Address : One Park Place Albany, NY 12205-1606

Phone : (518) 458-2161 | Email: cdtc@cdtcmpo.org

TIP Number A525 (PIN 1808.21) < TIP # > | < PIN >
All funds are in matched millions of dollars.
This listing includes the amendment for this project of 03/15 .
This project is based on the project fact sheet used in the 2010-15 TIP Update.

Project Listings |  Clickable Maps |  Previous Online TIP's

Project Description

NY 910D (Washington Avenue Extension), NY 155 to Fuller Road: Reconstruction

Repaving/reconstruction, drainage and safety improvements




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source 2012-13
(Oblig'd)
2013-14
(1st Year)
2014-15
(2nd Year)
2015-16
(3rd Year)
2016-17
(4th Year)
2017-18
(5th Year)
Post '18

NHPP-NY

0 0 10.700 C 0 0 0 0

SDF

0 0.500 D 0 0 0 0 0

Total

0 0.500 10.700 0 0 0 0



Funding Totals by Phase

Phase Five-Year Funding (2013-14 thru 2017-18) Six-Year Funding (2012-13 thru 2017-18)

Engineering

0.500

0.500

Construction

10.700

10.700

Total

11.200

11.200



Other Information

TIP Number: A525 First TIP: 2010-15
PIN: 1808.21 Func. Class: NA
Project Type: Reconst'n Length: Ln-Mi
Jurisdiction: State Plan Ref.: HWY Cond
Location: Albany No EIS Required
Implementer: NYSDOT Air Quality: Exempt





CDTC Home Page