TASK STATUS FOR THE 2006-08 UPWP
Continuing Tasks in both the 2005-06
and 2006-08 UPWPs
Task Lead
Agency 06-08 Comments
1.51 Committee Activities CDTC
1.61 Certification Review CDTC FFY04 review to be
repeated FFY08
1.65 UPWP Development and Monitoring CDTC develop 2008-10
two-year UPWP
1.66 DBE/Title VI Program Update CDTC Envir.
Justice work continues
1.68 Statewide MPO
Administration CDTC continue consultant
support
2.16 Microcomputer Model Refinement CDTC continue development
of new model
2.30 Routine Highway Condition Inventory CDTC federal-aid system in 2007
2.31 Traffic Volume Report CDTC web-based, continual
updates
2.25 Collection of Transp Planning Support Data CDTC continued
heavy use of interns
2.28 Census Transp. Planning Package CDTC further NHTS
exploration in 2006
2.29 Geog.Info System for Transp. CDTC coordinate
with new traffic model
3.77 New Visions CDTC New Visions 2030, 2035/2040
3.05 Infrastructure Renewal Planning CDTC resource review for
New Visions 2030
3.06 Goods Movement Planning CDTC switch to annual
conference
3.10 I-87 Corridor CDTC phase 2 in 04-05; final
report soon
3.86 Continuous Aviation System Planning CDRPC
3.01 Management Systems CDTC development of
Safety Mgt. System;
update of CMS data, process
3.02 Air Quality Planning CDTC conformity continues
3.11 REVEST CDTC folded into I-87
corridor committee
4.07
4.17 Arterial Management Planning CDTC revise, update
standards
4.62 Transit Operations Planning CDTA TDP effort major activity
4.67 Bicycle and Pedestrian Planning CDTC Engage in New
Visions 2030
4.97 TIP Development, Monitoring and Update CDTC develop,
adopt 2007-12 TIP
5.11 Regional Operations Planning CDTC/NYSDOT continuing
5.51 General Technical Services CDTC continued local
support
5.61 Project Development Support CDTC
/ NYSDOT TIP
Implementation
5.67 Linkage Project Oversight CDTC continuing, larger
budget
5.68 Linkage Technical Work CDTC as needed to support
consultant work
5.52 General Community Services CDTC
5.57 Commuter Support Services CDTC refine on-line
matching operation
5.60 Public Transit Planning Support CDTC
/ CDTA linkage to New
Visions, BRT, TDP
5.62 Corridor Management Initiative Municipalities
/ CDTC / NYSDOT covers costs of NY5 BRT
design
5.63 Demand Management CDTA/
NYSDOT / CDTC pilot CMAQ programs
continue
5.86 Clean Communities Program CDTC continuing without
DOE funding
TASK STATUS FOR THE 2006-08 UPWP
Carryover tasks from 2005-06
and New Tasks in the 2006-08 UPWP
Task Lead
Agency 06-08 Comments
1.67 Prospectus CDTC to reflect NYSDOT
transformation
deferred to 06-08
3.12 Transit Service Design Guidelines CDTC/CDTA underway as part of TDP
effort
4.19 Trail User and Property Owner Survey CDTC new
5.62 NY 5 Corridor Support CDTC continuing
5.81 Lansingburgh Study Troy delayed; complete
in 06-08
5.84 NY 5 Corridor Tools CDTC folded into Task
5.62
5.85 Integrated Transp. / Community Design CDTC complete in 06-08
5.88 Ballston/Malta Route 67 study CDTC underway, complete
in 06-08
5.97 Thruway Capacity Study Thruway
Authority carryover,
complete in 06-08
5.98 North Greenbush I-90 Land Use Study North
Greenbush carryover, TIP
funded, compl in 06-08
5.01 Arbor Hill Gateway Planning CDTC delete; completed
with city funds
5.03
5.04 East Greenbush Route 4 CDTC completed in 05-06
5.06 Halfmoon Center Roadways CDTC completed in 05-06
5.09 Linkage Reserve CDTC reserve for 07-08
studies
5.10 Travel Behavior Factors SCI CDTC/NYSMPO initiated in 04-05; completed
in 05-06
5.12 Malta Route 9 Corridor CDTC initiated in 05-06,
complete 06-08
5.13 Harriman Campus Redevelopment HRTDC/CDTC initiated in 05-06, complete
06-08
5.14 Stillwater Route 4 Main Street CDTC initiated in 05-06,
complete 06-08
5.15 Saratoga Springs Downtown CDTC initiated in 05-06,
complete 06-08
5.16 Guilderland Hamlet Study CDTC initiated in 05-06,
complete 06-08
5.18 Hadley Streetscape Study CDTC initiated and
completed in 05-06
5.19 East Berne Hamlet Study CDTC initiated in 05-06,
complete 06-08
5.20 Bicycle Quantifications Study CDTC new
5.21 North Swan Multimodal Accessiblity CDTC new
5.22 Delaware Avenue Hamlet Enhancement CDTC new
5.23 Van Shaick Island Transp
& Revitalization CDTC new
5.24 Route 20 Land Use / Transportation CDTC new
5.25 Renss. Traffic Patterns and Connectivity CDTC new
5.26 NY 7 / NY 146, Rotterdam CDTC new
5.27 NY 5 Transit Oriented Mixed Use Catalyst CDTC new,
CMAQ funded from TIP
5.28 Scotia Waterfront / Master Plan Overlay CDTC new
5.29 Congress & Ferry Mixed Use Development CDTC new