Address : One Park Place Albany, NY 12205-1606

Phone : (518) 458-2161 | Email: cdtc@cdtcmpo.org

2016-21 TIP TIP Number A552 (PIN 1759.77) < TIP # > | < PIN >
All funds are in matched millions of dollars.
This project is based on the project fact sheet used in the 2013-18 TIP Update.

Project Listings |  Interactive Map |  Previous Online TIP's

Project Description

Black Bridge Rail Trail Connection: Upper Cannon Street to Village Line

Includes 1,000 feet new concrete sidewalk along Cannon Street

This project was funded as a drawdown on RG103 . The D phase rolled-over.




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source 2015-16
(Oblig'd)
2016-17
(1st Year)
2017-18
(2nd Year)
2018-19
(3rd Year)
2019-20
(4th Year)
2020-21
(5th Year)
Post '21

STP-Flex

0.035 P 0.034 D 0 0 0 0 0

STP-Flex

0 0.375 C 0 0 0 0 0

Total

0.035 0.409 0 0 0 0 0



Funding Totals by Phase

Phase Five-Year Funding (2016-17 thru 2020-21) Six-Year Funding (2015-16 thru 2020-21)

Engineering

0.034

0.069

Construction

0.375

0.375

Total

0.409

0.444




Other Information

TIP Number: A552 First TIP: 2013-18
PIN: 1759.77 Func. Class: NA
Project Type: Bike/Ped Length: 1000 ft
Jurisdiction: Village Plan Ref.: NV
Location: Green Island No EIS Required
Implementer: Village Air Quality: Exempt





CDTC Home Page