R175
|
1754.51 |
Traff Op'n |
1997-02 |
|
ITS Signal Upgrades at Two Locations on Broadway between US 20 to Broadway Viaduct Bridge
Coordinated with project: R254.
This project was deleted from the TIP
|
Rensselaer, City |
|
Total |
  |
  |
  |
  |
  |
  |
  |
  |
|
Agency: City
Func. Class: UPA
Plan Ref.: ITS
No EIS Required
AQ Status: Exempt
|
|
|
R184
|
1130.60 |
Br.Replace |
10/04 |
|
NY 22 Bridge over the Walloomsac River: Bridge Replacement
|
Hoosick, State |
|
Flex-NY |
  |
|
|
|
|
|
|
8.100 C |
SDF |
  |
.200 D |
|
|
|
|
|
|
SDF |
|
.700 P |
|
|
|
|
|
|
Total |
  |
.900    |
  |
  |
  |
  |
  |
8.100    |
Construction |
  |
  |
  |
  |
  |
  |
  |
8.100    |
Detailed Des |
  |
.200    |
  |
  |
  |
  |
  |
  |
Prelim. Des. |
  |
.700    |
  |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: RmA
Plan Ref.: GOP
No EIS Required
AQ Status: Exempt
|
|
|
R188 |
1335.18 |
Bridge R/R |
1997-02 |
|
NY 40 Bridge over Hoosick River: Bridge Replacement or Repair
|
Schaghticoke (V), State |
|
NHPP |
  |
16.507 C |
|
|
|
|
|
|
Total |
  |
16.507    |
  |
  |
  |
  |
  |
  |
Construction |
  |
16.507    |
  |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: RmA
Plan Ref.: GOP
No EIS Required
AQ Status: Exempt
|
|
|
R195
|
1754.59 |
New Cons'n |
1997-02 |
|
South Troy Industrial Park Road
Construct a new two-lane road through the South Troy Industrial Park to Adams Street, including sidewalks and bike lanes.
NYSDOT authorized R funds to come from construction.
|
Troy, City, 4000 feet |
|
STP-Flex |
5.748 |
|
|
|
.450 D |
|
4.850 C |
|
STP-Flex |
|
|
|
.085 I  |
.150 R |
|
|
|
STP-Flex |
|
|
.213 P |
|
|
|
|
|
Total |
5.748 |
  |
.213    |
.085    |
.600    |
  |
4.850    |
  |
Detailed Des |
0.450 |
  |
  |
  |
.450    |
  |
  |
  |
Construction |
4.850 |
  |
  |
  |
  |
  |
4.850    |
  |
ROW Incid. |
0.085 |
  |
  |
.085    |
  |
  |
  |
  |
ROW Aquis'n |
0.150 |
  |
  |
  |
.150    |
  |
  |
  |
Prelim. Des. |
0.213 |
  |
.213    |
  |
  |
  |
  |
  |
|
Agency: City
Func. Class: UC
Plan Ref.: NV
May Require EIS
AQ Status: Non-Exempt
|
|
|
R196
|
1754.68 |
Bridge R/R |
1997-02 |
|
CR 111 (Pitts-Johns Road) Bridge over the Hoosick River: Bridge Restoration or Repair
Includes restoration of the historic bridge to allow pedestrian access only and to build a new bridge for vehicles.
ROW rolled over and split into I & R. Const. was used as an offset.
$0.244M D and $0.007M R was added by NYSDOT.
|
Pittstown, County |
|
STP-Br. |
5.211 |
.273 D |
4.900 C |
.244 D |
|
|
|
|
STP-Br. |
|
|
.033 I  |
|
|
|
|
|
STP-Br. |
|
|
.034 R |
|
|
|
|
|
Total |
5.211 |
.273    |
4.967    |
.244    |
  |
  |
  |
  |
Detailed Des |
0.244 |
.273    |
  |
.244    |
  |
  |
  |
  |
Construction |
4.900 |
  |
4.900    |
  |
  |
  |
  |
  |
ROW Incid. |
0.033 |
  |
.033    |
  |
  |
  |
  |
  |
ROW Aquis'n |
0.034 |
  |
.034    |
  |
  |
  |
  |
  |
|
Agency: County
Func. Class: RL
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R198
|
1754.70 |
Bike/Ped |
1997-02 |
|
New Sidewalks on the West Side of Brookside Avenue
Related Project: R240.
As of 5/4/11 this project is not capped.
|
North Greenbush, Town, 0.36 Cl-Mi |
|
STP-Flex |
  |
.205 C |
|
|
|
|
|
|
Total |
  |
.205    |
  |
  |
  |
  |
  |
  |
Construction |
  |
.205    |
  |
  |
  |
  |
  |
  |
|
Agency: Town
Func. Class: UC
Plan Ref.: Bike
No EIS Required
AQ Status: Exempt
|
|
|
R238 |
1043.34 |
Bridge R/R |
2003-08 |
|
US 9 over NY 9J and 9 over AMTRAK & CSX: Element Specific Bridge Repair
|
Rensselaer, State |
|
NHPP |
7.808 |
|
|
.245 D |
7.563 C |
|
|
|
SDF |
0.250 |
|
.250 P |
|
|
|
|
|
Total |
8.058 |
  |
.250    |
.245    |
7.563    |
  |
  |
  |
Detailed Des |
0.245 |
  |
  |
.245    |
  |
  |
  |
  |
Construction |
7.563 |
  |
  |
  |
7.563    |
  |
  |
  |
Prelim. Des. |
0.250 |
  |
.250    |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R240 |
1755.20 |
Bridge R/R |
2003-08 |
|
Brookside Avenue over Wynantskill: Bridge Replacement or Repair
Related Project: R198.
|
North Greenbush, Town |
|
STP-Flex |
  |
1.092 C |
|
|
|
|
|
|
Total |
  |
1.092    |
  |
  |
  |
  |
  |
  |
Construction |
  |
1.092    |
  |
  |
  |
  |
  |
  |
|
Agency: Town
Func. Class: UC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R242
|
1756.37 |
Br.Replace |
2003-08 |
|
Spring Avenue Over Poestenkill: Bridge Replacement
Minor cost changes and C increase of $0.452 were made by NYSDOT.
|
Troy, City |
|
STP-Flex |
3.679 |
|
3.230 C |
|
|
|
|
|
STP-Flex |
|
.022 I  |
.041 I  |
|
|
|
|
|
STP-Flex |
|
|
.048 D |
|
|
|
|
|
STP-Flex |
|
|
.360 R |
|
|
|
|
|
Total |
3.679 |
.022    |
3.679    |
  |
  |
  |
  |
  |
Construction |
3.230 |
  |
3.230    |
  |
  |
  |
  |
  |
ROW Incid. |
0.041 |
.022    |
.041    |
  |
  |
  |
  |
  |
Detailed Des |
0.048 |
  |
.048    |
  |
  |
  |
  |
  |
ROW Aquis'n |
0.360 |
  |
.360    |
  |
  |
  |
  |
  |
|
Agency: City
Func. Class: UC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R246
|
1089.64 |
Bridge R/R |
2003-08 |
|
US 4 over the Hudson River: Element Specific Bridge Repair
BIN: 4000950
Related Project: SA205 from the 2003-08 TIP.
SA244 is the other half of this project.
D was delayed 1 year.
|
Troy, State |
|
NHPP |
2.925 |
|
|
|
2.725 C |
|
|
|
NHPP |
|
|
|
|
.200 D |
|
|
|
Total |
2.925 |
  |
  |
  |
2.925    |
  |
  |
  |
Construction |
2.725 |
  |
  |
  |
2.725    |
  |
  |
  |
Detailed Des |
0.200 |
  |
  |
  |
.200    |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R248
|
1756.96 |
Bike/Ped |
2003-08 |
|
9th Street Gateway Streetscape
Replace sidewalks and accessory stairs on the east side of 9th Street between Sage Avenue and Peoples Avenue
This project was funded via RG41 from the 2003-06 period.
The project was removed from the TIP on 2/12/14.
|
Troy, City |
|
Total |
  |
  |
  |
  |
  |
  |
  |
  |
|
Agency: City
Func. Class: UL
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R249
|
1756.97 |
Bike/Ped |
2003-08 |
|
First Alley Connector Sidewalk
This sidewalk along First Alley will connect residential and commercial areas in the City of Rensselaer.
This project was funded via RG41 from the 2003-06 period.
|
Rensselaer, City |
|
CMAQ |
  |
.041 C |
|
|
|
|
|
|
Total |
  |
.041    |
  |
  |
  |
  |
  |
  |
Construction |
  |
.041    |
  |
  |
  |
  |
  |
  |
|
Agency: City
Func. Class: UL
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R254
|
1757.15 |
Reconst'n |
2005-10 |
|
Broadway, from US 20 to Broadway Viaduct Bridge: Reconstruction
This includes storm & water sewer separation, signals, pedestrian amenities, drainage, curbs, sidewalks, period lights and landscaping.
Related project: R175 & R243.
To be let with R243.
|
Rensselaer, City, 2.0 Ln-Mi |
|
NHPP |
  |
3.671 C |
|
|
|
|
|
|
Total |
  |
3.671    |
  |
  |
  |
  |
  |
  |
Construction |
  |
3.671    |
  |
  |
  |
  |
  |
  |
|
Agency: City
Func. Class: UmA
Plan Ref.: HWY Cond
No EIS Required
AQ Status: Exempt
|
|
|
R255
|
1757.35 |
Bike/Ped |
2005-10 |
|
Route 20 Corridor Bike/Ped Improvements
This includes improvements such as: pedestrian signals, pedestrian refuge, sidewalks, widened bike lanes, restriping travel lanes and a park and ride lot.
As of 5/4/11 this project is not capped.
This project is related to R262.
|
Rensselaer, City |
|
CMAQ |
0.854 |
|
.827 C |
|
|
|
|
|
CMAQ |
|
|
.027 D |
|
|
|
|
|
Total |
0.854 |
  |
.854    |
  |
  |
  |
  |
  |
Construction |
0.827 |
  |
.827    |
  |
  |
  |
  |
  |
Detailed Des |
0.027 |
  |
.027    |
  |
  |
  |
  |
  |
|
Agency: City
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R257
|
1755.36 |
Bridge R/R |
2005-10 |
|
NY 151 over East Street: Element Specific Bridge Repair
NY 43 was renamed NY 151 at this location.
C rolledover. D was taken from C by NYSDOT authority.
|
Rensselaer, City |
|
STP-Urb. |
3.800 |
|
|
|
3.800 C |
|
|
|
Total |
3.800 |
  |
  |
  |
3.800    |
  |
  |
  |
Construction |
3.800 |
  |
  |
  |
3.800    |
  |
  |
  |
|
Agency: City
Func. Class: UmA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R260
|
1757.21 |
Bridge R/R |
2005-10 |
|
Sand Bank Road Bridge over the Little Hoosic River: Bridge Replacement or Repair
|
Berlin, County |
|
STP-Br. |
0.934 |
.155 D |
|
|
|
|
|
|
STP-Br. |
|
.027 I  |
|
|
|
|
|
|
STP-Br. |
|
.075 P |
.934 C |
|
|
|
|
|
Total |
0.934 |
.257    |
.934    |
  |
  |
  |
  |
  |
Detailed Des |
  |
.155    |
  |
  |
  |
  |
  |
  |
ROW Incid. |
  |
.027    |
  |
  |
  |
  |
  |
  |
Prelim. Des. |
  |
.075    |
  |
  |
  |
  |
  |
  |
Construction |
0.934 |
  |
.934    |
  |
  |
  |
  |
  |
|
Agency: County
Func. Class: RL
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R261
|
1757.22 |
Bridge R/R |
2005-10 |
|
Elm Street Bridge over the Little Hoosick River: Bridge Replacement or Repair
NYSDOT added the D, I & R phases.
|
Berlin, County |
|
STP-Flex |
  |
1.324 C |
|
|
|
|
|
|
STP-Br. |
  |
.008 D |
|
|
|
|
|
|
STP-Br. |
|
.006 I  |
|
|
|
|
|
|
STP-Br. |
|
.029 R |
|
|
|
|
|
|
Total |
  |
1.367    |
  |
  |
  |
  |
  |
  |
Construction |
  |
1.324    |
  |
  |
  |
  |
  |
  |
Detailed Des |
  |
.008    |
  |
  |
  |
  |
  |
  |
ROW Incid. |
  |
.006    |
  |
  |
  |
  |
  |
  |
ROW Aquis'n |
  |
.029    |
  |
  |
  |
  |
  |
  |
|
Agency: County
Func. Class: RL
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R266 |
1528.63 |
Bridge R/R |
2007-12 |
|
I-90 Bridges over the Moordenerkill: Rehabilitations or Repairs
|
Schodack, State |
|
NHPP |
  |
4.783 C |
|
|
|
|
|
|
Total |
  |
4.783    |
  |
  |
  |
  |
  |
  |
Construction |
  |
4.783    |
  |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: UI
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R268 |
1528.68 |
Bridge R/R |
2007-12 |
|
Patroon Island Bridge: Bridge Rehabilitation or Repair
Funding is split with A491.
|
Multiple, State |
|
NHPP-NY |
  |
68.200 C |
|
|
|
|
|
|
Total |
  |
68.200    |
  |
  |
  |
  |
  |
  |
Construction |
  |
68.200    |
  |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class:
Plan Ref.:
AQ Status: Exempt
|
|
|
R277
|
1757.96 |
Bike/Ped |
2007-12 |
|
Lansingburgh Sidewalks
Pedestrian improvements along 116th St., 114th St., 113th St., and bicycle connections between 114th St. from Gurley Avenue to 2nd Ave.
As of 5/4/11 this project is not capped.
This project was funded via RG103 and was changed to STP-Flex upon CMAQ termination.
|
Troy, City, 675 linear feet |
|
STP-Flex |
  |
|
|
|
|
|
|
.097 C |
STP-Flex |
|
|
|
|
|
|
|
.031 P |
Total |
  |
  |
  |
  |
  |
  |
  |
.128    |
Construction |
  |
  |
  |
  |
  |
  |
  |
.097    |
Prelim. Des. |
  |
  |
  |
  |
  |
  |
  |
.031    |
|
Agency: City
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R278
|
1757.98 |
Traff Op'n |
2007-12 |
|
126th Street/US 4 (2nd Avenue)
This was programmed as a top candidate for a roundabout. Final design depends on the project design process.
The roundabout includes streetscape improvements and crosswalks.
This project was funded via RG104 and was changed to STP-Flex upon CMAQ termination.
|
Troy, City, NA |
|
STP-Flex |
0.275 |
|
|
|
|
|
.264 P |
1.100 C |
STP-Flex |
|
|
|
|
|
|
.011 I  |
|
Total |
0.275 |
  |
  |
  |
  |
  |
.275    |
1.100    |
Prelim. Des. |
0.264 |
  |
  |
  |
  |
  |
.264    |
  |
Construction |
  |
  |
  |
  |
  |
  |
  |
1.100    |
ROW Incid. |
0.011 |
  |
  |
  |
  |
  |
.011    |
  |
|
Agency: City
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R279
|
1757.99 |
Traff Op'n |
2007-12 |
|
US 4/Mannix Road Roundabout
This was programmed as a top candidate for a roundabout. Final design depends on the project design process.
The roundabout includes sidewalks, drainage, curbing, lighting, and signage.
This project is capped by 2/1/12 amendment.
This project was funded via RG104. The cost reflects the awarded contract.
|
East Greenbush, Town, NA |
|
Safety |
  |
1.101 C |
|
|
|
|
|
|
CMAQ |
  |
.742 C |
|
|
|
|
|
|
Local |
  |
.688 C |
|
|
|
|
|
|
Total |
  |
2.531    |
  |
  |
  |
  |
  |
  |
Construction |
  |
2.531    |
  |
  |
  |
  |
  |
  |
|
Agency: Town
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R280
|
1758.05 |
Traff Op'n |
2007-12 |
|
Signal Improvements on Pawling Avenue
Includes controllers for 8 signals.
This project funded via RG39.
Related Projects: R219 & R244.
|
Troy, City |
|
CMAQ |
1.135 |
.065 P |
1.135 C |
|
|
|
|
|
CMAQ |
|
.060 D |
|
|
|
|
|
|
Total |
1.135 |
.125    |
1.135    |
  |
  |
  |
  |
  |
Prelim. Des. |
  |
.065    |
  |
  |
  |
  |
  |
  |
Construction |
1.135 |
  |
1.135    |
  |
  |
  |
  |
  |
Detailed Des |
  |
.060    |
  |
  |
  |
  |
  |
  |
|
Agency: City
Func. Class: UmA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R287 |
1758.15 |
Bridge R/R |
2007-12 |
|
CR 68 Over Wynantskill Creek
BIN 3303610
|
Poestenkill, County |
|
STP-Br. |
0.199 |
|
|
|
|
|
.149 D |
1.210 C |
STP-Br. |
|
|
|
|
|
|
.050 P |
|
Total |
0.199 |
  |
  |
  |
  |
  |
.199    |
1.210    |
Detailed Des |
0.149 |
  |
  |
  |
  |
  |
.149    |
  |
Construction |
  |
  |
  |
  |
  |
  |
  |
1.210    |
Prelim. Des. |
0.050 |
  |
  |
  |
  |
  |
.050    |
  |
|
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R289 |
1758.14 |
Bridge R/R |
2007-12 |
|
CR 114 Over Powamppokonk Creek
BIN 3304080
|
Schaghticoke (T), County |
|
STP-Br. |
0.040 |
|
|
|
|
|
.013 P |
.726 C |
STP-Br. |
|
|
|
|
|
|
.027 D |
|
Total |
0.040 |
  |
  |
  |
  |
  |
.040    |
.726    |
Prelim. Des. |
0.013 |
  |
  |
  |
  |
  |
.013    |
  |
Construction |
  |
  |
  |
  |
  |
  |
  |
.726    |
Detailed Des |
0.027 |
  |
  |
  |
  |
  |
.027    |
  |
|
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R292
|
1758.38 |
Reconst'n |
2007-12 |
|
US 4, Couse Corners to Mannix Road: Corridor Improvements
Sidewalks, crosswalks, ADA curb ramps, repaving, bike lanes, raised median, driveway relocation, modified interstate access, new curbing, closed drainage and culverts. Consideration of installation of a two lane roundabout at I-90 EB ramps. Does not include the US 4/Mannix Road and US 4/NY 151 (Couse Corners) intersections.
|
East Greenbush, State, Ln-Mi |
|
STP-Flex |
  |
|
|
|
|
|
|
5.940 C |
STP-Flex |
|
|
|
|
|
|
|
.350 D |
STP-Flex |
|
|
|
|
|
|
|
.050 R |
STP-Flex |
|
|
|
|
|
|
|
.400 P |
Total |
  |
  |
  |
  |
  |
  |
  |
6.740    |
Construction |
  |
  |
  |
  |
  |
  |
  |
5.940    |
Detailed Des |
  |
  |
  |
  |
  |
  |
  |
.350    |
ROW Aquis'n |
  |
  |
  |
  |
  |
  |
  |
.050    |
Prelim. Des. |
  |
  |
  |
  |
  |
  |
  |
.400    |
|
Agency: Town
Func. Class:
Plan Ref.: HWY Cond
No EIS Required
AQ Status: Exempt
|
|
|
R295
|
1759.15 |
Safety |
2010-15 |
|
21st Street Realignment & Hoosick Street/Burdett Avenue Intersection
Hoosick Street/Burdett Avenue intersection to 500 feet north at connection with 21st Street
Realignment of 21st Street to connect to Hoosick/Burdett intersection, 500 feet of new road, sidewalks, replacement of traffic signal and pedestrian pole, relocate bus shelter, access management, utility relocation and new storm drains
|
Troy, City |
|
Safety |
  |
|
|
|
|
|
|
1.015 C |
Safety |
|
|
|
|
|
|
|
.140 P |
Safety |
|
|
|
|
|
|
|
.140 D |
Safety |
|
|
|
|
|
|
|
.075 R |
Total |
  |
  |
  |
  |
  |
  |
  |
1.370    |
Construction |
  |
  |
  |
  |
  |
  |
  |
1.015    |
Prelim. Des. |
  |
  |
  |
  |
  |
  |
  |
.140    |
Detailed Des |
  |
  |
  |
  |
  |
  |
  |
.140    |
ROW Aquis'n |
  |
  |
  |
  |
  |
  |
  |
.075    |
|
Agency: City
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R296
|
1758.93 |
BridgeMisc |
2010-15 |
|
East Road (CR 33) over Kinderhook Creek: Element Specific Bridge Repair
Bin: 3303760
Construction and ROW were funded from RG126.
|
Stephentown, County |
|
STP-Br. |
0.721 |
|
.075 D |
|
|
|
|
|
STP-Br. |
|
|
.075 P |
.021 R |
.550 C |
|
|
|
Total |
0.721 |
  |
.150    |
.021    |
.550    |
  |
  |
  |
Detailed Des |
0.075 |
  |
.075    |
  |
  |
  |
  |
  |
Prelim. Des. |
0.075 |
  |
.075    |
  |
  |
  |
  |
  |
ROW Aquis'n |
0.021 |
  |
  |
.021    |
  |
  |
  |
  |
Construction |
0.550 |
  |
  |
  |
.550    |
  |
  |
  |
|
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R297
|
1758.98 |
BridgeMisc |
2010-15 |
|
Plank Road (CR 126) over the Deepkill: Element Specific Bridge Repair
Bin: 3303510
Construction was funded from RG126.
|
Pittstown, County |
|
STP-Br. |
0.567 |
.091 P |
.017 R |
|
|
.550 C |
|
|
STP-Urb. |
  |
.091 D |
|
|
|
|
|
|
Total |
0.567 |
.182    |
.017    |
  |
  |
.550    |
  |
  |
Prelim. Des. |
  |
.091    |
  |
  |
  |
  |
  |
  |
ROW Aquis'n |
0.017 |
  |
.017    |
  |
  |
  |
  |
  |
Construction |
0.550 |
  |
  |
  |
  |
.550    |
  |
  |
Detailed Des |
  |
.091    |
  |
  |
  |
  |
  |
  |
|
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R298
|
1758.99 |
BridgeMisc |
2010-15 |
|
Preservation of County Bridges
CR 26 over Black Creek (3303840), West Road over Kinderhook Creek (3303780), Black River Road over Black River (2202090), Murdock Road over Tsasawassa Creek (2201870), Dunham Hollow Road over Tsasawassa Creek (3303870), Dunham Hollow Road over Tsasawassa Creek (3303880)
This project was funded from RG126.
|
Stephentown, County |
|
STP-Br. |
1.500 |
|
|
|
1.500 C |
|
|
|
Total |
1.500 |
  |
  |
  |
1.500    |
  |
  |
  |
Construction |
1.500 |
  |
  |
  |
1.500    |
  |
  |
  |
|
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R299
|
1759.04 |
Bridge R/R |
2010-15 |
|
White Church Road over Quackenkill: Bridge Replacement or Repair
Bin: 2201560
DOT increased R by $18k.
|
Brunswick, Town |
|
STP-Br. |
0.878 |
|
.859 C |
|
|
|
|
|
STP-Br. |
|
|
.019 R |
|
|
|
|
|
Total |
0.878 |
  |
.878    |
  |
  |
  |
  |
  |
Construction |
0.859 |
  |
.859    |
  |
  |
  |
  |
  |
ROW Aquis'n |
0.019 |
  |
.019    |
  |
  |
  |
  |
  |
|
Agency: Town
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R300
|
1758.90 |
Bridge R/R |
2010-15 |
|
Broken Wheel Road over Hoosick River: Bridge Replacement or Repair
Bin: 2201740
|
Petersburg, Town |
|
STP-Br. |
1.290 |
.133 D |
1.290 C |
|
|
|
|
|
STP-Br. |
|
.001 R |
|
|
|
|
|
|
STP-Br. |
|
.054 P |
|
|
|
|
|
|
Total |
1.290 |
.188    |
1.290    |
  |
  |
  |
  |
  |
Detailed Des |
  |
.133    |
  |
  |
  |
  |
  |
  |
Construction |
1.290 |
  |
1.290    |
  |
  |
  |
  |
  |
ROW Aquis'n |
  |
.001    |
  |
  |
  |
  |
  |
  |
Prelim. Des. |
  |
.054    |
  |
  |
  |
  |
  |
  |
|
Agency: Town
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R301 |
1759.05 |
Br.Replace |
2010-15 |
|
White Creek Road Bridge: Bridge Replacement
BIN 2201620
|
Hoosick, Town |
|
STP-Br. |
1.063 |
.016 D |
1.050 C |
|
|
|
|
|
STP-Br. |
|
|
.013 R |
|
|
|
|
|
Total |
1.063 |
.016    |
1.063    |
  |
  |
  |
  |
  |
Detailed Des |
  |
.016    |
  |
  |
  |
  |
  |
  |
Construction |
1.050 |
  |
1.050    |
  |
  |
  |
  |
  |
ROW Aquis'n |
0.013 |
  |
.013    |
  |
  |
  |
  |
  |
|
Agency: Town
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R302
|
1759.82 |
Resurface |
2013-18 |
|
Burden Lake Road (CR 51) from NY 43 to First Dyke Road: Resurfacing
Includes sharrows.
County will do all design and construction supervision and be reimbursed for the latter at 6% of construciton cost.
This project was funded as a drawdown on RG125.
C rolled over.
|
Sand Lake, County, 1.72 clm |
|
STP-Urb. |
0.452 |
|
|
|
.452 C |
|
|
|
Total |
0.452 |
  |
  |
  |
.452    |
  |
  |
  |
Construction |
0.452 |
  |
  |
  |
.452    |
  |
  |
  |
|
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R303 |
1932.59 |
Safety |
2013-18 |
|
Grade Crossing Upgrade: Carey Avenue/Pan Am
Installation of new automatic flashing lights and gates
|
Hoosick Falls, Village, NA |
|
Rail |
0.195 |
|
.015 P |
|
|
|
|
|
Rail |
|
|
.180 C |
|
|
|
|
|
Total |
0.195 |
  |
.195    |
  |
  |
  |
  |
  |
Prelim. Des. |
0.015 |
  |
.015    |
  |
  |
  |
  |
  |
Construction |
0.180 |
  |
.180    |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R304 |
1932.60 |
Safety |
2013-18 |
|
Grade Crossing Upgrade: Elm Street /Pan Am
Installation of new automatic flashing lights and gates
|
Hoosick Falls, Village, NA |
|
Rail |
0.355 |
|
.015 P |
|
|
|
|
|
Rail |
|
|
.340 C |
|
|
|
|
|
Total |
0.355 |
  |
.355    |
  |
  |
  |
  |
  |
Prelim. Des. |
0.015 |
  |
.015    |
  |
  |
  |
  |
  |
Construction |
0.340 |
  |
.340    |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R305 |
1932.61 |
Safety |
2013-18 |
|
Grade Crossing Upgrade: Center Street/Pan Am
Installation of new automatic flashing lights and gates
|
Hoosick Falls, Village, NA |
|
Rail |
0.325 |
|
.015 P |
|
|
|
|
|
Rail |
|
|
.310 C |
|
|
|
|
|
Total |
0.325 |
  |
.325    |
  |
  |
  |
  |
  |
Prelim. Des. |
0.015 |
  |
.015    |
  |
  |
  |
  |
  |
Construction |
0.310 |
  |
.310    |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R306 |
1933.26 |
Safety |
2013-18 |
|
Grade Crossing Upgrade: River Street/Pan Am
Installation of new automatic flashing lights and gates
|
Hoosick Falls, Village, NA |
|
Rail |
0.105 |
|
.010 P |
|
|
|
|
|
Rail |
|
|
.095 C |
|
|
|
|
|
Total |
0.105 |
  |
.105    |
  |
  |
  |
  |
  |
Prelim. Des. |
0.010 |
  |
.010    |
  |
  |
  |
  |
  |
Construction |
0.095 |
  |
.095    |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R307 |
1933.27 |
Safety |
2013-18 |
|
Grade Crossing Upgrade: Green Road (CR 95)/Pan Am
Installation of new automatic flashing lights and gates
|
Petersburgh, Town, NA |
|
Rail |
0.340 |
|
.015 P |
|
|
|
|
|
Rail |
|
|
.325 C |
|
|
|
|
|
Total |
0.340 |
  |
.340    |
  |
  |
  |
  |
  |
Prelim. Des. |
0.015 |
  |
.015    |
  |
  |
  |
  |
  |
Construction |
0.325 |
  |
.325    |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
NY 2 Slope Repair at the intersection with Stewart Rd.
This project was added as a new project to the 2016-21 TIP, but needed the below funding in the 2013-18 TIP.
|
Petersburg, State, 2000 ft |
|
STP-Flex |
0.200 |
|
|
|
.200 P |
|
|
|
Total |
0.200 |
  |
  |
  |
.200    |
  |
  |
  |
Prelim. Des. |
0.200 |
  |
  |
  |
.200    |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: Mult
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|