Address : One Park Place Albany, NY 12205-1606

Phone : (518) 458-2161 | Email: cdtc@cdtcmpo.org

2016-21 TIP TIP Number SA296 (PIN 1760.39) < TIP # > | < PIN >
All funds are in matched millions of dollars.
This listing includes the amendment for this project of 06/17 .
This project is based on the project fact sheet used in the 2016-21 TIP Update.

Project Listings |  Interactive Map |  Previous Online TIP's

Project Description

Zim Smith Southern Trail Extension, From Coons Crossing to Elizabeth St. Ext.

Includes paving the existing unpaved trail from Round Lake to Coons Crossing, a pavement overlay of the existing Round Lake parking lot, a new paved parking lot just beyond Coons Crossing, and a new paved parking lot at the Mechanicville school.

Related to projects SA195 & SA292 . These federal funds are capped. State OPR funds are 50% local match. Project is in Halfmoon & Mechanicville




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source 2015-16
(Oblig'd)
2016-17
(1st Year)
2017-18
(2nd Year)
2018-19
(3rd Year)
2019-20
(4th Year)
2020-21
(5th Year)
Post '21

Flex-100

0 0 4.944 C 0 0 0 0

StateOPR

0 0 0.500 C 0 0 0 0

Local

0 0.100 D 0.024 I 0 0 0 0

Local

0 0 0.097 R 0 0 0 0

Local

0 0.135 P 0.621 C 0 0 0 0

Total

0 0.235 6.186 0 0 0 0



Funding Totals by Phase

Phase Five-Year Funding (2016-17 thru 2020-21) Six-Year Funding (2015-16 thru 2020-21)

Engineering

0.235

0.235

Right-of-Way

0.121

0.121

Construction

6.065

6.065

Total

6.421

6.421




Other Information

TIP Number: SA296 First TIP: 2016-21
PIN: 1760.39 Func. Class: NA
Project Type: Bike/Ped Length: 3.0 mi
Jurisdiction: County Plan Ref.: NV
Location: Halfmoon, Mechanicville No EIS Required
Implementer: County Air Quality: Exempt





CDTC Home Page