RT 67/I-87: EXIT 12 MALTA |
| DETAILED DESIGN | 0.625 | | IM | 7/17/2003 | 4/17/2004 |
| PROJECT TOTAL | 0.625 |
| SA89 | 180227 | WEST AVE:RT 9N TO CONGRESS AVE |
| CONSTRUCTION AND INSPECTION | 0.326 | | STP-SM-URB | 3/6/2003 | 3/9/2000 |
| DETAILED DESIGN | 0.005 | | STP-FLEX | 12/4/2002 | 3/9/2000 |
| ROW ACQUISITION | 0.005 | | STP-FLEX | 8/6/2003 | 3/9/2000 |
| PROJECT TOTAL | 0.336 |
| T49 | 1T0509 | GUARANTEED RIDE HOME |
| PRELIM.DESIGN | 0.028 | | CMAQ | 4/17/2003 |
| PROJECT TOTAL | 0.028 |
| T53 | 175356 | I87 PARK&RIDE LOTS: EXITS 8&8A |
| ROW INCIDENTALS | 0.100 | | NHS | 10/16/2002 | 6/26/1997 |
| PROJECT TOTAL | 0.100 |
| Grand Total | 62.022 |