Capital District Transportation Committee
Transportation Improvement Program
2016-21 Albany County Project Listings

All Funding is in Matched Millions of Dollars - Last Updated 02-20-2018
TIP #
PIN or ID#
Proj Type
First TIP
Project Description
Location, Jurisdiction, Length
"
Fund
Source
5-Year
Total
Program Years (Federal Fiscal Years)
Phase Com-
mitted
2015-16
1st Year
2016-17
2nd Year
2017-18
3rd Year
2018-19
4th Year
2019-20
5th Year
2020-21
Post
2021
Other Notes
Capital District Transportation Committee Transportation Improvement Program
2016-21 Albany County Project Listings

All Funding is in Matched Millions of Dollars - Last Updated 02-20-2018

TIP #
PIN or ID#
Proj Type
First TIP
Project Description
Location, Jurisdiction, Length
"
Fund
Source
5-Year
Total
Program Years (Federal Fiscal Years)
Phase Com-
mitted
2015-16
1st Year
2016-17
2nd Year
2017-18
3rd Year
2018-19
4th Year
2019-20
5th Year
2020-21
Post
2021
Other Notes
A240





1721.90
New Cons'n
1992-97
I-87 Exit 4 Airport Connector

Currently no addtional funds are available for this project.

Phase One of this project (1721.51) was the I87 bridge over Albany Shaker Road.

Related to A553.
Colonie (T), State, 2.4 Ln-Mi
NHPP-NY 41.600 4.700 D 41.600 C
NHPP-NY 3.700 R
Total 41.600 8.400        41.600         
Detailed Des   4.700               
Construct'n 41.600       41.600         
ROW Aquis'n   3.700               
Agency: NYSDOT
Func. Class: UI
Plan Ref.: GEIS/Air
EIS Required
AQ Status: Non-Exempt
A290


1347.07
New Cons'n
1993-98
Selkirk Bypass

More information is in the 2013-18 TIP project listing.

Additional funding is dependent on identification of a fund source.
Bethlehem, State, 1 Mile
NHPP   7.985 C
NHPP .119 D
Total               8.104   
Construct'n               7.985   
Detailed Des               .119   
Agency: NYSDOT
Func. Class: RMC
Plan Ref.: 9W
May Require EIS
AQ Status: Non-Exempt
A295



1753.60
Recon/Cap
1993-98
New Karner Road (NY 155), from US 20 to NY 5: Corridor Improvements

Related Project: A336 from the 2003-08 TIP.



Multiple, County, 3.0 mi
STP-Flex   15.400 C
STP-Flex .750 P
STP-Flex .750 R
STP-Flex .375 D
Total               17.275   
Construct'n               15.400   
Prelim. Des.               .750   
ROW Aquis'n               .750   
Detailed Des               .375   
Agency: County
Func. Class: UPA
Plan Ref.: Pine
EIS Required
AQ Status: Non-Exempt
A453

1759.22
Recon/Cap
2005-10
Watervliet Shaker Road, from Karner Road to Albany Shaker Road: Corridor Improvements, Phase 3

More information is in the 2013-18 TIP project listing.
Colonie (T), County, 4.0 Ln-Mi
STP-Flex   3.600 C
Local   2.835 C
Total               6.435   
Construct'n               6.435   
Agency: County
Func. Class: UPA
Plan Ref.: GEIS/Air
EIS Required
AQ Status: Non-Exempt
A487
1306.77
Resurface
2007-12
NY 7, I-87 To I-787 Overlap: Minor Rehabilitation

This project is now included in A570.
Colonie (T), State
Total                
Agency: NYSDOT
Func. Class: UPE
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A523







1759.14
Reconst'n
2010-15
Albany Shaker Road & Northern Boulevard: Reconstruction

Albany Shaker Road, Corporate Woods Boulevard to US 9 Overpass Bridge: New sidewalks and curbs, pedestrian facilities, crosswalks, bicycle facilities, signals, and drainage.

Northern Boulevard, US 9 Bridge to I-90 Bridge: turning lanes, raised landscaped median, shared travel lane.
Albany, City, Ln-Mi
STP-Flex   9.670 C
STP-Flex .200 R
STP-Flex .600 P
STP-Flex .600 D
Total               11.070   
Construct'n               9.670   
ROW Aquis'n               .200   
Prelim. Des.               .600   
Detailed Des               .600   
Agency: City
Func. Class:
Plan Ref.: HWY Cond
No EIS Required
AQ Status: Exempt
A524




1759.17
Safety
2010-15
Albany County High Risk Rural Road Safety Program: Various Locations

Guide rail, slope flattening, advanced warning signs, fixed object removal/modification, curve delineation with chevrons, and similar low-cost safety improvements at high risk locations on county roads.
Multiple, County
Safety   .440 C
Safety .050 D
Safety .050 P
Total               .540   
Construct'n               .440   
Detailed Des               .050   
Prelim. Des.               .050   
Agency: County
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A526
1758.92
Bridge R/R
2010-15
CR 9 over Fox Creek: Element Specific Bridge Repair

Bin 3300880

Berne, County
STP-Off 2.040 .119 D 2.040 C
STP-Off .100 P
Total 2.040 .219    2.040             
Detailed Des   .119               
Construct'n 2.040   2.040             
Prelim. Des.   .100               
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A527
1758.91
Bridge R/R
2010-15
CR 55 over Vloman Kill: Element Specific Bridge Repair

Bin 3301050
Bethlehem, County
STP-Flex   .690 C
Total   .690               
Construct'n   .690               
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A533






1933.17
Safety
2010-15
Main Street Crossing of Canadian Pacific Railroad (Colonie Main Line): Upgrade Warning Devices

Includes sidewalk installation, curbed island, driveway relocation and similar treatments at the following crossings: Bridge Street, Spring Street, Main Street, Pine Street, Newark/Remsen Street, and Columbia/Mohawk Street.
Cohoes, City
Rail   .401 C
Total   .401               
Construct'n   .401               
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A538

1809.81
Bridge R/R
2013-18
SME Ramp To I-787 North: Bridge Rehabilitation

BIN 109298C

C was deferred one year & then moved back.
, State
NHPP 4.165 .100 P .100 D 4.065 C
Total 4.165 .100    .100    4.065           
Prelim. Des.   .100               
Detailed Des 0.100   .100             
Construct'n 4.065     4.065           
Agency: NYSDOT
Func. Class: UPA
Plan Ref.:

AQ Status: Exempt
A539
1809.82
Bridge R/R
2013-18
I-787 NB to SME: Bridge Rehabilitation

BIN 109297A

C was deferred one year & then moved back.
, State
NHPP 2.825 .050 P .050 D 2.775 C
Total 2.825 .050    .050    2.775           
Prelim. Des.   .050               
Detailed Des 0.050   .050             
Construct'n 2.775     2.775           
Agency: NYSDOT
Func. Class: UI
Plan Ref.:

AQ Status: Exempt
A543









1932.97
Safety
2013-18
Municipal Rail Crossing Work at Bridge Street Rail Crossing in Cohoes

This is a signal improvement/circuit upgrade.

Includes sidewalk installation, curbed island, driveway relocation and similar treatments.

This project started as A533 (1933.17) in the 2010-15 TIP.

C rolled over.
Cohoes, City
Rail 0.065 .065 C
Total 0.065   .065             
Construct'n 0.065   .065             
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A545






CDTC45
Trans.Misc
2013-18
Washington/Western Bus Rapid Transit (BRT) Small Starts Project Development

Design to support development of Washington/Western BRT project, to link downtown Albany with the campuses of Harriman State and University of Albany: Includes queue jump lanes, 15 stations, & new transit center at Crossgates Mall

This is a drawdown on RG109.
Albany, City, 8 mi
NHPP   2.344 P
STP-Flex   1.156 P
Total   3.500               
Prelim. Des.   3.500               
Agency: CDTA
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Non-Exempt
A546

1759.68
Bike/Ped
2013-18
Delaware Avenue Hamlet Multi-Modal Streetscape Enhancements

$0.120M was obligated in 2014-15.


Bethlehem, Town
STP-Enh. 1.154 .006 I 
STP-Enh. .220 D 1.154 C
Local 1.500 .100 D 1.500 C
Total 2.654 .326    2.654             
ROW Incid.   .006               
Detailed Des   .320               
Construct'n 2.654   2.654             
Agency: Town
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A549








1759.74
Safety
2013-18
Madison Avenue Road Diet, North Allen Street to Partridge Street

Signal upgrades & coordination and roadway configuration and bicycle/pedestrian improvements for a road diet.

Design from North Allen to Delaware/Lark

This project was funded via RG39 & RG103.
Albany, City
STP-Flex   .270 C
Safety   .206 C
Total   .476               
Construct'n   .476               
Agency: City
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A550



1759.75
Traff Op'n
2013-18
Ontario Street & Delaware Avenue Intersection

Traffic signal to create a controlled intersection with ped signals, crosswalks and ADA ramps

This project was funded via RG39.
Cohoes, City
STP-Flex   .016 P
STP-Flex .277 C
Total   .293               
Prelim. Des.   .016               
Construct'n   .277               
Agency: City
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A552



1759.77
Bike/Ped
2013-18
Black Bridge Rail Trail Connection: Upper Cannon Street to Village Line

Includes 1,000 feet new concrete sidewalk along Cannon Street

This project was funded as a drawdown on RG103. The D phase rolled-over.
Green Island, Village, 1000 ft
STP-Flex 0.409 .035 P .034 D
STP-Flex .375 C
Total 0.409 .035    .409             
Prelim. Des.   .035               
Detailed Des 0.034   .034             
Construct'n 0.375   .375             
Agency: Village
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A553







1759.78
Resurface
2013-18
Albany Shaker Road/Dalessondro Boulevard (CR 151): Resurfacing

Limits are from about 600 feet south of Meeting House Road to Airport Park Blvd.

Includes replacement of traffic signal inductance loops.

This project was funded as a drawdown on RG125. C rolled over. Limits changed slightly to coordinate with A240.
Colonie (T), County, 1.44 clm
STP-Urb. 1.068 1.068 C
Local   .080 D
Local .080 P
Total 1.068 .160    1.068             
Construct'n 1.068   1.068             
Detailed Des   .080               
Prelim. Des.   .080               
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A554













1759.79
R&P
2013-18
City of Albany Mill & Fills

1) Ten Broeck Street from Clinton Avenue to Livingston Avenue

2) Cardinal Avenue from New Scotland Avenue to Whitehall Road

3) Whitehall Road from Fullerton Street to Ten Eyck Avenue

Includes some sharrows, ADA ramps, curbs, sidewalk & cross-walks

This project includes A555 (1759.80) & A556 (1759.81) from the 2013-18 TIP

This project was a drawdown on RG125.
Albany, City, 1.23 clm
STP-Urb.   1.208 C
Total   1.208               
Construct'n   1.208               
Agency: City
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A562


1760.13
Bridge R/R
2013-18
Henry Johnson Blvd. over Sherman Street: Element Specific Bridge Repair

BIN 2200270

This is a drawdown on RG126.

Albany, City
STP-Urb. 1.080 .972 C
STP-Urb. .054 P
STP-Urb. .054 D
Local 0.148 .148 C
Total 1.228   1.228             
Construct'n 1.120   1.120             
Prelim. Des. 0.054   .054             
Detailed Des 0.054   .054             
Agency: City
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A563
1051.79
Bridge R/R
2013-18
South Mall Expressway Pier 18 Bridges: I-787 to Empire State Plaza, Repair


Albany, State
STP-Urb.   2.530 C
SDF   .130 D
Total   2.660               
Construct'n   2.530               
Detailed Des   .130               
Agency: NYSDOT
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A564


















1760.25
R&P
2016-21
Madison Avenue from Partridge St. to Lake Ave./Delaware Ave.

1) Partridge St. to Lake Ave.: Road Diet (traffic signals and pedestrian improvements)

2) Lark St. to Lake Ave.: Mill & Fill, sidewalk replacement, 3,000 feet of curb replacement/resetting

3) Lark St. to New Scotland Ave.: 9 ADA ramps, 7 high visibility crosswalks

4) New Scotland Ave. to Lake Ave.: 6 ADA ramps, 11 high visibility crosswalks

These Safe-100 funds are statewide and require no local match. P & D have been combined. Includes PINS 1760.58 & 1760.26. Includes former A565.
Albany, City, .28 cl-mi
Safety 1.326 .240 D
Safety 1.086 C
Safe-100 1.400 .140 D
Safe-100 1.260 C
Local 1.235 1.135 C
Local .100 P
Total 3.961   3.961             
Detailed Des 0.380   .380             
Construct'n 3.481   3.481             
Prelim. Des. 0.100   .100             
Agency: City
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A565




1760.26
R&P
2016-21
Madison Avenue from New Scotland Ave. to South Lake Ave.: Mill & Fill

Also includes 6 ADA ramps, sidewalk replacement, 1,500 feet of curb replacement/resetting, 11 high visibility crosswalks.

This is now included in A564.
Albany, City, .34 cl-mi
Total                
Agency: City
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A566









1760.27
R&P
2016-21
Albany City Pavement Mill & Fills

New Scotland Avenue from Manning Blvd. to Onderdonk Avenue

Pearl Street from Clinton Ave. to Madison Avenue

Also includes 62 ADA ramps, sidewalk replacement, 1100 ft. of curb replacement/resetting, 46 new high visibility crosswalks.

Includes former A567 (1760.28).
Albany, City, .88 cl-mi
STP-Urb. 1.095 .100 P .895 C
STP-Urb. .100 D
Total 1.095   .200    .895           
Prelim. Des. 0.100   .100             
Construct'n 0.895     .895           
Detailed Des 0.100   .100             
Agency: City
Func. Class: UmA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A567



1760.28
R&P
2016-21
Pearl Street from Clinton Ave. to Madison Ave.: Mill & Fill

Includes 50 ADA curb ramps, 5,000 SF sidewalk replacement, 500 feet of curbs, 36 new high visibility crosswalks.

Now combined with A566.
Albany, City, .66 cl-mi
Total                
Agency: City
Func. Class: Mult
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A568



1760.29
R&P
2016-21
Hudson Avenue from Tibbits Ave to the Watervliet City Line: Mill & Fill

Also, improve ADA compliant crosswalks, install high visibility crosswalks, and improve cyclist safety.

This project was funded from RG138.
Green Island, Village, 1.05 cl-mi
STP-Urb. 0.729 .036 P .657 C
STP-Urb. .036 D
Total 0.729     .072    .657         
Prelim. Des. 0.036     .036           
Construct'n 0.657       .657         
Detailed Des 0.036     .036           
Agency: Village
Func. Class: Mult
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A569


1045.16
R&P
2016-21
NY 377 and NY 378: Mill & Fill

NY 377: Van Rensselaer Blvd to NY 378 NY 378: NY 377 to US 9

The project will incorporate a Road Diet on NY 377 & 7 ADA ramps
Multiple, State, 2.27 cl-mi
STP-Urb. 1.354 1.282 C
STP-Urb. .072 P .072 D
Total 1.354 .072    1.354             
Construct'n 1.282   1.282             
Prelim. Des.   .072               
Detailed Des 0.072   .072             
Agency: NYSDOT
Func. Class: UmA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A570






1051.80
R&P
2016-21
I-787 & NY Preservation and Safety

I-787: NY 378 to Tibbits Avenue: Mill & Fill

NY 7, I-87 To I-787 Overlap: Minor Rehabilitation and Safety Improvements, Including Median Barriers

P was paid for by RG117. This project includes A487.
Multiple, State, 2.4 cl-mi
NHPP 5.265 .115 D 5.150 C
SDF 0.310 .310 D
Total 5.575   .425    5.150           
Detailed Des 0.425   .425             
Construct'n 5.150     5.150           
Agency: NYSDOT
Func. Class: UI
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A571


1760.30
R&P
2016-21
Krumkill Road from Font Grove Road (CR 306) to the Normanskill: Cold in Place Recycling

Includes 200 ft of structural repairs

This project was funded from RG138.
New Scotland, Town, .85 cl-mi
STP-Urb. 0.352 .316 C
STP-Urb. .018 P
STP-Urb. .018 D
Total 0.352     .352           
Construct'n 0.316     .316           
Prelim. Des. 0.018     .018           
Detailed Des 0.018     .018           
Agency: Town
Func. Class: UMC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A572
1051.77
Bridge R/R
2016-21
I-787 NB Ramp over the SME to SME WB: Element Specific Repairs

BIN 109299A
Albany, State
NHPP 9.039 .450 P .450 D 8.139 C
Total 9.039   .450      .450    8.139       
Prelim. Des. 0.450   .450             
Detailed Des 0.450       .450         
Construct'n 8.139         8.139       
Agency: NYSDOT
Func. Class: UI
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A573
1528.84
Bridge R/R
2016-21
I-90 Bridge over Erie Blvd.: Element Specific Repairs

BINS 1092451, 1092452
Albany, State
NHPP 6.471 .320 P .320 D 5.831 C
Total 6.471   .320    .320    5.831         
Prelim. Des. 0.320   .320             
Detailed Des 0.320     .320           
Construct'n 5.831       5.831         
Agency: NYSDOT
Func. Class: UI
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A574

1528.82
Bridge R/R
2016-21
I-90 Bridge over Fuller Road: Element Specific Repairs

BIN 1034479

D Rolled-over
Albany, State
NHPP 6.908 .200 P .400 D 6.508 C
Total 6.908 .200    .400    6.508           
Prelim. Des.   .200               
Detailed Des 0.400   .400             
Construct'n 6.508     6.508           
Agency: NYSDOT
Func. Class: UI
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A575
1039.56
Bridge R/R
2016-21
US 9W Bridge over I-787: Element Specific Repairs

BIN 1054460 P rolled over
Albany, State
STP-Urb. 3.289 .165 D 2.959 C
STP-Urb. .165 P
Total 3.289     .330    2.959         
Detailed Des 0.165     .165           
Construct'n 2.959       2.959         
Prelim. Des. 0.165     .165           
Agency: NYSDOT
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A576


1007.16
Bridge R/R
2016-21
NY 144 Bridge over the Hannacrois Creek: Renew or Replace

BIN 1038070



Coeymans, State
NHPP 2.116 .110 P .100 D 1.826 C
NHPP .010 I  .070 R
Total 2.116   .120    .170    1.826         
Prelim. Des. 0.110   .110             
Detailed Des 0.100     .100           
Construct'n 1.826       1.826         
ROW Incid. 0.010   .010             
ROW Aquis'n 0.070     .070           
Agency: NYSDOT
Func. Class: UMC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A577






1760.31
Bike/Ped
2016-21
Voorheesville Pedestrian Connectivity

Installation of sidewalks on Altamont Rd. (NY 156), Maple Ave. (NY 85A), and Voorheesville Ave. (CR 306)

Includes several pedestrian amenities

Jurisdiction is both State and County

P & D rolledover.
Voorheesville, Multiple, 5400 ft
STP-Urb. 0.827 .080 P .667 C
STP-Urb. .080 D
Total 0.827     .160    .667         
Prelim. Des. 0.080     .080           
Construct'n 0.667       .667         
Detailed Des 0.080     .080           
Agency: Village
Func. Class: Mult
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A578


1760.32
R&P
2016-21
NY 32 (3rd Ave.) from 1st St. (South City Line) to Broadway: Mill & Fill

Inlcudes ADA ramps, markings and signage

This is a shared jurisdiction between Watervliet and NY State
Watervliet, Multiple, .72 cl-mi
STP-Urb. 0.649 .649 C
Local 0.064 .032 P
Local .032 D
Total 0.713     .713           
Construct'n 0.649     .649           
Prelim. Des. 0.032     .032           
Detailed Des 0.032     .032           
Agency: City
Func. Class: UmA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A579

1760.33
Bike/Ped
2016-21
Watervliet Bike Path

From the northern terminus of the Mohawk-Hudson Bike Trail northerly on Broadway to 23rd St. in Watervliet, ending at the Hudson Shores Park.
Watervliet, City, 9800 ft
STP-Urb. 0.505 .025 D .455 C
STP-Urb. .025 P
Total 0.505     .050    .455         
Detailed Des 0.025     .025           
Construct'n 0.455       .455         
Prelim. Des. 0.025     .025           
Agency: City
Func. Class: Mult
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A580




1306.81
Bridge R/R
2016-21
NY 7 Bridge over the Hudson River: Element Specific Repairs

This project is for P & D only and does not guarantee construction funding. The other half of this project is R308.

BIN 1070869

Green Island, State
STP-Urb. 1.000 .500 P .500 D
Urban-NY 8.750 8.750 C
Total 9.750   .500    .500    8.750         
Prelim. Des. 0.500   .500             
Detailed Des 0.500     .500           
Construct'n 8.750       8.750         
Agency: NYSDOT
Func. Class: UI
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A581

1760.45
Bike/Ped
2016-21
West Old State Road: New Sidewalk

South side of the road, from Gardenview Terrace to Regina Drive, and from an existing walkway on Victoria Drive to Lynnwood Elementary School.
Guilderland, Town, 1760 ft
STP-Urb. 0.297 .025 D .247 C
STP-Urb. .025 P
Total 0.297     .050      .247       
Detailed Des 0.025     .025           
Construct'n 0.247         .247       
Prelim. Des. 0.025     .025           
Agency: Town
Func. Class: UL
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A582
1933.44
Safety
2013-18
Green Street Grade Crossing Signal Upgrade

C rolled over.
Albany, City
Rail 0.435 .015 P .435 C
Total 0.435 .015    .435             
Prelim. Des.   .015               
Construct'n 0.435   .435             
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A583


1085.40
Safety
2016-21
Carmen Road Safety Improvements

Jessamine Lane to 500 feet past Old Carmen Road

Two-way turn lane, new sidewalks & pedestrian accommodations.
Guilderland, State
Safe-NY 1.150 .050 P .050 D 1.100 C
Total 1.150 .050        .050    1.100       
Prelim. Des.   .050               
Detailed Des 0.050       .050         
Construct'n 1.100         1.100       
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A584


1810.74
Bike/Ped
2016-21
Menands Bike/Ped Connector

Construct trail connection with Bike/Ped Bridge over I-787 along NY 913T (Access Ramps to I-787) from NY 32 to Mohawk Hudson Bike Hike Trail

Menands, State
Flex-NY 5.200 .200 P .200 D 4.750 C
Flex-NY .010 I  .040 R
Total 5.200   .210    .240    4.750         
Prelim. Des. 0.200   .200             
Detailed Des 0.200     .200           
Construct'n 4.750       4.750         
ROW Incid. 0.010   .010             
ROW Aquis'n 0.040     .040           
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A585




1007.19
R&P
2016-21
NY 144, Nadine Mt Rd to Coeymans Creek & NY 143, 9W to NY 144: Corrective Maintenance & ADA Improvements

NY547, Program Code RPS9

NYSDOT moved 50K from R & I to C

The local funds are for a waterline.
Coeymans, State
Demo. 1.500 .075 P 1.350 C
Demo. .075 D
SDF 0.346 .346 C
Local 0.330 .330 C
Total 2.176   .150    2.026           
Prelim. Des. 0.075   .075             
Construct'n 2.026     2.026           
Detailed Des 0.075   .075             
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A586




1760.79
Bike/Ped
2016-21
US 20 (Western Avenue), from Devonshire Drive to Mercy Care Lane: New Sidewalk

This is on the south side and includes curbs and intersction ramps.

These funds are capped. P, D & I rolled-over. C deferred one year.

Guilderland, Town, 2250 ft
CMAQ 0.852 .044 P .735 C
CMAQ .043 D
CMAQ .005 I 
CMAQ .025 R
Total 0.852     .117    .735         
Prelim. Des. 0.044     .044           
Construct'n 0.735       .735         
Detailed Des 0.043     .043           
ROW Incid. 0.005     .005           
ROW Aquis'n 0.025     .025           
Agency: Town
Func. Class: UL
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
A587



1760.80
Traff Op'n
2016-21
US NY 9W/Feura Bush Road/Glenmont Road (NYS NY 910A): Roundabout

Includes Sidewalk Extension on Glenmont Road to Glenmont Elementary School

These funds are capped.

Bethlehem, Town
CMAQ 4.846 .553 P .043 R 4.047 C
CMAQ .184 D
CMAQ .019 I 
Total 4.846     .756    .043    4.047       
Prelim. Des. 0.553     .553           
ROW Aquis'n 0.043       .043         
Construct'n 4.047         4.047       
Detailed Des 0.184     .184           
ROW Incid. 0.019     .019           
Agency: Town
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt