Project Description
Rensselaer Amtrak Station ITS This is an operational test of EZ-Pass Plus at the above mentioned station. Local match is 50%. To be implemented with T54 .
This is an operational test of EZ-Pass Plus at the above mentioned station. Local match is 50%. To be implemented with T54 .
Local match is 50%. To be implemented with T54 .
To be implemented with T54 .
Funding by Federal Fiscal Year (10/1 to 9/30)
Fund Source
1998-99
1999-00
2000-01
2001-02
2002-03
2003-04
Post '04
Funding Totals by Phase
Phase
Five-Year Funding
Six-Year Funding
Construction
Total
Other Information
TIP Number: T67 Letting Date: NA
Letting Date: NA
PIN: NA Func. Class: NA
Func. Class: NA
Project Type: Miscellan Length: NA
Length: NA
Jurisdiction: CDTA Plan Ref.: ITS
Plan Ref.: ITS
Location: Regional No EIS Required
No EIS Required
Implementer: CDTA Air Quality: Exempt
Air Quality: Exempt