Project Description
Bethlehem Sidewalks Sidewalks at Bethlehem High School, Glenmont Road & 3 Connections to Existing Sidewalks Federal funding is 80%, with a maximum of $.022M.
Sidewalks at Bethlehem High School, Glenmont Road & 3 Connections to Existing Sidewalks Federal funding is 80%, with a maximum of $.022M.
Federal funding is 80%, with a maximum of $.022M.
Funding by Federal Fiscal Year (10/1 to 9/30)
Fund Source
1998-99
1999-00
2000-01
2001-02
2002-03
2003-04
Post '04
Funding Totals by Phase
Phase
Five-Year Funding
Six-Year Funding
Construction
Total
Other Information
TIP Number: A410 Letting Date: FFY '00
Letting Date: FFY '00
PIN: NA Func. Class: NA
Func. Class: NA
Project Type: Bike/Ped Length: NA
Length: NA
Jurisdiction: Town Plan Ref.: NV
Plan Ref.: NV
Location: Bethlehem No EIS Required
No EIS Required
Implementer: Town Air Quality: Exempt
Air Quality: Exempt