Capital District Transportation Committee
Transportation Improvement Program
2016-21 Saratoga County Project Listings

All Funding is in Matched Millions of Dollars - Last Updated 01-19-2018
TIP #
PIN or ID#
Proj Type
First TIP
Project Description
Location, Jurisdiction, Length
"
Fund
Source
5-Year
Total
Program Years (Federal Fiscal Years)
Phase Com-
mitted
2015-16
1st Year
2016-17
2nd Year
2017-18
3rd Year
2018-19
4th Year
2019-20
5th Year
2020-21
Post
2021
Other Notes
Capital District Transportation Committee Transportation Improvement Program
2016-21 Saratoga County Project Listings

All Funding is in Matched Millions of Dollars - Last Updated 01-19-2018

TIP #
PIN or ID#
Proj Type
First TIP
Project Description
Location, Jurisdiction, Length
"
Fund
Source
5-Year
Total
Program Years (Federal Fiscal Years)
Phase Com-
mitted
2015-16
1st Year
2016-17
2nd Year
2017-18
3rd Year
2018-19
4th Year
2019-20
5th Year
2020-21
Post
2021
Other Notes
SA134


1821.66
CapitalVeh
1997-02
Replacement Buses for CDTA and Northway Express Service

This is for three buses in 2009-10.

Funding was changed to STP-Flex upon CMAQ termination.
Regional, County
STP-Flex   2.750 V
Total               2.750   
Vehicles               2.750   
Agency: CDTA
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA214
1722.05
Resurface
2005-10
I-87, Exit 12 to Exit 15: Pavement Repair

Isolated repairs and pavement joints.

Funded from RG136.
Multiple, State
NHPP 2.750 .286 D 2.750 C
Total 2.750 .286    2.750             
Detailed Des   .286               
Construct'n 2.750   2.750             
Agency: NYSDOT
Func. Class: UI
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA244




1089.64
Bridge R/R
2007-12
US 4 over the Hudson River: Element Specific Bridge Repair

BIN: 4000950

Related Project: SA205 from the 2003-08 TIP.

R246 is the other half of this project.
Waterford (V), State
NHPP 2.200 .200 D 2.200 C
Total 2.200 .200    2.200             
Detailed Des   .200               
Construct'n 2.200   2.200             
Agency: NYSDOT
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA258



1759.16
Safety
2010-15
North Line Road/Old Post Road/Malta Avenue Intersection

Reduce 3 intersections to a single roundabout with new curbs, sidewalks, curb ramps, crosswalks, landscaping, new storm water drainage system and relocation of utility poles
Malta, County
Safety   2.612 C
Safety .088 R
Safety .300 P
Safety .300 D
Total               3.300   
Construct'n               2.612   
ROW Aquis'n               .088   
Prelim. Des.               .300   
Detailed Des               .300   
Agency: Town
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA279










1759.70
Bike/Ped
2013-18
North Central Avenue Pedestrian Safety Project

From Saratoga Avenue and Frances Street including 50 feet west on Saratoga Avenue and 100 feet east on Frances Street.

Sidewalks, crosswalks, curb ramps, drainage drainage piping, lights, Street trees & benches

All funds rolled over. D & C rolled over again. $10K moved from C to P & D.
Mechanicville, City, 1225 ft
STP-Enh. 0.500 .056 P .048 D
STP-Enh. .396 C
Total 0.500   .056    .444           
Prelim. Des. 0.056   .056             
Detailed Des 0.048     .048           
Construct'n 0.396     .396           
Agency: City
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA280















1759.83
Traff Op'n
2013-18
Geyser Road (CR 43)

Traffic Operations & Bicycle and Pedestrian Trail

Traffic signal at West Entrance to Spa State Park, a left turn lane on the Geyser Road approach to NY 50, Avenue of the Pines and NY 50 Intersection Improvements

Part of this project was funded via RG39.

Related to SA272.

Shared jurisdiction: City and County

This project now includes SA290 & SA301. C & R rolled-over.
Saratoga Springs, Multiple
STP-Urb. 1.117 .205 D .912 C
Local 0.110 .150 P .035 R
Local .030 I  .075 D
TAP 2.000 .080 R
TAP 1.920 C
Total 3.227 .180    .315    2.912           
Detailed Des 0.280   .280             
Construct'n 2.832     2.832           
Prelim. Des.   .150               
ROW Aquis'n 0.115   .035    .080           
ROW Incid.   .030               
Agency: City
Func. Class: Mult
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA281










1759.84
Traff Op'n
2013-18
Sitterly Road at Woodin Road and Crossings Boulevard

STP-Flex pays for the Traffic signal only. Replace existing signals with updated, interconnected signal hardware.

Flex-100 funding pays for additional turn lane, started as PIN 1760.54, and all match is paid for by NYS.

This project was funded via RG39. P & D rolled over. NYSDOT moved $103K from D to other phases.
Multiple, Multiple
STP-Flex 0.128 .086 P
STP-Flex .013 I 
STP-Flex .029 D
Flex-100 1.825 .010 P
Flex-100 .005 I 
Flex-100 .039 D
Flex-100 .062 R 1.709 C
Total 1.953     .244    1.709         
Prelim. Des. 0.096     .096           
ROW Incid. 0.018     .018           
Detailed Des 0.068     .068           
ROW Aquis'n 0.062     .062           
Construct'n 1.709       1.709         
Agency: Town
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA282
1759.85
Bike/Ped
2013-18
Malta "Share the Road" Signage



Malta, Town
STP-Flex   .015 C
Local   .003 P
Total   .018               
Construct'n   .015               
Prelim. Des.   .003               
Agency: Town
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA283

1759.86
R&P
2013-18
Sitterly Road from US 9 to Clifton Park Town Line : Mill & Fill

This project was funded as a drawdown on RG125 and rolled over.

Halfmoon, Town, 0.82 clm
STP-Urb.   .035 P
STP-Urb. .030 D
STP-Urb. .360 C
Total   .425               
Prelim. Des.   .035               
Detailed Des   .030               
Construct'n   .360               
Agency: Town
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA290

1760.11
Bike/Ped
2013-18
Geyser Road Spa State Park Bicycle and Pedestrian Trail

Related to SA272, SA280 & SA301.

This project is now part of SA280.
Saratoga Springs, City
Total                
Agency: City
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA292





1760.14
BridgeMisc
2013-18
Zim Smith Trail Bike/Ped Bridge Over US 9: Element Specific Bridge Repair

BIN 7005610

This is a drawdown on RG126. Related to projects SA195 & SA296.

C deffered one year.
Clifton Park, County
NHPP 0.677 .005 P .677 C
NHPP .045 D
Total 0.677 .050    .677             
Prelim. Des.   .005               
Construct'n 0.677   .677             
Detailed Des   .045               
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA295




1760.38
Bike/Ped
2016-21
Pruyn Hill Pedestrian Safety, Phase II

Phase I was SA274 in the 2013-18 TIP

Includes new sidewalk, delineated crosswalks, embedded detectable pads Connects the existing sidewalks at Prospect St. & Mechanicville School campus
Halfmoon, County, 1200 ft
STP-Urb. 0.126 .126 C
Total 0.126   .126             
Construct'n 0.126   .126             
Agency: Town
Func. Class: UMC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA296





1760.39
Bike/Ped
2016-21
Zim Smith Southern Trail Extension, From Coons Crossing to Elizabeth St. Ext.

Related to projects SA195 & SA292. These federal funds are capped. State OPR funds are 50% local match. Project is in Halfmoon & Mechanicville



Multiple, County, 3.0 mi
Flex-100 4.944 4.944 C
StateOPR 0.500 .500 C
Local 0.977 .100 D .024 I 
Local .097 R
Local .135 P .621 C
Total 6.421   .235    6.186           
Construct'n 6.065     6.065           
Detailed Des 0.100   .100             
ROW Incid. 0.024     .024           
ROW Aquis'n 0.097     .097           
Prelim. Des. 0.135   .135             
Agency: County
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA297


1760.46
Br.Replace
2016-21
Ashdown Rd. Bridge over the DHRR: Replacement

I phase added by DOT. Funds came from P

BIN 2202570
Clifton Park, County
STP-Flex 1.587 .121 P .140 D 1.307 C
STP-Flex .019 I 
Total 1.587   .140    .140      1.307       
Prelim. Des. 0.121   .121             
Detailed Des 0.140     .140           
Construct'n 1.307         1.307       
ROW Incid. 0.019   .019             
Agency: County
Func. Class: UMC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA300




1722.44
Br.Replace
2016-21
East High Street & Crescent Avenue over I-87: Bridge Replacement

East High Street over I-87 BIN 1033300 Crescent Avenue over I-87 BIN 1033340

Bridges are in Malta & Saratoga Springs

D was reduced by $.450M.
Multiple, State
NHPP 16.095 .050 I 
NHPP .450 R 15.745 C
NHPP .400 P .350 D
Total 16.095 .900    16.095             
ROW Incid.   .050               
ROW Aquis'n   .450               
Construct'n 15.745   15.745             
Prelim. Des.   .400               
Detailed Des 0.350   .350             
Agency: NYSDOT
Func. Class: Mult
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA301






1760.47
Traff Op'n
2016-21
Geyser Rd. (CR 43), Avenue of the Pines and NY 50 Intersection Improvements

Related to SA272, SA280 & SA290.

Includes a left turn lane on the Geyser Rd. approach to NY 50.

Shared jurisdiction: City and County

This project is now part of SA280.
Saratoga Springs, Multiple
Total                
Agency: City
Func. Class: Mult
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA302
1760.56
Br.Replace
2016-21
CR 13 (Barkersville Fayville Road) over Cadman Creek: Bridge Replacement

BIN 3304740

Providence, County
STP-Off 0.891 .080 P .731 C
STP-Off .080 D
Total 0.891     .160      .731       
Prelim. Des. 0.080     .080           
Construct'n 0.731         .731       
Detailed Des 0.080     .080           
Agency: County
Func. Class: UL
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA303
1933.37
Safety
2013-18
Grade Crossing Upgrade: Coons Crossing Road at CP Rail Crossing

Install new active warning devices, lights & gates
Halfmoon, Town
Rail 0.250 .025 P
Rail .225 C
Local 0.085 .085 C
Total 0.335   .335             
Prelim. Des. 0.025   .025             
Construct'n 0.310   .310             
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA304


1085.43
Safety
2016-21
NY 146/NY 146A Intersection: Safety Improvements

Scope will be determined during the design process


Clifton Park, State
Safety 3.825 .250 P .250 D 2.975 C
Safety .050 I  .300 R
Total 3.825   .300    .550    2.975         
Prelim. Des. 0.250   .250             
Detailed Des 0.250     .250           
Construct'n 2.975       2.975         
ROW Incid. 0.050   .050             
ROW Aquis'n 0.300     .300           
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA305



1760.67
Br.Recon'n
2016-21
CR 21 (Middle Grove Road) over Kayaderosseras Creek: Rehabilitation

BIN 3304160

Capped at the dollar amounts shown. The 20% local match is 5% local and 15% toll credits. DOT moved $22K from D to P.
Greenfield, County
STPOffNY 1.188 .098 P 1.036 C
STPOffNY .054 D
Total 1.188   .152    1.036           
Prelim. Des. 0.098   .098             
Construct'n 1.036     1.036           
Detailed Des 0.054   .054             
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA306







1760.82
Bike/Ped
2016-21
Moe Road Multi-Use Path

This project will close an existing gap on the Moe Road Multi-Use Path by constructing an extension that will connect Okte Elementary School to the intersection with Sugarbush Road.

P phase was paid for by the Town several years ago.

These funds are capped.
Clifton Park, Town
CMAQ 1.061 .071 D .883 C
CMAQ .100 R
CMAQ .007 I 
Total 1.061     .178    .883         
Detailed Des 0.071     .071           
Construct'n 0.883       .883         
ROW Aquis'n 0.100     .100           
ROW Incid. 0.007     .007           
Agency: Town
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA307









1760.86
Bike/Ped
2016-21
Saratoga Greenbelt Downtown Connector

The project begins at Lake Avenue, extends along High Rock and Excelsior Avenues and connects to the bicycle- pedestrian bridge I-87 Exit 15.

New sidewalks, multi-use trails, bike lanes, benches, and LED lighting. The project will address landscape and stormwater improvements.

These funds are capped. C was deferred one year.
Saratoga Springs, City, 1.66 mi
Local 0.273 .273 C
TAP 1.915 .091 D
TAP 1.733 C
TAP .091 P
Total 2.188     .182    2.006         
Construct'n 2.006       2.006         
Detailed Des 0.091     .091           
Prelim. Des. 0.091     .091           
Agency: City
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA308


1933.45
Safety
2016-21
Ashdown Road Grade Crossing Signal Upgrade

Installation of Automatic Gates, Flashing Lights and Pavement Repair

DOT deferred P one year.
Clifton Park, Town
Rail 0.315 .025 P .290 C
Total 0.315     .025      .290       
Prelim. Des. 0.025     .025           
Construct'n 0.290         .290       
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA309


1933.46
Safety
2016-21
Blue Barns Road (CR 110) Pan AM Railways Grade Crossing Signal Upgrade

Installation of Automatic Gates, Flashing Lights and Pavement Repair

DOT deferred P one year.
Clifton Park, Town
Rail 0.390 .025 P .365 C
Total 0.390     .025      .365       
Prelim. Des. 0.025     .025           
Construct'n 0.365         .365       
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt