Address : One Park Place Albany, NY 12205-1606

Phone : (518) 458-2161 | Email: cdtc@cdtcmpo.org

2016-21 TIP TIP Number R318 (PIN 1760.36) < TIP # > | < PIN >
All funds are in matched millions of dollars.
This project is based on the project fact sheet used in the 2016-21 TIP Update.

Project Listings |  Interactive Map |  Previous Online TIP's

Project Description

East Street from Partition St. to Third Ave.: Reconstruction

Improvements to pavement, and pedestrian accommodations.

Local funds will provide storm water, and sanitary sewer separation and utilities.

C phase was advanced by NYSDOT then delayed. Budget estimates were also changed.




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source 2015-16
(Oblig'd)
2016-17
(1st Year)
2017-18
(2nd Year)
2018-19
(3rd Year)
2019-20
(4th Year)
2020-21
(5th Year)
Post '21

STP-Urb.

0 0.200 P 0 1.851 C 0 0 0

STP-Urb.

0 0.200 D 0 0 0 0 0

Total

0 0.400 0 1.851 0 0 0



Funding Totals by Phase

Phase Five-Year Funding (2016-17 thru 2020-21) Six-Year Funding (2015-16 thru 2020-21)

Engineering

0.400

0.400

Construction

1.851

1.851

Total

2.251

2.251




Other Information

TIP Number: R318 First TIP: 2016-21
PIN: 1760.36 Func. Class: UMC
Project Type: Reconst'n Length: .61 cl-mi
Jurisdiction: City Plan Ref.: NV
Location: Rensselaer No EIS Required
Implementer: City Air Quality: Exempt





CDTC Home Page