National Hwy Performance Program 167.635 159.821 5.837 42.557 37.342 24.213 26.960 28.749 8.104
NHPP Statewide 41.600 41.600 8.400 0 41.600 0 0 0 0
STP Flexible 65.670 47.668 4.954 6.629 9.592 15.734 8.672 7.041 43.118
STP Flexible Statewide 5.200 5.200 0 0.210 0.240 4.750 0 0 0
STP Flexible Statewide (%20 State) 6.769 6.769 0 0 5.060 1.709 0 0 0
STP Urban 49.792 60.850 15.006 17.108 11.571 15.650 11.708 4.813 0
STP Urban Statewide 19.500 19.500 0 0.350 0.150 19.000 0 0 0
HSIP Rail 5.399 5.399 0.666 1.175 0.150 0.144 3.930 0 0
HSIP Highway 13.682 8.604 0.206 1.909 1.618 4.411 0.333 0.333 5.210
HSIP Highway Statewide 7.410 7.410 0.050 5.000 0.126 1.184 1.100 0 0
HSIP Highway Statewide 100% Federal 8.128 8.128 0 4.424 0.815 2.889 0 0 0
STP Enhancements 1.654 1.654 0.226 1.210 0.444 0 0 0 0
STP NFA Bridges 5.197 6.502 1.679 2.171 2.874 0.726 0.731 0 0.721
STP NFA Bridges Statewide 2.338 2.338 0 0.335 1.051 0.952 0 0 0
Federal Demonstration 11.329 11.329 5.900 0.473 2.600 8.256 0 0 0
Miscellaneous Federal Aid 0.041 0.041 0 0 0.041 0 0 0 0
Congestion Mitigation/Air Quality 11.204 11.204 0 2.500 1.489 3.168 4.047 0 0
Surface Transportation Block Grant 0.235 0.235 0 0 0.042 0.193 0 0 0
Transportation Alternatives Program 6.817 6.817 2.075 1.487 2.197 3.133 0 0 0
Section 5339 9.121 9.121 0 2.721 2.022 1.427 1.462 1.489 0
Section 5307 79.354 79.354 16.206 16.027 18.079 14.773 15.080 15.395 0
Section 5307 Associated Transit Imp. 0.980 0.980 0.235 0.180 0.200 0.200 0.200 0.200 0
Section 5307 For Saratoga Springs 6.763 6.763 1.300 1.279 1.418 1.328 1.355 1.383 0
Section 5310 For Saratoga Springs 0 0 0.124 0 0 0 0 0 0
Section 5310 2.700 2.700 0.774 0.540 0.540 0.540 0.540 0.540 0
Subtotal (Federal Including Match) 528.518 509.987 63.638 108.285 141.261 124.380 76.118 59.943 57.153

NYS Office of Parks & Recreation 0.500 0.500 0 0 0.500 0 0 0 0
100% State Funds 0.194 0.194 0 0.194 0 0 0 0 0
State Dedicated Fund 0.656 0.656 0.405 0.310 0.346 0 0 0 0
Local Funds 13.544 13.544 5.233 11.885 1.136 0.523 0 0 2.835
Modernization and Enhancement Program 10.362 10.362 0 0 10.362 0 0 0 0
Accelerated Transit Capital Program 3.639 3.639 0 0 3.639 0 0 0 0
Subtotal (Other State and Local) 28.895 28.895 5.638 12.389 15.983 0.523 0 0 2.835
Total 557.413 538.882 69.276 120.674 157.244 124.903 76.118 59.943 59.988

All federal-aid funds include any required non-federal share, usually 10% or 20%. The State provides the non-federal share for all projects under state jurisdiction. For projects not under state jurisdiction, the 20% match may be required from the agency of jurisdiction. However, the State has traditionally supplied 3/4 of the non-federal share for most non-state highway projects through Marchiselli funds and 1/2 of the non-federal share of most transit projects. Funding shown as `Local' is beyond that required to match federal funds.

If funding availability was unknown at the TIP update, it was assumed to be equal to the five-year total.