Address : One Park Place Albany, NY 12205-1606

Phone : (518) 458-2161 | Email: cdtc@cdtcmpo.org

2016-21 TIP TIP Number S242 (PIN 1760.42) < TIP # > | < PIN >
All funds are in matched millions of dollars.
This listing includes the amendment for this project of 03/17 .
This project is based on the project fact sheet used in the 2016-21 TIP Update.

Project Listings |  Interactive Map |  Previous Online TIP's

Project Description

Broadway from 0.12 miles south of Weaver St. to Fourth Street: Mill and Fill

Includes upgrading 8 crossings to ADA guidelines




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source 2015-16
(Oblig'd)
2016-17
(1st Year)
2017-18
(2nd Year)
2018-19
(3rd Year)
2019-20
(4th Year)
2020-21
(5th Year)
Post '21

STP-Urb.

0 0 0 0.060 P 1.089 C 0 0

STP-Urb.

0 0 0 0.060 D 0 0 0

Total

0 0 0 0.120 1.089 0 0



Funding Totals by Phase

Phase Five-Year Funding (2016-17 thru 2020-21) Six-Year Funding (2015-16 thru 2020-21)

Engineering

0.120

0.120

Construction

1.089

1.089

Total

1.209

1.209




Other Information

TIP Number: S242 First TIP: 2016-21
PIN: 1760.42 Func. Class: UmA
Project Type: R&P Length: 2500 ft
Jurisdiction: City Plan Ref.: NV
Location: Schenectady No EIS Required
Implementer: City Air Quality: Exempt





CDTC Home Page