Address : One Park Place Albany, NY 12205-1606

Phone : (518) 458-2161 | Email: cdtc@cdtcmpo.org

2016-21 TIP TIP Number R195 (PIN 1754.59) < TIP # > | < PIN >
All funds are in matched millions of dollars.
This listing includes the amendment for this project of 03/17 and 12/18 .

Project Listings |  Interactive Map |  Previous Online TIP's

Project Description

South Troy Industrial Park Road Phase I (Southern End)

Improve existing East Industrial Parkway from Main Street/Burden Avenue (US 4) to northern terminus and construct a new two- lane road from there to Monroe Street, including sidewalks and bike lanes.

Project previously included R195A . R195 & R195A are capped in total. Any funding changes require at least Planning Committee action.

Before project split: R & D rolled-over. I was added by DOT. 0.742M was moved from C to R, and R was delayed one year. D rolled over. I, D & R are amounts obligated, with reductions moved to C.




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source 2015-16
(Oblig'd)
2016-17
(1st Year)
2017-18
(2nd Year)
2018-19
(3rd Year)
2019-20
(4th Year)
2020-21
(5th Year)
Post '21

STP-Flex

0 0 0.359 D 2.500 C 0 0 0

STP-Flex

0 0.057 I 0.400 R 0 0 0 0

Total

0 0.057 0.759 2.500 0 0 0



Funding Totals by Phase

Phase Five-Year Funding (2016-17 thru 2020-21) Six-Year Funding (2015-16 thru 2020-21)

Engineering

0.359

0.359

Right-of-Way

0.457

0.457

Construction

2.500

2.500

Total

3.316

3.316




Other Information

TIP Number: R195 First TIP: 1997-02
PIN: 1754.59 Func. Class: UC
Project Type: New Cons'n Length: 4000 feet
Jurisdiction: City Plan Ref.: NV
Location: Troy May Require EIS
Implementer: City Air Quality: Non-Exempt





CDTC Home Page