List of TIP Projects in NYSDOT PIN Order


TIP Number

PIN

Truncated Description

RG1

Park and Ride Lots for Carpools Set-Aside
T57

Preventive Maintenance
T58

Bikes on Buses
T59

Replacement Shuttle Vehicles
T60

Replace/Upgrade Radio System
T61

Fare Collection Systems
T62

Information Systems
T63

New Star Facility
T64

Customer Information Systems
T66

Welfare to Work
T67

Rensselaer Amtrak Station ITS
A404

Park and Ride Lot at the End of I-787
A409

City of Albany Bike Racks
A410

Bethlehem Sidewalks
A411

Cohoes Bike Racks
A412

Mohawk-Hudson Bikeway
A413

Green Island Bridge Sidewalks
A414

Wards Lane Sidewalk
A415

Albany Waterfront Intermodal Enhancements
R223

Troy Pedestrian Bicycle Trail
SA177

Town of Malta Trail Improvements
SA178

Arongen-Shenendahowa Public Library Multi-Use Path
SA179

Station Lane Sidewalks, Saratoga Springs
SA180

Crosswalk and Four Pedestrian Signs, Town of Stillwater
SA181

Spring Run Trail Construction Construction of a 6,600 linear foot trail from East Avenue to I-87. This
SA182

Ruhle Road Pedestrian Bridge: Restoration This project will restore and preserve
S152

Mohawk-Hudson Bike-Hike Trail, Near Lock 8: Reconstruction
S153

Bike Trail in Niskayuna, Repairs
S154

Mohawk-Hudson Bike-Hike Trail
S155

Scotia Sidewalks
S156

Mohawk-Hudson Bike Trail
R179

1001.18

NY 2 Bridge over Little Hoosick River: Bridge Replacement
R215

1001.26

NY 2, Grafton to Petersburgh: Resurfacing
R130

1001.27

NY 2, from Petersburg to the Massachusetts State Line: Resurfacing
R106

1001.28

NY 2 Bridge over the Poestenkill: Bridge Replacement
A369

1002.09

NY 85A, from NY 155 to Western Village Line in Voorheesville: Reconstruction
A398

1002.10

NY 85A Bridge over Vly Creek: Bridge Reconstruction or Replacement
S79

1003.43

NY 103 Bridge over Erie Canal: Bridge Rehabilitation
A371

1004.05

NY 140 (Kenwood Avenue), from NY 443 (Delaware Avenue) to the CR 52 (Cherry
A265

1006.07

NY 143, from NY 9W to Coeymans' Hollow: Reconstruction
A358

1006.10

NY 143, from BIN 103803 to CR 103: Resurfacing
A397

1006.11

NY 143 Bridge over Hannacrois Creek: Bridge Reconstruction or Replacement
A262

1007.13

NY 144 Bridge over Coeymans Creek: Bridge Replacement
A247

1007.14

NY 144, from Greene County Line to NY 143: Resurfacing
A264

1007.15

NY 144 Bridge over the Vlomankill: Bridge Rehabilitation
A248

1007.16

NY 144 Bridge over Hannacrois Creek: Bridge Deck Repairs
A335

1011.10

NY 145 Bridge over Fox Creek: Bridge Replacement
S101

1020.08

NY 158, from Curry Road to Railroad: Resurfacing
S129

1021.29

NY 159 Bridge over Conrail: Bridge Replacement
S136

1034.18

NY 5, from NY 147 to Washington Avenue: Resurfacing
A359

1039.42

US 9W, Greene County Line to Bethlelem Line: Reconstruction
A360

1039.43

NY 9W & 32: Delmar Bypass Reconstruction
A396

1039.46

NY 9W Bridge over Conrail: Bridge Reconstruction or Replacement
A235

1043.07

US 9 and Livingston Avenue: Intersection Improvements
R157

1043.15

US 9 & 20 Reconstruction Part 1: from Ames Plaza to US 4
A226

1043.16

Lark/Dove Interchange: Repair Bridge Deck, Contract #4
SA95

1043.19

US 9 Intersection with Crescent Road and Church Hill Road: Intersection
SA100

1043.20

South Broadway (NY 9), from West Fenlon Road to the Avenue of the Pines:
R177

1043.27

NY 9 & 20 Reconstruction Part 3: from Miller Road to I-90
R176

1043.30

NY 9 & 20 Reconstruction Part 2: NY 4 to Miller Road
A361

1045.09

NY 378 Bridge over Hudson River: Tower Removal
A399

1045.10

NY 378 Bridge over D&H: Bridge Reconstruction or Replacement
A249

1049.03

NY 397 Bridge over the Bozenkill: Bridge Replacement
A315

1051.50

I-787, from US 9W to the South Mall Expressway: Resurfacing
A362

1051.51

I-787, from NY 378 to NY 7: Resurfacing
R133

1057.13

NY 150 Bridge over the Moordenerkill (BIN 1038530): Bridge Replacement
R107

1057.14

NY 150 Bridge over the Moordenerkill (BIN 1038560): Bridge Replacement
R180

1057.16

NY 150, from CR 6 to US 9 & 20: Reconstruction
A267

1085.26

NY 146 in the Village of Altamont: Reconstruction
SA108

1085.27

Balltown Road, from River Road to Glenridge Road: Corridor Improvements
S96

1085.27

Balltown Road, from River Road to Glenridge Road: Corridor Improvements
R120

1086.20

NY 43, Glass Lake to Denault Corners: Resurfacing
R135

1086.23

NY 43 over Tsatsawassa Creek: Bridge Replacment
R181

1086.24

NY 43 Bridge over Taborton Creek: Bridge Replacement
R182

1086.25

NY 43 Bridge over West Brook: Bridge Replacement
R105

1089.48

Vandenburg Avenue, from Williams Road to Morrison Avenue: Reconstruction
SA84

1089.54

US 4 Bridge over the D&H Railroad: Bridge Reconstruction
SA142

1089.58

NY 4, in the Village of Schuylerville: Reconstruction
SA143

1089.59

NY 4, from NY 32 to Village of Schuylerville: Resurfacing
R173

1089.62

I-90 Exit 8 Connector Phase 2: ITS Demonstration.
A323

1090.10

NY 443, from CR 52 to the D&H Railroad: Resurfacing
A337

1090.11

NY 443 from Delaware Plaza to the DHRR: Reconstruction
A330

1090.12

NY 443 over Onesquethaw Creek: Bridge Replacement
A363

1092.04

South Mall Expressway Bridges: Deck Work
SA88

1096.18

NY 50, North of Saratoga Springs: Reconstruction
S97

1096.19

NY 50, Freeman's Bridge Road to Glenridge Road: Corridor Improvements
S126

1096.21

NY 50 Bridge over the Indiankill: Bridge Replacement
R168

1097.04

NY 9J, from Castleton to CR 6 (Maple Hill Road): Reconstruction
R183

1097.05

NY 9J, from Columbia County Line to Castleton Line: Reconstruction
R108

1111.29

US 20, from Columbia County to Nassau: Resurfacing
R164

1111.30

US 20 Bridge over the Valatiekill: Bridge Replacement
SA152

1116.43

NY 9N Bridge over the Hudson River: Bridge Replacement
A209

1125.16

Buckingham Drive Bridge over NY 85: Bridge Replacement
A321

1125.18

NY 85 Near the State Office Campus: Resurfacing
A243

1125.19

Slingerlands Bypass (NY 85) Phase 3
A364

1125.20

NY 85 in the Town of Rensselaerville: Reconstruction
A348

1125.23

NY 85 over Onesquethaw Creek: Bridge Replacement
A242

1125.24

Slingerlands Bypass (NY 85) Phase 2
A349

1125.25

Slingerlands Bypass (NY 85) Phase 1
R123

1130.45

NY 22 in the Village of Hoosick Falls: Reconstruction
R194

1130.58

NY 67, from NY 22 to Vermont Line: Reconstruction
R184

1130.60

NY 22 Bridge over the Walloomsac River: Bridge Replacement
R185

1130.63

NY 22 Bridge over Kinderhook Creek: Bridge Replacement
A365

1132.12

NY 155, from NY 85A to NY 20: Reconstruction
R127

1188.19

NY 67, Valley Falls to Eagle Bridge: Resurfacing
SA80

1188.20

NY 67, Malta/Stillwater Line to the Southern Overlap with NY 9: Resurfacing
SA48

1188.21

NY 67 Bridge over I-87 Exit 12: Bridge Reconstruction
SA70

1188.26

NY 67 Bridge over Abandoned Deleware & Hudson Line: Bridge Reconstruction
R134

1188.27

NY 67 Bridge over the Champlain Canal and Hudson River: Bridge Rehabilitation
SA145

1188.30

NY 67 Bridge over Gordon Creek: Bridge Replacement
SA170

1188.32

NY 67 Bridge over Unnamed Creek: Bridge Replacement or Rehabilitation
SA153

1236.14

NY 29, Jockey Street to Armer Road: Reconstruction.
SA174

1236.18

NY 29, Creek Road to Middle Line Road: Resurfacing
SA154

1236.19

NY 29, Armer Road to Creek Road: Reconstruction.
S104

1261.05

NY 147, from NY 5 to Vley Road: Resurfacing
A196

1306.47

NY 7 Bridge over I-890: Bridge Replacement
A198

1306.50

NY 7 Bridge over I-87 (Exit 6): Bridge Reconstruction or Replacement
S93

1306.51

NY 7 at the Five Corners: Intersection Improvements
S94

1306.52

NY 7 and NY 146: Intersection Improvements
R111

1306.53

NY 7, from McChesney Avenue to NY 142: Reconstruction and Hoosick Street
A317

1306.57

NY 2 Bridge over US 9: Bridge Reconstruction
R166

1306.58

NY 7, from CR 95 (Hill Road) to the Vermont State Line: Reconstruction
S125

1306.59

NY 7, from I-890 to the Five Corners: Traffic Operations Improvements
R218

1306.60

Bennington Bypass
R186

1306.61

NY 7 Bridge over Hoosick River: Bridge Replacement
R187

1306.62

NY 7, from Raymertown to Pittstown: Resurfacing
R201

1306.63

NY 7 and CR 115 Safety Improvements
R211

1306.64

Hoosick Street Resurfacing and Signal Interconnect
R210

1306.68

NY 7, from Troy City Line to McChesney Avenue: Reconstruction
R128

1335.17

NY 40 Bridge over the Tomhannock Creek: Bridge Replacement
R188

1335.18

NY 40 Bridge over Hoosick River: Bridge Replacement
A290

1347.07

Selkirk Bypass
A252

1352.04

NY 156, from the Altamont Line to NY 443: Resurfacing
S137

1357.11

I-88, Thruway Interchange to Schoharie County Line: Resurfacing
A261

1460.31

NY 32, from CR 301 to CR 308: Reconstruction
SA57

1460.33

NY 32 Bridge over Barge Canal: Bridge Rehabilitation
A199

1460.37

NY 32 Bridge over D&H Railroad at Wards Lane: Bridge Repairs
A366

1460.40

NY 32, from City of Albany to City of Watervliet: Resurfacing
S115

1476

NYS Thruway at Milepost 164 Eastbound: Second Stage Drainage
R189

1503.08

NY 66, from NY 20 to East Nassau: Resurfacing
R190

1503.09

NY 66 Bridge over Kinderhook Creek: Bridge Replacement
R221

1503.09

NY 66 Bridge over Kinderhook Creek: Bridge Rehabilitation
S124

1525.29

I-890, from Campbell Road to Exit 26: Reconstruction
S145

1525.30

I-890, Exit 5 to Campbell Road: Resurfacing
A229

1528.52

I-90 Bridge over Conrail and Spur: Bridge Rehabilitation
A318

1528.55

I-90, Exit 6 to Patroon Island: Resurfacing
A319

1528.56

I-90, from I-87 to Exit 6: Reconstruction
R212

1528.67

I-90, from Exit 10 to Exit 11: Armor Coat
SA47

1721.39

I-87, Saratoga County Line to Exit 9: Resurfacing
A240

1721.51

Exit 3 or 4/Airport Connector Issues
SA116

1721.55

I-87 Bridge over the Snookkill: Bridge Replacement
SA122

1721.56

I-87 Bridge over the D&H Railroad North of Saratoga Springs: Bridge Replacement
RG80

1721.57

Permanent Variable Message Signs for Interstate Roads
SA121

1721.57

I-87 Resurfacing Part 1: from Exit 9 to Exit 13
A375

1721.60

I-87, from Exit 1 to the Saratoga County Line: Reconstruction
SA147

1721.74

Kinns Road Bridge over I-87: Bridge Replacement
A351

1721.75

I-87 Bridge over Pollock Road: Bridge Replacement
A353

1721.77

I-87 Bridge over Sand Creek Road: Bridge Replacement In-Kind
A370

1721.78

I-87 Bridge over Watervliet Shaker Road: Bridge Replacement
SA168

1721.92

I-87 Resurfacing Part 2: from Exit 9 to Exit 13.
A237

1753.09

Everett Road, from Albany Shaker Road to Exchange Street: Corridor Improvements
R115

1753.25

Church Street Bridge over the Hoosick River: Bridge Replacement
A287

1753.26

North Mohawk Street, from Mohawk Street to North City Line: Pavement
SA73

1753.31

CR 52 Bridge over the Glowgee Creek: Bridge Replacement
A275

1753.34

Albany Shaker Road, from NY 7 to Watervliet Shaker Road: Expand from Two
A274

1753.35

Whitehall Road, from New Scotland Avenue to Cardinal Avenue: Reconstruction Includes drainage, sidewalks, curbs, and
A289

1753.36

Grade Separation of Lincoln Avenue and Amtrak Tracks
A296

1753.37

Relocation of Maxwell Road Part 1: Albany Shaker Road Intersection
R155

1753.39

NY 2, from 11th Street to Pawling Avenue/Brunswick Road: Reconstruction Includes new sidewalks and curbs.
R156

1753.40

Bridges at Burden Lake
SA96

1753.42

Sixth Street Bridge over Railroad: Bridge Replacement
SA101

1753.43

Resurfacing of:
SA98

1753.44

Moe Road, from Grooms Road to NY 146: Resurfacing
SA93

1753.50

Middle Line Road (CR 59), from NY 50 to NY 67: Rehabilitate and Upgrade to State
S110

1753.51

Aqueduct/Maxon Road, from Balltown Road to Erie Blvd.: Reconstruction
RG29

1753.57

CDTC Technical Services
A295

1753.60

New Karner Road (NY 155), from US 20 to NY 5: Corridor Improvments
SA99

1753.62

Grooms Road (CR 91), from NY 146 to Miller Road: Resurfacing and Drainage
SA104

1753.63

Batchellerville Bridge (CR 98): Alternatives Analysis and Preliminary
S121

1753.65

State Street (NY 5), from Furman Street to Fehr Avenue: Resurfacing
RG28

1753.73

Intelligent Transportation System (ITS)
R110

1753.87

Third Street (Partition Street to Washington Avenue) and Third Avenue
R169

1753.90

Broadway/Waterfront Access
S127

1753.95

Mohawk-Hudson Bike Hike Trail
R172

1753.99

Mechanic Street Bridge over B&M Railroad: Bridge Replacement
R191

1754.00

Cottrell Road Bridge over Walloomsac River: Bridge Replacement
SA148

1754.01

CR 49 Bridge over Kaydeross Creek: Bridge Replacement
R192

1754.02

Hansen Road Bridge over the B&M Railroad: Bridge Replacement
A372

1754.04

Watervliet Shaker Road, from Karner Road to Albany Shaker Road: Corridor
A336

1754.05

New Karner Road Bridge over Conrail: Bridge Replacement
A333

1754.38

Pearl Street Reconstruction Part 2: from Pine to Livingston Avenue Part 1 rolled off the TIP and Part 3 is
A334

1754.39

Pearl Street Reconstruction Part 3: from McCarty Avenue to Madison Avenue Part 1 rolled off the TIP and Part 2 is
RG37

1754.40

ITS Block Operating Costs
A338

1754.42

Elm Avenue from Delaware Avenue (NY 443) to Delmar Bypass (NY 32):
A339

1754.43

Cherry Avenue (CR 52) from Kenwood Avenue (NY 140) to Delaware Avenue (NY
A340

1754.44

Lark Street (US 9W) from Madison Avenue to Clinton Avenue: Reconstruction
A341

1754.45

Central Avenue (NY 5), from City Limits to Manning Blvd.: Reconstruction
A342

1754.46

Morris/Cordell Grade Crossing Consolidation and Separation
A343

1754.47

Pinegrove Avenue Construction
A344

1754.48

Church Street Reconstruction
A345

1754.49

Elm Street Bypass
A347

1754.50

Lincoln Avenue Sidewalk, Village Bike Route Designation
R175

1754.51

ITS Signal Upgrades at Two Locations
R178

1754.52

Troy-Menands Bridge Pedestrian and Bicycle Access
SA131

1754.53

ITS Signal Upgrades at 21 Intersections in the City of Saratoga Springs
SA132

1754.54

CR 7 (South Shore Road) over Batcheller Creek: Bridge Replacement
SA133

1754.55

South Broadway/Ballston Avenue Intersection Improvements
SA135

1754.56

Sitterly Road and Woodin Road: Bike Paths on 5 Foot Shoulders
SA136

1754.57

Saratoga Springs Downtown Pedestrian Improvements
S144

1754.58

State Street Streetscape
R195

1754.59

South Troy Industrial Park Road
A376

1754.60

Waterfront Pedestrian Bridge
SA155

1754.61

CR 59 (Middle Line Road) Bridge over the Kayaderosseras: Bridge Replacement
S139

1754.62

Consaul Road (CR 9) from Balltown Road to County Line: Reconstruction
S140

1754.63

Mohawk-Hudson Bikepath Corridor Improvements
S142

1754.64

Kings Road Sidewalks
S141

1754.65

Rail Corridor Bridge Improvements
S143

1754.66

Lock 8 Bicycle and Pedestrian Access over the Dam
A377

1754.67

Village of Voorheesville Pedestrian Circulation
R196

1754.68

CR 111 (Pitts-Johns Road) Bridge over the Hoosick River: Bridge Restoration
R197

1754.69

Washington Avenue, from I-90 Exit 8 to Broadway: Sidewalk Renovation
R198

1754.70

New sidewalks on the East Side of Brookside Avenue and at the Intersection
SA158

1754.71

North Bridge at Peebles Island State Park
A378

1754.72

Tandem Lot Relocation Study
A400

1754.74

Old Ravena Road Bridge over Conrail: Bridge Replacement or Reconstruction
SA169

1754.75

CR 8 Bridge over Sacandaga Reservoir: Bridge Replacement or Rehabilitation
R200

1754.87

CR 59 over the Hoosick River: Buskirk Covered Bridge Rehabilitation
A392

1754.91

Relocation of Maxwell Road Part 2: Wolf Road Service Road
R203

1754.99

CR 40 (Plank Road) Bridge over the Poestenkill Creek: Bridge Replacement
A393

1755.02

Dunbar Hollow Bridge over the Hannacrois Creek: Bridge Reconstruction or
R202

1755.03

56 Road Bridge over Poestenkill Creek: Bridge Replacement
R199

1755.04

Simons Road Bridge over Amtrak: Bridge Replacement
R204

1755.04

CR 3 (South Schodack Road) Bridge over Conrail: Bridge Replacement
SA166

1755.05

Hans Creek Road Bridge over Hans Creek (BIN 3304270): Bridge Reconstruction
SA167

1755.05

Hans Creek Road Bridge over Hans Creek (BINs 2202800 and 2202810): Bridge
S149

1755.06

Cole Road Bridge over the Normanskill: Bridge Reconstruction
SA176

1755.16

Ralph Street Bridge over Kayderosseras Creek
A401

1755.23

CR 53 (Jericho Road) Bridge over Dowerskill: Bridge Reconstruction or
R209

1755.24

Powers Road Bridge over Poestenkill Creek: Bridge Replacement or
R208

1755.25

Cropsey Road Bridge over Poestenkill Creek: Bridge Replacement or
A408

1755.40

Old Ravena Road over Conrail; Bridge Replacement or Reconstruction
SA175

1755.41

Sand Lake Road Bridge over Sand Creek: Bridge Replacement
R219

1755.42

ITS Signal Improvements in the City of Troy
R220

1755.44

Observation Deck and Fishing Pier
A405

1755.45

Tory Cave Access Path and Indian Ladder Road
A406

1755.61

Albany County Sign Management
A407

1755.62

City of Albany Sign Management
SA89

1802.27

West Avenue, from Church Street (NY 9N) to NY 50: Intersection Improvements at
SA109

1804.42

Glenridge Road, from Maple Avenue to NY 146: Reconstruction
S120

1804.42

Glenridge Road, from Maple Avenue to NY 146: Reconstruction
A257

1804.44

Campus Bridge over NY 85: Bridge Reconstruction
A368

1804.92

NY 910E (New Scotland Road) over the Normanskill: Bridge Replacement
SA149

1804.93

Fulton Street Bridge over Old Champlain Canal: Bridge Replacement
RG59

1804.95

Culvert Repairs & Replacement on State-Owned Facilities
A367

1804.96

NY 7, from US 9 to I-787: Crack and Joint Seal
A346

1805.33

Eight Culvert Replacements on State Facilities in Albany and Rensselaer
S151

1805.46

State Bridge Painting
A322

1805.50

Wolf Road, from NY 5 to New Exit 3/4: Reconstruction
RG84

1805.53

10 State Bridge Scour Repairs
RG90

1805.59

Simplified Maintenance and Vendor In-Place Paving Set-Aside for State
RG86

1805.67

5 to 7 State Bridge Repairs
SA171

1805.69

Four Intersections, Including NY 423 at NY 4
RG85

1805.74

Armor Coating Set-Aside for State Roads
RG88

1805.77

Crack and Joint Sealing and Miscellaneous Pavement Work Set-Aside
R213

1805.84

Large Culvert Replacement on State Roads
R222

1806.25

ATIS in Rensselaer County
T17

1820.48

Transit Bus Replacement
T9

1820.50

Facility Improvements
T16

1820.55

Transit Support Vehicles
T44

1821.08

Transportation Ordinances
T51

1821.14

Transit Operations in Construction Work Zones
T11

1821.17

Passenger Facility Improvements at Various Locations
RG31

1821.44

Corridor Management Initiative
RG38

1821.62

NY 5 ITS Transit Component ("Best Bus")
RG81

1821.62

NY 5 and Wolf Road ITS Signal Component
T54

1821.63

New Rensselaer Amtrak Station
T56

1821.65

Access Transit: Capital Expenses
SA134

1821.66

Replacement Buses for Upstate Transit Northway Service
SA163

1821.70

Saratoga Springs Train Station
SA164

1821.71

Scenic Train: Saratoga Springs to North Creek
RG79

1821.72

Commuter Rail Demonstration
T6A

1824.01

Section 5310 Vehicles for Elderly and Handicapped Transportation by Private
T14A

1824.03

Non-CDTA Transit Operations Support
T32

1824.04

Leasing Tires for Buses
T65

1824.05

Shop Equipment
T52

1824.06

Fixed Route Service in Saratoga County
T6B

1824.37

STAR Buses Replacement
RG40

1932.19

Grade Crossing Safety Improvements Set-Aside
RG66

1940.99

Navigation Lights on Canal
SA156

1941.05

Mechanicville Terminal Wall Rehabilitation
SA137

1941.06

Erie Canal Concrete Docking between Lock E3 and E4: Rehabilitation
RG16

1B00.02

State Bridge Inspection Set-Aside
RG22

1B97.02

Local Bridge Inspection Set-Aside
RG67

1T00.01

Bridge Materials for State Facilities
RG27

1T05.02

Travel Demand Management
T49

1T05.09

Region-Wide Guaranteed Ride Home Program
RG78

1T05.30

Bridge Painting Set-Aside
RG87

1T05.53

Bridge Cleaning and Miscellaneous Bridge Set-Aside for State Roads
RG70

1T06.16

Interstate Signing
RG72

1T06.48

Large Culvert Replacements on State Facilities
RG15

1T06.55

Durable Pavement Markings Set-Aside
RG76

1T07.14

Safetrak Paving Set-Aside
RG39

1T07.57

ITS Set-Aside for Local Traffic Signals
RG41

1T07.58

Spot Improvements for Bicycle and Pedestrian Access Set-Aside
RG89

1T07.89

Emergency Standby Contract Set-Aside for State Roads
A309

B103

Thruway Bridge over US 9W at Milepost 140.98: Bridge Rehabilitation
A355

B106

Thruway Bridge over Krumkill Road (at Milepost 144.87): Bridge Replacement
A285

B108

Karner Road Bridge over the Thruway (Milepost 149.95): Bridge
A286

B109

Old State Road Bridge over the Thruway (Milepost 150.81): Bridge Rehabilitation
S131

B112

Thruway Bridge over Conrail (Milepost 158.98)
S133

B113

Thruway over Poentickill (Milepost 159.36)
S111

B114

Putnam Road Bridge over NYS Thruway (Milepost 159.91): Bridge Reconstruction
S118

B115

Rynex Corner Road Bridge over NYS Thruway (Milepost 167.03): Bridge
A324

B125

Thruway Berkshire Spur Ramp over The Thruway (Milepost B00.00): Bridge
R145

B130

Thruway Berkshire Spur Bridge at Milepost B1.08: Substructure Repairs
R174

B131

Castleton Bridge (Milepost B1.08): Embankment Erosion Repair
R151

B136

Thruway Berkshire Spur Interchange with US 9 (Milepost B6.58 and B6.59): Bridge
R154

B139

Thruway Berkshire Spur Bridge over NY 203 (Milepost's B8.93): Bridge Repairs
RG42

B153

Bridge Painting on NYS Thruway
S130

B154

Thruway Bridge Painting (Mileposts 158.93, 162.19 & 162.20)
RG51

B274

Retrofit to Fractured Critical Members on NYS Thruway
RG52

B281

Strengthening Low-Rated Bridges on NYS Thruway
A354

B289

Thruway Bridge over Conrail (Milepost 133.51): Bridge Reconstruction
S132

B290

Thruway Bridge over Scotch Church Road (Milepost 167.35)
RG45

B322

Chain-Link Fencing at High Priority Bridges on NYS Thruway
RG46

B327

Thruway Bridge Inspection
RG44

B336

Region-Wide Substructure Rehabilitation and Replacement on NYS Thruway
RG53

H163/H771

Mill and Fill on NYS Thruway
RG54

H219

Roadway Striping with Permanent Striping on NYS Thruway
RG57

H229

Noise Attenuation Projects on NYS Thruway
RG55

H230

Safety Upgrades on NYS Thruway
R137

H269

Thruway, Berkshire Spur from Milepost B1.6 to Milepost B6.4: Rehabilitation in
R138

H269

Thruway Interchange B-1 (at Milepost B6.58): Rehabilitate Toll Plaza
A272

H317

Thruway Interchange 22: Resurfacing
R163

H65

Thruway, from Milepost B6.4 to Milepost B18: Resurfacing
A307

H67

Thruway Safety Work and Bridge Approach Rail (Milepost 141.3 to 161.3)
RG56

H772

Rock Remediation on NYS Thruway
T36

Multiple

Contingencies, Administration and Planning for CDTA Projects
RG82

NA

Set-Aside for New Visions Contingencies for Existing Projects
RG83

NA

Set-Aside for High Priority Enhancement Projects not Funded by the Enhancement
A379

NA

Broadway & Harbor Access Project, Broadway Harbor Gateway & Corridor
A380

NA

Port of Albany Maintenance Dredging on Both Sides of the River
A381

NA

Port of Albany: Rebuild Multi-Purpose Dock on Both Sides of the River
A382

NA

Construct New Industrial Access Road
A394

NA

NYSDOT/Amtrak Rail Initiative: Livingston Avenue Bridge Rehabilitation
A395

NA

NYSDOT/Amtrak Rail Initiative: Rensselaer to Schenectady Double Track.
R205

NA

NYSDOT/Amtrak Rail Initiative: Five Remanufactured High-Speed Trainsets
R206

NA

NYSDOT/Amtrak Rail Initiative: Rensselaer Amtrak Shop Construction
R207

NA

NYSDOT/Amtrak Rail Initiative: Track Improvements in Rensselaer County
SA138

NA

Glens Falls Feeder Canal 2 & 3
SA139

NA

Glens Falls Feeder Canal Repairs
SA140

NA

Erie Canal Lock E2 Rehabilitation
SA141

NA

Erie Canal Lock 6 Rehabilitation
SA159

NA

Industrial Park Road
SA160

NA

Pedestrian Improvements on Broadway in Saratoga Springs
SA161

NA

Clifton Park Center Road: Resurfacing
SA162

NA

CR 109 (Farm to Market Road), from US 9 to NY 146: Reconstruction
SA165

NA

Rehabilitation of Lock C-5 in Northumberland
S135

NA

Erie Canal Lock 8 SW Approach Wall
S146

NA

State Street Transportation Corridor Streetscape
S147

NA

Scotch Ridge Road: Reconstruction and Realignment
S148

NA

Maple Avenue: Reconstruct and Realign "S" Curve
S150

NA

NYSDOT/Amtrak Rail Initiative: Rensselaer to Schenectady Double Track






CDTC Home Page