Address : One Park Place Albany, NY 12205-1606

Phone : (518) 458-2161 | Email: cdtc@cdtcmpo.org

TIP Number SA307 (PIN 1760.86) < TIP # > | < PIN >
All funds are in matched millions of dollars.
This listing includes the amendment for this project of 06/17 .

Project Listings |  Clickable Maps |  Previous Online TIP's

Project Description

Saratoga Greenbelt Downtown Connector

The project begins at Lake Avenue, extends along High Rock and Excelsior Avenues and connects to the bicycle- pedestrian bridge I-87 Exit 15.

New sidewalks, multi-use trails, bike lanes, benches, and LED lighting. The project will address landscape and stormwater improvements.

These funds are capped. C was deferred one year.




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source 2015-16
(Oblig'd)
2016-17
(1st Year)
2017-18
(2nd Year)
2018-19
(3rd Year)
2019-20
(4th Year)
2020-21
(5th Year)
Post '21

Local

0 0 0 0.273 C 0 0 0

TAP

0 0 0.091 D 0 0 0 0

TAP

0 0 0 1.733 C 0 0 0

TAP

0 0 0.091 P 0 0 0 0

Total

0 0 0.182 2.006 0 0 0



Funding Totals by Phase

Phase Five-Year Funding (2016-17 thru 2020-21) Six-Year Funding (2015-16 thru 2020-21)

Engineering

0.182

0.182

Construction

2.006

2.006

Total

2.188

2.188




Other Information

TIP Number: SA307 First TIP: 2016-21
PIN: 1760.86 Func. Class: NA
Project Type: Bike/Ped Length: 1.66 mi
Jurisdiction: City Plan Ref.: NV
Location: Saratoga Springs No EIS Required
Implementer: City Air Quality: Exempt





CDTC Home Page