Address : One Park Place Albany, NY 12205-1606

Phone : (518) 458-2161 | Email: cdtc@cdtcmpo.org

2013-18 TIP TIP Number SA225 (PIN 1757.54) < TIP # > | < PIN >
All funds are in matched millions of dollars.
This listing includes the amendment for this project of 08/14 .

Project Listings |  Interactive Map |  Previous Online TIP's

Project Description

Round Lake Road Traffic and Mobility Improvements

Includes bike/ped accommodations between East Line Road and the Round Lake Bypass roundabout. Intersection capacity and operational improvements would be constructed at Chango Drive and at Ruhle Road. Also, access management improvements, advance storm water management and street-scaping.

A total of $9.251M was available for this project and has all been programmed. Programming is considered when scope and limits are defined for CDTC to amend its TIP air quality conformity determination. Projects SA226 & SA227 were funded through this project. SA228 is related.

DOT moved 50k from I to D, and 58K from C to R.

R & C Rolled-over




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source 2012-13
(Oblig'd)
2013-14
(1st Year)
2014-15
(2nd Year)
2015-16
(3rd Year)
2016-17
(4th Year)
2017-18
(5th Year)
Post '18

Demo.

0.300 D 0 4.486 C 0 0 0 0

Demo.

0.176 P 0 0.209 R 0 0 0 0

Demo.

0.055 I 0.050 D 0 0 0 0 0

Total

0.531 0.050 4.695 0 0 0 0



Funding Totals by Phase

Phase Five-Year Funding (2013-14 thru 2017-18) Six-Year Funding (2012-13 thru 2017-18)

Engineering

0.050

0.526

Right-of-Way

0.209

0.264

Construction

4.486

4.486

Total

4.745

5.276




Other Information

TIP Number: SA225 First TIP: 2005-10
PIN: 1757.54 Func. Class: NA
Project Type: Reconst'n Length: TBD
Jurisdiction: County Plan Ref.: Luther
Location: Multiple No EIS Required
Implementer: County Air Quality: Exempt





CDTC Home Page