Address : One Park Place Albany, NY 12205-1606

Phone : (518) 458-2161 | Email: cdtc@cdtcmpo.org

2013-18 TIP TIP Number S188 (PIN 1758.00) < TIP # > | < PIN >
All funds are in matched millions of dollars.
This listing includes the amendment for this project of 03/14 .
This project is based on the project fact sheet used in the 2007-12 TIP Update.

Project Listings |  Interactive Map |  Previous Online TIP's

Project Description

Erie Boulevard/Jay Street/Nott Street/Front Street Roundabout

This was programmed as a top candidate for a roundabout. Final design depends on the project design process.

The 2-lane roundabout includes pedestrian accommodations, drainage improvements and redesign of adjacent parking lot.

This project was funded via RG104.

The funds in 14-15 were added by DOT.




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source 2012-13
(Oblig'd)
2013-14
(1st Year)
2014-15
(2nd Year)
2015-16
(3rd Year)
2016-17
(4th Year)
2017-18
(5th Year)
Post '18

NHPP

0 1.081 C 0 0 0 0 0

CMAQ

0.015 I 2.569 C 0.037 D 0 0 0 0

CMAQ

0.270 P 0.140 R 0 0 0 0 0

CMAQ

0 0.085 D 0 0 0 0 0

Total

0.285 3.875 0.037 0 0 0 0



Funding Totals by Phase

Phase Five-Year Funding (2013-14 thru 2017-18) Six-Year Funding (2012-13 thru 2017-18)

Engineering

0.122

0.392

Right-of-Way

0.140

0.155

Construction

3.650

3.650

Total

3.912

4.197




Other Information

TIP Number: S188 First TIP: 2007-12
PIN: 1758.00 Func. Class: UmA
Project Type: Traff Op'n Length: NA
Jurisdiction: City Plan Ref.: NV
Location: Schenectady No EIS Required
Implementer: City Air Quality: Exempt





CDTC Home Page