Capital District Transportation Committee
Transportation Improvement Program
2013-18 Saratoga County Project Listings

All Funding is in Matched Millions of Dollars - Last Updated 06-26-2019
TIP #
PIN or ID#
Proj Type
First TIP
Project Description
Location, Jurisdiction, Length
"
Fund
Source
5-Year
Total
Program Years (Federal Fiscal Years)
Phase Com-
mitted
2012-13
1st Year
2013-14
2nd Year
2014-15
3rd Year
2015-16
4th Year
2016-17
5th Year
2017-18
Post
2018
Other Notes
Capital District Transportation Committee Transportation Improvement Program
2013-18 Saratoga County Project Listings

All Funding is in Matched Millions of Dollars - Last Updated 06-26-2019

TIP #
PIN or ID#
Proj Type
First TIP
Project Description
Location, Jurisdiction, Length
"
Fund
Source
5-Year
Total
Program Years (Federal Fiscal Years)
Phase Com-
mitted
2012-13
1st Year
2013-14
2nd Year
2014-15
3rd Year
2015-16
4th Year
2016-17
5th Year
2017-18
Post
2018
Other Notes
SA88


1096.18
Resurface
1993-98
NY 50, North of Saratoga Springs: Reconstruction

Includes pedestrian crossings.



Multiple, State, 5 Ln-Mi
STP-Flex 0.245 .245 D 13.203 C
STP-Flex .123 R
STP-Flex .036 I 
Total 0.245           .245    13.362   
Detailed Des 0.245           .245     
Construction               13.203   
ROW Aquis'n               .123   
ROW Incid.               .036   
Agency: NYSDOT
Func. Class: UmA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA108















1085.42
Recon/Cap
1993-98
Balltown Road, from Riverview Road to Aqueduct Road: Corridor Improvements

1) Four-lane Rexford Bridge, with multi-use pathway, and shoulders

2) Roadway: two travel lanes and a third center turn lane. A roundabout at the NY 146/Aqueduct Road intersection.

3) New dedicated multi-use path will connected to the Mohawk-Hudson Trail.

The funds for the linkage study that was to be funded via this project have been folded back into this project to ensure context sensitive solutions.

Funding is split with S96.
Multiple, County, 1.61 Cl-Mi (Incl. S96)
NHPP-NY 13.500 13.500 C
State 1.500 1.500 D
Total 15.000   1.500    13.500           
Construction 13.500     13.500           
Detailed Des 1.500   1.500             
Agency: NYSDOT
Func. Class: UPA
Plan Ref.: Ball
EIS Required
AQ Status: Non-Exempt
SA134


1821.66
CapitalVeh
1997-02
Replacement Buses for CDTA and Northway Express Service

This is for three buses in 2009-10.

Funding was changed to STP-Flex upon CMAQ termination.
Multiple, County
STP-Flex   2.750 V
Total               2.750   
Vehicles               2.750   
Agency: CDTA
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA136


1754.57
Bike/Ped
1997-02
Saratoga Springs Downtown Pedestrian Improvements

To be coordinated with SA131 & SA160 from the 2003-08 TIP.

As of 5/4/11 this project is not capped.
Saratoga Springs, City
STP-SMU   .560 C
Total   .560               
Construction   .560               
Agency: City
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA152

1116.43
Bridge R/R
1997-02
NY 9N Bridge over the Hudson River: Bridge Replacement or Repair

The cost is split between CDTC and AGFTC. The cost shown is half the total cost.
Hadley, State
Total                
Agency: NYSDOT
Func. Class: RmA
Plan Ref.: GOP
No EIS Required
AQ Status: Exempt
SA185
1188.31
Resurface
2001-06
NY 67 from I-87 to NY 50: Resurfacing



Multiple, State
State 15.883 15.883 C
Total 15.883     15.883           
Construction 15.883     15.883           
Agency: NYSDOT
Func. Class: RPA
Plan Ref.: GOP
No EIS Required
AQ Status: Exempt
SA201





1756.60
Safety
2003-08
Ballston Avenue, from Lincoln Avenue to Hamilton Street: Safety Improvements

Reconstruction with a left turn lane, curb realignment, traffic signal replacement, sidewalks and streetscaping.

R phase increased by NYSDOT.
Saratoga Springs, City
STP-Flex 0.590 .050 D
STP-Flex .540 C
Safety 1.788 .150 R
Safety .035 I 
Safety .138 D 1.638 C
Total 2.378 .173    2.378             
Detailed Des 0.050 .138    .050             
Construction 2.178   2.178             
ROW Aquis'n 0.150   .150             
ROW Incid.   .035               
Agency: City
Func. Class: UPA
Plan Ref.: ITS
No EIS Required
AQ Status: Exempt
SA214
1722.05
Resurface
2005-10
I-87, Exit 13 to Exit 15: Resurfacing

Related Project: SA242.

Multiple, State
NHPP 0.452 .286 P .166 D 14.096 C
Total 0.452     .286    .166        14.096   
Prelim. Des. 0.286     .286           
Detailed Des 0.166       .166         
Construction               14.096   
Agency: NYSDOT
Func. Class: UI
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA217















1757.36
Bike/Ped
2005-10
Crescent Road Bike and Pedestrian Improvements

Construct an 8 foot wide multi-use path on Crescent Road, from Moe Road to Lapp Road. Also construct sidewalks, crosswalks and bicycle facilities to Dunsbach Road. The Towns of Halfmoon and Clifton Park are co-sponsors.

NYSDOT will pay the match on the NHPP funds.

The $0.061M funding is for 2 spot imp. projects (Crescent Road-Okte School Crossing and Cresent-Lapp-Southbury Intersection). They were funded from RG41 from the 2005-08 period.

NYSDOT moved $19k from R to D.
Multiple, Town
NHPP 0.479 .479 C
CMAQ 1.183 .019 D
CMAQ .171 R
CMAQ .056 I  .993 C
Total 1.662 .056    1.662             
Construction 1.472   1.472             
Detailed Des 0.019   .019             
ROW Aquis'n 0.171   .171             
ROW Incid.   .056               
Agency: Town
Func. Class: UmA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA222



1757.09
BridgeMisc
2005-10
CR 45 (Northline Road) Bridge over Kayderosseras: Element Specific Bridge Repair

NYSDOT moved 37K from C to D and corrected the fund source.

Construction was funded from RG126.
Malta, County, NA
STP-Flex 1.075 .037 D 1.075 C
Total 1.075 .037      1.075           
Detailed Des   .037               
Construction 1.075     1.075           
Agency: County
Func. Class: UC
Plan Ref.: GOP
No EIS Required
AQ Status: Exempt
SA223
1757.10
Br.Replace
2005-10
US 4 (Central Avenue) Bridge Over the Anthony Kill: Bridge Replacement

The amount shown is for actual construction obligation
Mechanicville, County, NA
STP-Flex 2.833 .114 D 2.833 C
Total 2.833 .114    2.833             
Detailed Des   .114               
Construction 2.833   2.833             
Agency: County
Func. Class: UC
Plan Ref.: GOP
No EIS Required
AQ Status: Exempt
SA225




















1757.54
Reconst'n
2005-10
Round Lake Road Traffic and Mobility Improvements

Includes bike/ped accommodations between East Line Road and the Round Lake Bypass roundabout. Intersection capacity and operational improvements would be constructed at Chango Drive and at Ruhle Road. Also, access management improvements, advance storm water management and street-scaping.

A total of $9.251M was available for this project and has all been programmed. Programming is considered when scope and limits are defined for CDTC to amend its TIP air quality conformity determination. Projects SA226 & SA227 were funded through this project. SA228 is related.

DOT moved 50k from I to D, and 58K from C to R.

R & C Rolled-over
Multiple, County, TBD
Demo. 4.745 .300 D 4.486 C
Demo. .176 P .209 R
Demo. .055 I  .050 D
Total 4.745 .531    .050    4.695           
Detailed Des 0.050 .300    .050             
Construction 4.486     4.486           
Prelim. Des.   .176               
ROW Aquis'n 0.209     .209           
ROW Incid.   .055               
Agency: County
Func. Class: NA
Plan Ref.: Luther
No EIS Required
AQ Status: Exempt
SA233
1722.23
Bridge R/R
2007-12
NY 50 Bridge over I-87: Bridge Rehabilitation or Repair


Saratoga Springs, State
NHPP 2.750 2.750 C
SDF 1.911 1.911 C
Total 4.661   4.661             
Construction 4.661   4.661             
Agency: NYSDOT
Func. Class: UPE
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA239
1757.75
Bike/Ped
2005-10
Town of Milton Sidewalks & Curbs

Federal funding is 80%, with a maximum $1.360M federal share.
Milton, Town
STP-Enh.   1.250 C
Total   1.250               
Construction   1.250               
Agency: Town
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA242

1722.30
Resurface
2007-12
I-87, Exit 10 to Exit 13: Resurfacing

Related Project: SA214.



Multiple, State
NHPP   .171 D
NHPP 7.948 C
NHPP .253 P
Total               8.372   
Detailed Des               .171   
Construction               7.948   
Prelim. Des.               .253   
Agency: NYSDOT
Func. Class: UI
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA244






1089.64
Bridge R/R
2007-12
US 4 over the Hudson River: Element Specific Bridge Repair

BIN: 4000950

Related Project: SA205 from the 2003-08 TIP.

R246 is the other half of this project.

D was delayed 1 year.
Waterford (V), County
NHPP 2.925 2.725 C
NHPP .200 D
Total 2.925       2.925         
Construction 2.725       2.725         
Detailed Des 0.200       .200         
Agency: NYSDOT
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA257



CDTC.19
CapitalFac
2007-12
Park & Ride Lot at Wilton Mall

This formalizes an agreement with the Wilton Mall to use the parking lot at the mall for park & ride purposes for ten years

This project is a drawndown on RG1.
Wilton, CDTA
CMAQ   .110 F
Total   .110               
Facilities   .110               
Agency: CDTA
Func. Class: NA
Plan Ref.: Multimodal
No EIS Required
AQ Status: Non-Exempt
SA258



1759.16
Safety
2010-15
North Line Road/Old Post Road/Malta Avenue Intersection

Reduce 3 intersections to a single roundabout with new curbs, sidewalks, curb ramps, crosswalks, landscaping, new storm water drainage system and relocation of utility poles
Malta, County
Safety   2.612 C
Safety .088 R
Safety .300 P
Safety .300 D
Total               3.300   
Construction               2.612   
ROW Aquis'n               .088   
Prelim. Des.               .300   
Detailed Des               .300   
Agency: Town
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA259


1759.00
BridgeMisc
2010-15
Staffords Road CR 67 over Fish Creek: Element Specific Bridge Repair

Construction was funded from RG126. Bin 3304440

DOT increased C by $0.351M.
Saratoga, County
STP-Urb. 1.759 1.759 C
Total 1.759     1.759           
Construction 1.759     1.759           
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA260

1758.96
BridgeDeck
2010-15
Mott Road over Snook Kill: Bridge Deck Repair

Construction was funded from RG126.

DOT decreased C by $0.041M.
Northumberland, County
STP-Br. 0.481 .481 C
Total 0.481     .481           
Construction 0.481     .481           
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA261
1758.97
Bridge R/R
2010-15
North Main Street over Anthony Kill: Bridge Replacement or Repair

Bin 2202940
Mechanicville, City
STP-Urb. 1.880 1.830 C
STP-Urb. .050 R
Total 1.880   1.880             
Construction 1.830   1.830             
ROW Aquis'n 0.050   .050             
Agency: City
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA262

1758.94
Bridge R/R
2010-15
Frances Street over Anthony Kill: Bridge Replacement or Repair

Bin 2202950

DOT inreased ROW by $0.208M.
Mechanicville, City
STP-Br. 3.093 2.460 C
STP-Br. .075 D
STP-Br. .558 R
Total 3.093   3.093             
Construction 2.460   2.460             
Detailed Des 0.075   .075             
ROW Aquis'n 0.558   .558             
Agency: City
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA267
1808.71
R&P
2007-12
Pavement Management Projects at Saratoga National Park FFY 12-13


Stillwater (T), State
PLH   3.100 C
Total   3.100               
Construction   3.100               
Agency: NYSDOT
Func. Class:
Plan Ref.:
No EIS Required
AQ Status: Exempt
SA270
1933.19
Safety
2010-15
Grade Crossing Signal Upgrade: Park Avenue


Mechanicville, City
Rail   .200 C
Total   .200               
Construction   .200               
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA272
1759.59
Bike/Ped
2010-15
Geyser Road Sidewalks

City of Saratoga Springs

Saratoga Springs, City
SRTS 0.247 .247 C
Total 0.247   .247             
Construction 0.247   .247             
Agency: City
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA273
1759.60
Bike/Ped
2010-15
Round Lake Road Sidewalks

Town of Malta

The funds have rolled-over.
Malta, Town
SRTS 0.250 .250 C
Total 0.250     .250           
Construction 0.250     .250           
Agency: Town
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA274
1759.61
Bike/Ped
2010-15
Pruyn Hill Sidewalks



Halfmoon, Town
SRTS 0.259 .259 C
Total 0.259   .259             
Construction 0.259   .259             
Agency: Town
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA275
1759.57
Bike/Ped
2010-15
Driver Speed Feedback Signs




Stillwater (V), Village
SRTS 0.015 .015 C
Total 0.015   .015             
Construction 0.015   .015             
Agency: Village
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA276



1933.22
Safety
2013-18
White’s Beach Road Rail Crossing

Installation of grade crossing warning devices, flashers and gates at a new rail crossing location at Whites Beach Road

P was taken from C by NYSDOT
Ballston, State
Rail 0.330 .315 C
Rail .015 P
Total 0.330   .330             
Construction 0.315   .315             
Prelim. Des. 0.015   .015             
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA277


1SB1.32
Miscellan
2013-18
Mohawk Towpath National Scenic Byway: Improved Recreational Access to the Vischer Ferry Nature and Historic Preserve

The PIN changed on 12/28/15 from 1SB9.05.
, State
Byways 0.521 .521 F
Total 0.521   .521             
Facilities 0.521   .521             
Agency: NYSDOT
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA278
1SB6.04
Miscellan
2013-18
Lakes to Locks Passage: Canal Region Gateway Visitor Center


, State
Byways 0.438 .438 F
Local 0.497 .497 F
Total 0.935   .935             
Facilities 0.935   .935             
Agency: NYSDOT
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA279
1759.70
Bike/Ped
2013-18
North Central Avenue Pedestrian Safety Project

C rolledover.

Mechanicville, City
STP-Enh. 0.500 .054 D
STP-Enh. .040 R .406 C
Total 0.500   .094      .406         
Detailed Des 0.054   .054             
ROW Aquis'n 0.040   .040             
Construction 0.406       .406         
Agency: City
Func. Class: NA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA280




1759.83
Traff Op'n
Geyser Road (CR 43)/Ballston Avenue (NY 50) Intersection

At West Entrance to Spa State Park.

Traffic signal only.

This project was funded via RG39. C rolledover.
Saratoga Springs, City
STP-Flex 0.185 .015 P
STP-Flex .010 D .160 C
Total 0.185       .025    .160       
Prelim. Des. 0.015       .015         
Detailed Des 0.010       .010         
Construction 0.160         .160       
Agency: City
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA281




1759.84
Traff Op'n
2013-18
Sitterly Road at Woodin Road and Crossings Boulevard

Traffic signal only. Replace existing signals with updated, interconnected signal hardware.

This project was funded via RG39. C rolledover.
Multiple, Multiple
STP-Flex 0.132 .010 P
STP-Flex .007 D .115 C
Total 0.132       .017    .115       
Prelim. Des. 0.010       .010         
Detailed Des 0.007       .007         
Construction 0.115         .115       
Agency: Town
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA282
1759.85
Bike/Ped
2013-18
Malta "Share the Road" Signage

C rolledover.

Malta, Town
STP-Flex 0.015 .015 C
Local 0.003 .003 P
Total 0.018       .018         
Construction 0.015       .015         
Prelim. Des. 0.003       .003         
Agency: Town
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA283

1759.86
R&P
2013-18
Sitterly Road from US 9 to Clifton Park Town Line : Mill & Fill

This project was funded as a drawdown on RG125.

Halfmoon, Town, 0.82 clm
STP-Urb. 0.425 .035 P
STP-Urb. .030 D
STP-Urb. .360 C
Total 0.425       .425         
Prelim. Des. 0.035       .035         
Detailed Des 0.030       .030         
Construction 0.360       .360         
Agency: Town
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA284
1933.04
Safety
2013-18
Grade Crossing Upgrade: Clifton Street/CP Rail

Installation of new automatic flashing lights and gates
Waterford (T), Town, NA
Rail 0.300 .300 C
Total 0.300   .300             
Construction 0.300   .300             
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA285
1933.19
Safety
2013-18
Grade Crossing Upgrade: Park Avenue/CP Rail

Installation of new automatic flashing lights and gates
Mechanicville (C), City, NA
Rail 0.300 .015 P
Rail .285 C
Total 0.300   .300             
Prelim. Des. 0.015   .015             
Construction 0.285   .285             
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA286
1933.25
Safety
2013-18
Grade Crossing Upgrade: CR 110 (High Mills)/CP Rail

Installation of new automatic flashing lights and gates
Clifton Park (T), Town, NA
Rail 0.300 .015 P
Rail .285 C
Total 0.300   .300             
Prelim. Des. 0.015   .015             
Construction 0.285   .285             
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA287
1933.28
Safety
2013-18
Grade Crossing Upgrade: Edie Road/CP Rail

Installation of new automatic flashing lights and gates
Wilton (T), Town, NA
Rail 0.300 .015 P
Rail .285 C
Total 0.300     .300           
Prelim. Des. 0.015     .015           
Construction 0.285     .285           
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA288
1933.31
Safety
2013-18
Grade Crossing Upgrade: Washington Street/CP Rail

Installation of new automatic flashing lights and gates
Watervliet (C), City, NA
Rail 0.300 .015 P
Rail .285 C
Total 0.300     .300           
Prelim. Des. 0.015     .015           
Construction 0.285     .285           
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA289
1933.32
Safety
2013-18
Grade Crossing Upgrade: Pierce Road/CP Rail

Installation of new automatic flashing lights and gates
Clifton Park (T), Town, NA
Rail 0.300 .015 P
Rail .285 C
Total 0.300     .300           
Prelim. Des. 0.015     .015           
Construction 0.285     .285           
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA290
1760.11
Bike/Ped
2013-18
Geyser Road Spa State Park Bicycle and Pedestrian Trail



Saratoga Springs, City
Local 0.249 .150 P .099 C
TAP 2.000 .080 R 1.920 C
Total 2.249   .150      .080    2.019       
Prelim. Des. 0.150   .150             
Construction 2.019         2.019       
ROW Aquis'n 0.080       .080         
Agency: City
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA291


1760.06
BridgeMisc
2013-18
NY 67 Bridge over B&M: Element Specific Bridge Repair

BIN 1071940

This is a drawdown on RG126. DOT advanced the funding 1 year.
Mechanicville, City
STP-Flex 1.870 1.870 C
Total 1.870     1.870           
Construction 1.870     1.870           
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA292



1760.14
BridgeMisc
2013-18
Zim Smith Trail Bike/Ped Bridge Over NY 9: Element Specific Bridge Repair

BIN 7005610

This is a drawdown on RG126. C was deferred one year.
Clifton Park, County
NHPP 0.737 .006 P .005 P
NHPP .677 C
NHPP .004 D .045 D
Total 0.737     .010    .727         
Prelim. Des. 0.011     .006    .005         
Construction 0.677       .677         
Detailed Des 0.049     .004    .045         
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA293
1933.35
Safety
2013-18
Grade Crossing Upgrade: Antone Mountain Road



, State
Rail 0.175 .010 P
Rail .165 C
SDF 0.016 .016 C
Total 0.191       .191         
Prelim. Des. 0.010       .010         
Construction 0.181       .181         
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA294
1933.36
Safety
2013-18
Grade Crossing Upgrades: Various Locations in the Towns of Greenfield and Corinth

Replace current flashing lights with LED lighting and replace the gate arms.
, State
Rail 0.145 .010 P
Rail .135 C
SDF 0.013 .013 C
Total 0.158       .158         
Prelim. Des. 0.010       .010         
Construction 0.148       .148         
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA300










1722.44
Bridge R/R
2016-21
Bundled Bridge Removals & Replacements

Renewal or Replacement: 1) East High St. over I-87 BIN 1033300 2) Crescent Ave. over I-87 BIN 1033340

Removals: 1) Nelson Ave. Ext. over I-87, 1033330 2) Nelson Ave. Ext. over I-87, 1095940

Bridges are in Malta & Saratoga Springs

This project was added as a new project to the 2016-21 TIP, but needed the below funding in the 2013-16 TIP.
Multiple, State
NHPP 1.700 .050 I 
NHPP .450 R
NHPP .400 P
NHPP .800 D
Total 1.700       1.700         
ROW Incid. 0.050       .050         
ROW Aquis'n 0.450       .450         
Prelim. Des. 0.400       .400         
Detailed Des 0.800       .800         
Agency: NYSDOT
Func. Class: Mult
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
SA303
1933.37
Safety
2013-18
Grade Crossing Upgrade: Coons Crossing Road at CP Rail Crossing

Install new active warning devices, lights & gates
Halfmoon, Town
Rail 0.250 .025 P
Rail .225 C
Local 0.085 .085 C
Total 0.335         .335       
Prelim. Des. 0.025         .025       
Construction 0.310         .310       
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt