S143
|
1754.66 |
Bike/Ped |
1997-02 |
|
Bicycle and Pedestrian Path Near Lock 8
This project provides a bike/ped path connecting Charles Street with Maalwyck Park and the New York State Fishing Access Site at Lock 8.
As of 5/4/11 this project is not capped.
Funding was changed to STP-Flex upon CMAQ termination.
|
Glenville, Town, .75 miles |
|
STP-Flex |
  |
|
|
|
|
|
|
.180 C |
Total |
  |
  |
  |
  |
  |
  |
  |
.180    |
Construct'n |
  |
  |
  |
  |
  |
  |
  |
.180    |
|
Agency: Town
Func. Class: NA
Plan Ref.: Canal
No EIS Required
AQ Status: Exempt
|
|
|
S167 |
1755.33 |
Bridge R/R |
2003-08 |
|
Oak Street over CSX: Element Specific Bridge Repair
|
Schenectady, City |
|
STP-Urb. |
1.750 |
|
1.750 C |
|
|
|
|
|
Local |
0.291 |
|
.291 C |
|
|
|
|
|
Total |
2.041 |
  |
2.041    |
  |
  |
  |
  |
  |
Construct'n |
2.041 |
  |
2.041    |
  |
  |
  |
  |
  |
|
Agency: City
Func. Class: UC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
S170
|
1822.85 |
CapitalFac |
2003-08 |
|
Western Gateway Transportation Center
Purchase Amtrak Station and construct a new intermodal facility.
The federal portion of the STP-Urb is 80%, with a maximum of $3.600M in federal funds.
|
Schenectady, City |
|
STP-Urb. |
  |
4.500 F |
|
|
|
|
|
|
Demo. |
  |
5.900 F |
|
|
|
|
|
|
Local |
  |
4.200 F |
|
|
|
|
|
|
Total |
  |
14.600    |
  |
  |
  |
  |
  |
  |
Facilities |
  |
14.600    |
  |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: NA
Plan Ref.: Multimodal
No EIS Required
AQ Status: Exempt
|
|
|
S204
|
1758.95 |
Bridge R/R |
2010-15 |
|
Kings Road (CR 65) over CSX: Bridge Replacement
DOT added a total of $20K to phases in 2017-18. R rolled over.
Includes shoulders for bikes.
Bin 2203130
|
Schenectady, City |
|
STP-Urb. |
5.873 |
|
|
.012 I  |
|
|
|
|
STP-Urb. |
|
|
|
.293 D |
.008 R |
5.320 C |
|
|
STP-Urb. |
|
|
|
.240 P |
|
|
|
|
Total |
5.873 |
  |
  |
.545    |
.008    |
5.320    |
  |
  |
ROW Incid. |
0.012 |
  |
  |
.012    |
  |
  |
  |
  |
Detailed Des |
0.293 |
  |
  |
.293    |
  |
  |
  |
  |
ROW Aquis'n |
0.008 |
  |
  |
  |
.008    |
  |
  |
  |
Construct'n |
5.320 |
  |
  |
  |
  |
5.320    |
  |
  |
Prelim. Des. |
0.240 |
  |
  |
.240    |
  |
  |
  |
  |
|
Agency: City
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
S206
|
1758.89 |
Bridge R/R |
2010-15 |
|
Alplaus Avenue Bridge over Alplaus Kill: Element Specific Bridge Repair
Includes sidewalks, repair/update bridge rails, girders, bearings, joints, drainage pipes and curbing. Repave approaches to Mohawk Avenue and Brookside Avenue, if consistent with element specific bridge repair
Construction was funded from RG126
|
Glenville, County |
|
STP-Off |
  |
1.460 C |
|
|
|
|
|
|
Total |
  |
1.460    |
  |
  |
  |
  |
  |
  |
Construct'n |
  |
1.460    |
  |
  |
  |
  |
  |
  |
|
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
S216
|
1759.88 |
Bike/Ped |
2013-18 |
|
Mohawk Hudson Bike Trail Bollard/Gate Retrofit
13 locations along the rail trail
This project was funded as a drawdown on RG103.
|
Rotterdam, County |
|
STP-Flex |
  |
.125 C |
|
|
|
|
|
|
Total |
  |
.125    |
  |
  |
  |
  |
  |
  |
Construct'n |
  |
.125    |
  |
  |
  |
  |
  |
  |
|
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
S217
|
1759.89 |
Bike/Ped |
2013-18 |
|
Flower Hill Multi-Use Path Connection
Flower Hill cul-de-sac to Mohawk Hudson Bike-Hike Trail via Rosendale Road
This project was originally funded as a drawdown on RG103 and is capped. C rolled-over.
|
Niskayuna, Town, 1500 ft |
|
STP-Flex |
0.516 |
.007 I  |
.516 C |
|
|
|
|
|
STP-Flex |
|
.006 R |
|
|
|
|
|
|
Local |
0.092 |
|
.092 C |
|
|
|
|
|
Total |
0.608 |
.013    |
.608    |
  |
  |
  |
  |
  |
ROW Incid. |
  |
.007    |
  |
  |
  |
  |
  |
  |
Construct'n |
0.608 |
  |
.608    |
  |
  |
  |
  |
  |
ROW Aquis'n |
  |
.006    |
  |
  |
  |
  |
  |
  |
|
Agency: Town
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
S218
|
1759.90 |
Bike/Ped |
2013-18 |
|
Niskayuna Soccer Fields Multi-Use Path Connection
Zenner Road to Mohawk Hudson Bike-Hike Trail
Construct an asphalt multi-use path. Some minor signage work is included.
This project was funded as a drawdown on RG103 & cost increased by DOT.
|
Niskayuna, Town, 1200 ft |
|
STP-Flex |
  |
.156 C |
|
|
|
|
|
|
Total |
  |
.156    |
  |
  |
  |
  |
  |
  |
Construct'n |
  |
.156    |
  |
  |
  |
  |
  |
  |
|
Agency: Town
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
S219
|
1759.91 |
Bike/Ped |
2013-18 |
|
Helderberg Avenue Sidewalks
1) Reconstruct 2,800 ft of non-standard sidewalk on the west side of Helderberg Avenue
2) Construct 800 ft of new sidewalk on the east side of Helderberg Avenue from Morning Glory Drive to existing mid-block crossing at which a flashing beacon will be installed
This project was funded as a drawdown on RG103.
|
Rotterdam, County, 3600 ft |
|
STP-Flex |
  |
.500 C |
|
|
|
|
|
|
Total |
  |
.500    |
  |
  |
  |
  |
  |
  |
Construct'n |
  |
.500    |
  |
  |
  |
  |
  |
  |
|
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
Schenectady County Pavement Preservation
Consaul Road (CR 9) from Balltown Road to the Town of Colonie Line: Hot-in- Place Recycling
Aqueduct Road (CR 10) from Balltown Road (NY 146) to the Schenectady City Line: Mill & Fill
This project includes S222.
Includes crosswalks
This project was funded as a drawdown on RG125.
|
Niskayuna, County, 0.88 clm |
|
STP-Urb. |
  |
1.120 C |
|
|
|
|
|
|
Total |
  |
1.120    |
  |
  |
  |
  |
  |
  |
Construct'n |
  |
1.120    |
  |
  |
  |
  |
  |
  |
|
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
Aqueduct Road (CR 10) from Balltown Road (NY 146) to the Schenectady City Line: Mill & Fill
Includes crosswalks
This project was funded as a drawdown on RG125 and later combined with S221.
|
Niskayuna, County, 1.65 clm |
|
Total |
  |
  |
  |
  |
  |
  |
  |
  |
|
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
Schenectady City Pavement Preservation
Guilderland Avenue from Broadway to Schenectady City Line: Mill & Fill
Broadway, State Street to Millard Street: Mill & Fill
Includes crosswalks, ADA ramps & ped signals
This project was funded as a drawdown on RG125. $15K of P and $27K of D (Safety) was moved to C.
|
Schenectady, City, 0.80 clm |
|
STP-Urb. |
1.050 |
.093 P |
|
1.050 C |
|
|
|
|
STP-Urb. |
|
.087 D |
|
|
|
|
|
|
Safety |
0.470 |
|
|
.026 D |
|
|
|
|
Safety |
|
|
|
.444 C |
|
|
|
|
Total |
1.520 |
.180    |
  |
1.520    |
  |
  |
  |
  |
Prelim. Des. |
  |
.093    |
  |
  |
  |
  |
  |
  |
Construct'n |
1.494 |
  |
  |
1.494    |
  |
  |
  |
  |
Detailed Des |
0.026 |
.087    |
  |
.026    |
  |
  |
  |
  |
|
Agency: City
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
S228
|
1933.24 |
Safety |
2013-18 |
|
Grade Crossing Upgrade: Alplaus Avenue (CR 16)/CP Rail
Installation of new automatic flashing lights and gates
C was increased abd rolled over
|
Glenville, Town, NA |
|
Rail |
0.425 |
|
.425 C |
|
|
|
|
|
Total |
0.425 |
  |
.425    |
  |
  |
  |
  |
  |
Construct'n |
0.425 |
  |
.425    |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
S229
|
1085.33 |
Safety |
2013-18 |
|
Hamburg Street (NY 146) from roundabout to the Sch'dy City Line: Safety Improvements
Includes installing a median turning lane and sidewalks and intersection improvements.
The local funding is for sanitary system.
|
Rotterdam, State |
|
NHPP |
4.900 |
.250 D |
|
|
|
|
|
|
NHPP |
|
.964 R |
4.900 C |
|
|
|
|
|
Safe-NY |
5.000 |
|
5.000 C |
|
|
|
|
|
SDF |
  |
.275 I  |
|
|
|
|
|
|
Local |
3.382 |
|
3.382 C |
|
|
|
|
|
Total |
13.282 |
1.489    |
13.282    |
  |
  |
  |
  |
  |
Detailed Des |
  |
.250    |
  |
  |
  |
  |
  |
  |
ROW Aquis'n |
  |
.964    |
  |
  |
  |
  |
  |
  |
Construct'n |
13.282 |
  |
13.282    |
  |
  |
  |
  |
  |
ROW Incid. |
  |
.275    |
  |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
S231
|
1760.09 |
Bike/Ped |
2013-18 |
|
Central Park Downtown Trail Connection
Construction of a new Bike-Ped Trail from Central Park to Downtown.
D rolledover.
|
Schenectady, Town |
|
TAP |
1.302 |
.075 P |
.100 D |
|
|
|
|
|
TAP |
|
|
1.202 C |
|
|
|
|
|
Total |
1.302 |
.075    |
1.302    |
  |
  |
  |
  |
  |
Prelim. Des. |
  |
.075    |
  |
  |
  |
  |
  |
  |
Detailed Des |
0.100 |
  |
.100    |
  |
  |
  |
  |
  |
Construct'n |
1.202 |
  |
1.202    |
  |
  |
  |
  |
  |
|
Agency: City
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
S235
|
1760.16 |
Bridge R/R |
2013-18 |
|
Duanesburg Churches Road over South Chuctanunda Creek: Element Specific Bridge Repair
BIN 3304880
This is a drawdown on RG126. NYSDOT added I & R with funds from D.
|
Duanesburg, County |
|
STP-Flex |
0.486 |
.078 P |
.003 R |
|
|
|
|
|
STP-Flex |
|
.030 D |
.483 C |
|
|
|
|
|
STP-Flex |
|
.006 I  |
|
|
|
|
|
|
Total |
0.486 |
.114    |
.486    |
  |
  |
  |
  |
  |
Prelim. Des. |
  |
.078    |
  |
  |
  |
  |
  |
  |
ROW Aquis'n |
0.003 |
  |
.003    |
  |
  |
  |
  |
  |
Detailed Des |
  |
.030    |
  |
  |
  |
  |
  |
  |
Construct'n |
0.483 |
  |
.483    |
  |
  |
  |
  |
  |
ROW Incid. |
  |
.006    |
  |
  |
  |
  |
  |
  |
|
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
S236
|
1760.15 |
Bridge R/R |
2013-18 |
|
Schenectady Bridges: Element Specific Bridge Repair & Removals
1) Repair Altamont Avenue Bridge over CSX/AMTRAK, BIN 2203120
2) Remove Pedestrian Bridge at GE over the Big Circle, BIN 2256670
3) Remove Pedestrian Bridge at GE over I-890 X, BIN 2256680
These are one project and were a drawdown on RG126.
|
Schenectady, City |
|
NHPP |
2.008 |
|
.058 P |
.010 P |
|
|
|
|
NHPP |
|
|
|
.030 D |
|
|
|
|
NHPP |
|
|
.060 D |
1.850 C |
|
|
|
|
Total |
2.008 |
  |
.118    |
1.890    |
  |
  |
  |
  |
Prelim. Des. |
0.068 |
  |
.058    |
.010    |
  |
  |
  |
  |
Detailed Des |
0.090 |
  |
.060    |
.030    |
  |
  |
  |
  |
Construct'n |
1.850 |
  |
  |
1.850    |
  |
  |
  |
  |
|
Agency: City
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
S237
|
1933.34 |
Safety |
2013-18 |
|
Grade Crossing Upgrade: Maxon Road/CP Rail
Upgrade active warning devices.
The local funding is from MetroPlex.
|
Schenectady, City, NA |
|
Rail |
  |
.025 P |
|
|
|
|
|
|
Rail |
|
.225 C |
|
|
|
|
|
|
Local |
  |
.080 C |
|
|
|
|
|
|
Total |
  |
.330    |
  |
  |
  |
  |
  |
  |
Prelim. Des. |
  |
.025    |
  |
  |
  |
  |
  |
  |
Construct'n |
  |
.305    |
  |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
S238
|
1810.26 |
Bridge R/R |
2016-21 |
|
NY 911F (Freemans Bridge) over the Mohawk River/Erie Canal, Rehabilitation
The bridge will include a multi-use path.
BIN 4050330
DOT deferred C one year.
|
Glenville, State |
|
NHPP |
3.200 |
|
|
|
.100 D |
3.100 C |
|
|
STP-Urb. |
0.100 |
|
.100 P |
|
|
|
|
|
Total |
3.300 |
  |
.100    |
  |
.100    |
3.100    |
  |
  |
Detailed Des |
0.100 |
  |
  |
  |
.100    |
  |
  |
  |
Construct'n |
3.100 |
  |
  |
  |
  |
3.100    |
  |
  |
Prelim. Des. |
0.100 |
  |
.100    |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
S239 |
1525.37 |
Bridge R/R |
2016-21 |
|
Michigan Avenue Bridge over I-890: Element Specific Repairs
BIN 1049970
|
Schenectady, State |
|
STP-Urb. |
4.242 |
.500 D |
4.242 C |
|
|
|
|
|
Total |
4.242 |
.500    |
4.242    |
  |
  |
  |
  |
  |
Detailed Des |
  |
.500    |
  |
  |
  |
  |
  |
  |
Construct'n |
4.242 |
  |
4.242    |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
Sunnyside Road from Freemans Bridge Rd. (NY 911F) to the Village of Scotia Line: Cold Recycling
This project was funded from RG138. NYSDOT added 10k to P and removed 9k from D.
|
Glenville, County, .76 cl-mi |
|
STP-Flex |
0.412 |
|
|
.050 P |
.331 C |
|
|
|
STP-Flex |
|
|
|
.031 D |
|
|
|
|
Total |
0.412 |
  |
  |
.081    |
.331    |
  |
  |
  |
Prelim. Des. |
0.050 |
  |
  |
.050    |
  |
  |
  |
  |
Construct'n |
0.331 |
  |
  |
  |
.331    |
  |
  |
  |
Detailed Des |
0.031 |
  |
  |
.031    |
  |
  |
  |
  |
|
Agency: County
Func. Class: UMC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
Erie Blvd. Renewal: Union Street to Nott Street
Federal funds are for mill & fill, pedestrian accommodations, striping and related signal improvements.
Local funds are for replacing both water lines, lining the sanitary and storm sewers, curbs and sidewalks, LED Smart lighting, curb islands and landscaping.
All federal funds were moved to C.
|
Schenectady, City, 2500 ft |
|
STP-Urb. |
1.517 |
|
1.517 C |
|
|
|
|
|
Local |
3.989 |
.460 P |
.306 D |
|
|
|
|
|
Local |
|
|
3.683 C |
|
|
|
|
|
Total |
5.506 |
.460    |
5.506    |
  |
  |
  |
  |
  |
Construct'n |
5.200 |
  |
5.200    |
  |
  |
  |
  |
  |
Prelim. Des. |
  |
.460    |
  |
  |
  |
  |
  |
  |
Detailed Des |
0.306 |
  |
.306    |
  |
  |
  |
  |
  |
|
Agency: City
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
Broadway from 0.12 miles south of Weaver St. to Fourth Street: Mill and Fill
Includes upgrading 8 crossings to ADA guidelines
|
Schenectady, City, 2500 ft |
|
STP-Urb. |
1.209 |
|
|
|
.060 P |
1.089 C |
|
|
STP-Urb. |
|
|
|
|
.060 D |
|
|
|
Total |
1.209 |
  |
  |
  |
.120    |
1.089    |
  |
  |
Prelim. Des. |
0.060 |
  |
  |
  |
.060    |
  |
  |
  |
Construct'n |
1.089 |
  |
  |
  |
  |
1.089    |
  |
  |
Detailed Des |
0.060 |
  |
  |
  |
.060    |
  |
  |
  |
|
Agency: City
Func. Class: UmA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
S243 |
1760.43 |
Bike/Ped |
2016-21 |
|
Mohawk-Hudson Bike-Hike Trail Rehabilitation
Shared jurisdiction: County, Town of Rotterdam & NYSOGS
|
Rotterdam, Multiple, 2.7 mi |
|
STP-Urb. |
0.216 |
|
|
.010 P |
|
.196 C |
|
|
STP-Urb. |
|
|
|
.010 D |
|
|
|
|
Total |
0.216 |
  |
  |
.020    |
  |
.196    |
  |
  |
Prelim. Des. |
0.010 |
  |
  |
.010    |
  |
  |
  |
  |
Construct'n |
0.196 |
  |
  |
  |
  |
.196    |
  |
  |
Detailed Des |
0.010 |
  |
  |
.010    |
  |
  |
  |
  |
|
Agency: County
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
Highbridge Road & East Campbell Road: Hot In-Place Recycling & Sidewalk Reconstruction/Extension
Highbridge Road (CR 48) and East Campbell Road (CR 67) from Kings Road to Hamburg Street
Includes former S246. Some funds moved from D to P. C was delayed one year.
|
Rotterdam, County, 4200 ft |
|
STP-Urb. |
1.435 |
|
|
|
.140 P |
1.226 C |
|
|
STP-Urb. |
|
|
|
|
.069 D |
|
|
|
Total |
1.435 |
  |
  |
  |
.209    |
1.226    |
  |
  |
Prelim. Des. |
0.140 |
  |
  |
  |
.140    |
  |
  |
  |
Construct'n |
1.226 |
  |
  |
  |
  |
1.226    |
  |
  |
Detailed Des |
0.069 |
  |
  |
  |
.069    |
  |
  |
  |
|
Agency: County
Func. Class: UMC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
Rosa Road, Wendell Avenue and Nott Street Intersection
5-leg signal, ped accommodations, refuge islands, high visibility crosswalks, improved striping.
NYSDOT moved funding between P & D and added 160K to C. Local funds were added to C.
|
Schenectady, City |
|
STP-Urb. |
0.560 |
|
|
.050 P |
.488 C |
|
|
|
STP-Urb. |
|
|
|
.022 D |
|
|
|
|
Local |
0.160 |
|
|
|
.160 C |
|
|
|
Total |
0.720 |
  |
  |
.072    |
.648    |
  |
  |
  |
Prelim. Des. |
0.050 |
  |
  |
.050    |
  |
  |
  |
  |
Construct'n |
0.648 |
  |
  |
  |
.648    |
  |
  |
  |
Detailed Des |
0.022 |
  |
  |
.022    |
  |
  |
  |
  |
|
Agency: City
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
Highbridge Rd. & East Campbell Rd.: Hot In-Place Recycling
Highbridge Rd. (CR 48) and East Campbell Rd. (CR 67) from Kings Rd. to Hamburg St.
This project is now included in S244.
|
Rotterdam, County, 4200 ft |
|
Total |
  |
  |
  |
  |
  |
  |
  |
  |
|
Agency: County
Func. Class: UMC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
S247
|
1760.57 |
Safety |
2016-21 |
|
Brandywine Avenue, I-890 to State Street: Safety Improvements
Signal upgrades, pedestrian improvements, corridor lighting (City Share) & lane reconfiguration (modification to striping)
NYSDOT moved funding between P & D.
|
Schenectady, City |
|
Safe-NY |
1.260 |
|
|
.074 P |
1.134 C |
|
|
|
Safe-NY |
|
|
|
.052 D |
|
|
|
|
Total |
1.260 |
  |
  |
.126    |
1.134    |
  |
  |
  |
Prelim. Des. |
0.074 |
  |
  |
.074    |
  |
  |
  |
  |
Construct'n |
1.134 |
  |
  |
  |
1.134    |
  |
  |
  |
Detailed Des |
0.052 |
  |
  |
.052    |
  |
  |
  |
  |
|
Agency: City
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
S249
|
1760.60 |
Safety |
2016-21 |
|
Nott Street/Balltown Road Intersection: Safety Improvements
Redesign intersection with new turn lane. Includes mill and fill of Nott Street from Balltown Road to Clifton Park Road
All phases were deferred one FFY & Construction another FFY. NYSDOT increased P by 15K.
|
Niskayuna, County |
|
Safety |
1.318 |
|
|
.115 P |
|
1.103 C |
|
|
Safety |
|
|
|
.100 D |
|
|
|
|
Local |
0.250 |
|
|
|
|
.250 C |
|
|
Total |
1.568 |
  |
  |
.215    |
  |
1.353    |
  |
  |
Prelim. Des. |
0.115 |
  |
  |
.115    |
  |
  |
  |
  |
Construct'n |
1.353 |
  |
  |
  |
  |
1.353    |
  |
  |
Detailed Des |
0.100 |
  |
  |
.100    |
  |
  |
  |
  |
|
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
S250
|
1760.77 |
Traff Op'n |
2016-21 |
|
River Road/Rosendale Road Intersection: Roundabout
Funds are capped. P,D,I & R rolled-over. $149K moved from I & R to C.
|
Niskayuna, County |
|
CMAQ |
1.945 |
|
|
.018 I  |
1.604 C |
|
|
|
CMAQ |
|
|
|
.133 P |
.058 R |
|
|
|
CMAQ |
|
|
|
.132 D |
|
|
|
|
Total |
1.945 |
  |
  |
.283    |
1.662    |
  |
  |
  |
ROW Incid. |
0.018 |
  |
  |
.018    |
  |
  |
  |
  |
Construct'n |
1.604 |
  |
  |
  |
1.604    |
  |
  |
  |
Prelim. Des. |
0.133 |
  |
  |
.133    |
  |
  |
  |
  |
ROW Aquis'n |
0.058 |
  |
  |
  |
.058    |
  |
  |
  |
Detailed Des |
0.132 |
  |
  |
.132    |
  |
  |
  |
  |
|
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
S251
|
1933.47 |
Safety |
2016-21 |
|
Air National Guard Road: Grade Crossing Signal Upgrade
Installation of Automatic Gates, Flashing Lights and Pavement Repair
DOT deferred P one year.
|
Scotia, Village |
|
Rail |
0.320 |
|
|
.025 P |
|
.295 C |
|
|
Total |
0.320 |
  |
  |
.025    |
  |
.295    |
  |
  |
Prelim. Des. |
0.025 |
  |
  |
.025    |
  |
  |
  |
  |
Construct'n |
0.295 |
  |
  |
  |
  |
.295    |
  |
  |
|
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
S252
|
1933.48 |
Safety |
2016-21 |
|
Van Buren Lane: Grade Crossing Signal Upgrade
Installation of Automatic Gates, Flashing Lights and Pavement Repair
DOT deferred P one year.
|
Glenville, Town |
|
Rail |
0.310 |
|
|
.025 P |
|
.285 C |
|
|
Total |
0.310 |
  |
  |
.025    |
  |
.285    |
  |
  |
Prelim. Des. |
0.025 |
  |
  |
.025    |
  |
  |
  |
  |
Construct'n |
0.285 |
  |
  |
  |
  |
.285    |
  |
  |
|
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
S253
|
1933.52 |
Safety |
2016-21 |
|
Sacandaga Road (NY 147) Grade Crossing Signal Upgrade
Installation of Automatic Gates, Flashing Lights, and Adjacent Pavement Repair
P was advanced by NYSDOT
|
Scotia, Village, NA |
|
Rail |
0.385 |
|
|
.025 P |
|
.360 C |
|
|
Total |
0.385 |
  |
  |
.025    |
  |
.360    |
  |
  |
Prelim. Des. |
0.025 |
  |
  |
.025    |
  |
  |
  |
  |
Construct'n |
0.360 |
  |
  |
  |
  |
.360    |
  |
  |
|
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
S254
|
1933.53 |
Safety |
2016-21 |
|
Vley Road Grade Crossing Signal Upgrade
Installation of Automatic Gates, Flashing Lights, and Adjacent Pavement Repair
P was advanced by NYSDOT
|
Scotia, Village, NA |
|
Rail |
0.385 |
|
|
.025 P |
|
.360 C |
|
|
Total |
0.385 |
  |
  |
.025    |
  |
.360    |
  |
  |
Prelim. Des. |
0.025 |
  |
  |
.025    |
  |
  |
  |
  |
Construct'n |
0.360 |
  |
  |
  |
  |
.360    |
  |
  |
|
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
S255
|
1933.54 |
Safety |
2016-21 |
|
Freeman’s Bridge Road (NY 911F) Grade Crossing Signal Upgrade
Installation of Automatic Gates, Flashing Lights, and Adjacent Pavement Repair
P was advanced by NYSDOT
|
Glenville, Town, NA |
|
Rail |
0.320 |
|
|
.025 P |
|
.295 C |
|
|
Total |
0.320 |
  |
  |
.025    |
  |
.295    |
  |
  |
Prelim. Des. |
0.025 |
  |
  |
.025    |
  |
  |
  |
  |
Construct'n |
0.295 |
  |
  |
  |
  |
.295    |
  |
  |
|
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
S256
|
1933.56 |
Safety |
2016-21 |
|
Lower Gregg Road Grade Crossing Signal Upgrade
Installation of Automatic Gates, Flashing Lights, and Adjacent Pavement Repair
|
Rotterdam, Town, NA |
|
Rail-100 |
0.450 |
|
|
|
.044 P |
|
|
|
Rail-100 |
|
|
|
|
.406 C |
|
|
|
Total |
0.450 |
  |
  |
  |
.450    |
  |
  |
  |
Prelim. Des. |
0.044 |
  |
  |
  |
.044    |
  |
  |
  |
Construct'n |
0.406 |
  |
  |
  |
.406    |
  |
  |
  |
|
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
S257
|
1760.95 |
Safety |
2016-21 |
|
City of Schenectady PSAP
Pedestrian safety improvements at: 10 signalized intersections
This project is capped.
|
Schenectady, City |
|
Safe-100 |
1.055 |
|
|
|
.110 P |
.875 C |
|
|
Safe-100 |
|
|
|
|
.070 D |
|
|
|
Total |
1.055 |
  |
  |
  |
.180    |
.875    |
  |
  |
Prelim. Des. |
0.110 |
  |
  |
  |
.110    |
  |
  |
  |
Construct'n |
0.875 |
  |
  |
  |
  |
.875    |
  |
  |
Detailed Des |
0.070 |
  |
  |
  |
.070    |
  |
  |
  |
|
Agency: City
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
S258 |
1761.18 |
Bridge R/R |
2016-21 |
|
Francis Ave. Over I-890: Bridge Repair or Replace
BIN 2203080
|
Schenectady, City |
|
NHPP-NY |
3.459 |
|
|
|
.263 D |
2.933 C |
|
|
NHPP-NY |
|
|
|
|
.263 P |
|
|
|
Total |
3.459 |
  |
  |
  |
.526    |
2.933    |
  |
  |
Detailed Des |
0.263 |
  |
  |
  |
.263    |
  |
  |
  |
Construct'n |
2.933 |
  |
  |
  |
  |
2.933    |
  |
  |
Prelim. Des. |
0.263 |
  |
  |
  |
.263    |
  |
  |
  |
|
Agency: City
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
S267
|
1761.82 |
Bike/Ped |
2016-21 |
|
NY 5S Bike/Ped Improvements
From NY 103/Bridge Street to Parkis Street and on Iroquois Street
Includes: concrete sidewalk; paved, colored bike lanes; high-visibility crosswalks; signs; sharrows; interpretive signage; and landscaping.
|
Rotterdam, Town, .38 cl-mi |
|
TAP |
2.755 |
|
|
|
|
.143 P |
2.469 C |
|
TAP |
|
|
|
|
|
.143 D |
|
|
Total |
2.755 |
  |
  |
  |
  |
.286    |
2.469    |
  |
Prelim. Des. |
0.143 |
  |
  |
  |
  |
.143    |
  |
  |
Construct'n |
2.469 |
  |
  |
  |
  |
  |
2.469    |
  |
Detailed Des |
0.143 |
  |
  |
  |
  |
.143    |
  |
  |
|
Agency: Town
Func. Class: UmA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
S268
|
1761.84 |
Bike/Ped |
2016-21 |
|
Washington Avenue Bike/Ped Connection
Includes a multi-use path, sidewalk & crosswalks connecting residential neighborhoods to the Collins Lake access area and to an existing trail connector.
|
Scotia, Village, 3600 ft |
|
TAP |
0.891 |
|
|
|
.040 P |
|
.701 C |
|
TAP |
|
|
|
|
.150 D |
|
|
|
Total |
0.891 |
  |
  |
  |
.190    |
  |
.701    |
  |
Prelim. Des. |
0.040 |
  |
  |
  |
.040    |
  |
  |
  |
Construct'n |
0.701 |
  |
  |
  |
  |
  |
.701    |
  |
Detailed Des |
0.150 |
  |
  |
  |
.150    |
  |
  |
  |
|
Agency: Village
Func. Class: UL
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
S269
|
1761.86 |
Traff Op'n |
2016-21 |
|
Rosendale Road/Old River Road Intersection Improvements
Traffic signal, wider travel lanes and shoulders, and turn lanes. Provide standard stopping sight distances & wider areas for errant vehicles.
|
Niskayuna, Town |
|
CMAQ |
2.293 |
|
|
|
.125 P |
|
.210 R |
|
CMAQ |
|
|
|
|
.040 I  |
|
1.778 C |
|
CMAQ |
|
|
|
|
.140 D |
|
|
|
Total |
2.293 |
  |
  |
  |
.305    |
  |
1.988    |
  |
Prelim. Des. |
0.125 |
  |
  |
  |
.125    |
  |
  |
  |
ROW Aquis'n |
0.210 |
  |
  |
  |
  |
  |
.210    |
  |
ROW Incid. |
0.040 |
  |
  |
  |
.040    |
  |
  |
  |
Construct'n |
1.778 |
  |
  |
  |
  |
  |
1.778    |
  |
Detailed Des |
0.140 |
  |
  |
  |
.140    |
  |
  |
  |
|
Agency: County
Func. Class: Mult
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|