TIP Number |
PIN |
Truncated Description |
RG1
|
CDTC05
|
Park and Ride Lots for Carpools Set-Aside
|
RG15
|
Multiple
|
Durable Pavement Markings Set-Aside
|
RG16
|
1B09.01
|
State Bridge Inspection Set-Aside
|
RG22
|
1B09.02
|
Local Bridge Inspection Set-Aside
|
RG23
|
1808.42
|
Traffic Signal Set-Aside for State Roads
|
RG27
|
1T05.02
|
Travel Demand Management
|
RG28
|
1806.60
|
Intelligent Transportation System (ITS) Implementation Set-Aside
|
RG29
|
1755.63
|
CDTC Technical Services
|
RG31
|
1821.44
|
Corridor Management Initiative
|
RG37
|
1806.61
|
HELP Program
|
RG37A
|
1809.48
|
TMC Operating Costs
|
RG39
|
1T10.06
|
ITS Set-Aside for Local Traffic Signals
|
RG40
|
1T09.94
|
Grade Crossing Safety Improvements Set-Aside
|
RG41
|
Multiple
|
Spot Improvements for Bicycle and Pedestrian Access Set-Aside
|
RG96
|
1RTP.01
|
Recreational Trails Projects
|
RG99
|
1807.03
|
ITS Elements & Transmit Systems for Capital District Interstates
|
RG102
|
CDTC.01
|
Alternative Fuel Retrofit: Non-CDTA Fleets and Off-Road Vehicles Set-Aside
|
RG103
|
1TR7.02
|
Bicycle/Pedestrian Network Set-Aside
|
RG104
|
1TR7.01
|
Intersections, Queue Jumpers & Roundabouts Set-Aside
|
RG105
|
1807.51
|
Safety Set-Aside for Non-State Roads
|
RG106
|
1T10.05
|
Scenic Byways Block Funds
|
RG108
|
|
Preventive Maintenance (1R) on the Local Federal-Aid System
|
RG109
|
CDTC28
|
NY 5 BRT/ADA Compliance
|
RG110
|
1808.05
|
High Function State Bridge Preservation
|
RG111
|
1808.37
|
Bridge Painting For State and Local Bridges
|
RG112
|
1807.77
|
Bridge Repairs On Bridges Rated 5 to 7
|
RG114
|
1807.81
|
Bridge Cleaning
|
RG115
|
1808.30
|
Emergency Demand and Flag Repair
|
RG116
|
|
Goods Movement Set-Aside
|
RG117
|
1808.58
|
Pavement Maintenance Set-Aside
|
RG118
|
1808.56
|
ADA Set-Aside
|
RG119
|
|
Linkage Transition Engineering
|
RG120
|
S937.51.171
|
Empire Corridor Planning Program
|
RG121
|
S937.54.171
|
NY to VT Bi-State Intercity Passenger Rail Program Planning
|
RG122
|
|
Accelerated Pavement Preservation Program
|
RG123
|
|
Accelerated Bridge Program
|
T6A
|
1824.01
|
Elderly and Handicapped Vehicles
|
T6B
|
1820.37
|
STAR Buses Replacement and Expansion
|
T9
|
1820.50
|
Facility Improvements
|
T11
|
1821.18
|
Passenger Facility Improvements at Various Locations
|
T14B
|
CDTC.08
|
Transit Operations Support for Saratoga Service: Preventive Maintenance
|
T16
|
1821.80
|
Transit Support Vehicles
|
T17
|
1820.48
|
Transit Bus Replacement/Expansion
|
T57
|
1TR6.04
|
Preventive Maintenance
|
T59
|
1820.57
|
Replacement Shuttle Vehicles
|
T62
|
1TR6.05
|
Information Systems
|
T64
|
1TR6.06
|
Customer Information Systems
|
T66
|
1823.01
|
Welfare to Work
|
T66A
|
1823.01
|
Welfare to Work in Saratoga Springs
|
T69
|
**
|
NY 5 Bus Rapid Transit (BRT) Vehicles
|
T70
|
CDTC.13
|
NY 5 Bus Rapid Transit (BRT) Stations
|
T72
|
1820.61
|
Safety and Security
|
T74
|
1TR6.02
|
Park & Ride Lots in NY 5 Corridor
|
T75
|
CDTC10
|
Transit Signal Priority on NY 5, Between and in the Cities of Albany
|
T76
|
1824.05
|
Replacement Transit Buses for Saratoga Service
|
T77
|
**
|
Capital Cost of Contracting for Commuter Service in the Capital District to
|
T79
|
CDTC.21
|
New Freedom Transit Service
|
T79A
|
**
|
New Freedom Transit Service In Saratoga Springs
|
T80
|
**
|
NY 9 Corridor Transit Service in Albany and Saratoga Counties
|
T81
|
1935.71
|
Rensselaer Station Capacity Improvements, Phase 2: Installation of a
|
T82
|
**
|
Off-Board Fare Collection System
|
T83
|
CDTC17
|
CDTA Alternative Fuel Retrofit: 24 Buses
|
T84
|
**
|
Saratoga Bus Garage Feasibility Study
|
T85
|
|
Park and Ride Lots Study
|
T86
|
1935.72
|
Rensselaer Station Capacity Improvements, Phase 3: CP 142
|
T87
|
|
Park and Ride Lot Signs
|
T88
|
CDTC11
|
Van Pool Subsidies
|
A240
|
1721.51
|
I-87 Exit 3 or 4 Airport Connector
|
A286
|
B109
|
Old State Road Bridge over the Thruway (Milepost 150.81): Bridge Replacement
|
A290
|
1347.07
|
Selkirk Bypass
|
A295
|
1753.60
|
New Karner Road (NY 155), from US 20 to NY 5: Corridor Improvements
|
A296
|
1753.37
|
Relocation of Maxwell Road Part 1: Albany Shaker Road Intersection
|
A319
|
1528.55
|
I-90, from Thruway to Exit 5A (Bridge over CSX Spur): Rehabilitation of
|
A341
|
1754.45
|
Central Avenue (NY 5), from City Limits to Everett Road: Resurfacing
|
A345
|
1754.49
|
Elm Street Bypass
|
A372
|
1754.04
|
Watervliet Shaker Road, from Karner Road to Albany Shaker Road: Corridor
|
A392
|
1754.91
|
Relocation of Maxwell Road Part 2: Wolf Road Service Road
|
A395
|
1935.52
|
NYSDOT/Amtrak Rail Initiative: Rensselaer to Schenectady Double Track.
|
A400
|
1754.74
|
Old Ravena Road Bridge over CSX: Bridge Replacement or Reconstruction
|
A413
|
1755.76
|
Green Island Bridge Sidewalks
|
A422
|
1756.17
|
Voorheesville Railroad Crossing
|
A423
|
1756.19
|
Carman Road Sidewalks
|
A431
|
1755.19
|
Gifford Hollow Over Switzkill: Bridge Replacement
|
A432
|
1756.35
|
Bridge Avenue Bridge Over Mohawk River: Bridge Replacement
|
A433
|
1756.38
|
CR 53 (Jericho Road) Bridge over CSX Selkirk Yard: Bridge Demolition
|
A434
|
1806.45
|
Washington Avenue over NY 85: Bridge Replacement
|
A435
|
1756.63
|
ITS Transit Signal Priority on Washington and Western Avenues
|
A436
|
1808.01
|
Western Avenue, Fuller Road to Albany City Line: Sidewalk Construction
|
A437
|
1757.38
|
Mohawk-Hudson Bike-Hike Trail: Bridge Rehabilitation
|
A438
|
1756.59
|
19th Street, from City Line to Congress Steet Bridge: Reconstruction
|
A440
|
1756.61
|
Delaware Avenue, from Madison Avenue to Thruway Bridge: Reconstruction
|
A441
|
NA
|
Watervliet Shaker Road & Old Wolf Road: Roundabout
|
A444
|
1756.80
|
Port of Albany Security Improvements
|
A445
|
1756.98
|
Central Avenue Safety Improvements
|
A446
|
1757.03
|
Mohawk-Hudson Bike-Hike Trail from US 9 to Cohoes City Line: Paving
|
A447
|
1757.04
|
McKown Road from Western Avenue to Woodscape Drive: New Sidewalk
|
A448
|
1043.46
|
US 9 over Hudson River (BIN 109302A)
|
A449
|
1045.11
|
NY 378 Bridge Over Hudson River Shore: Rehabilitation
|
A450A
|
1051.53
|
I-787, from Broadway to NY 378: Multi-Course Overlay
|
A451
|
1051.57
|
I-787, NYS Thruway Exit 23 to South Mall Expressway Complex: Resurfacing & Bridge
|
A453
|
1759.22
|
Watervliet Shaker Road, from Karner Road to Albany Shaker Road: Corridor
|
A454
|
H2173.1
|
Thruway Exit 25 (Schenectady): Interim Plaza & Ramp Pavement Rehabilitation
|
A455
|
H2034.1
|
Thruway Exit 23 to Exit 24: Pavement Reconstruction & Mobility Improvements
|
A458
|
H2034.3
|
Thruway Exit 24 to Exit 25: Pavement Reconstruction & Mobility Improvements
|
A460
|
S037.00
|
Operational Subsidy for Container Shipments
|
A461
|
1757.31
|
Intersection of Fuller Road and Washington Avenue
|
A462
|
1T09.16
|
Queue Jumper at the Intersection of Central Avenue and New Karner Road
|
A463
|
1T09.17
|
Queue Jumper at the Intersection of Central Avenue and Wolf Road
|
A464
|
1757.32
|
Helderberg Hudson Rail Trail: Phase 1 (Vooreesville to the Port of Albany)
|
A465
|
1757.33
|
Guilderland Center Pedestrian Safety
|
A466
|
1808.01
|
Westmere Corridor Pedestrian Improvements
|
A467
|
1755.35
|
Grant Hill Road Bridge Over Normanskill: Bridge Replacement
|
A468
|
1051.58
|
I-787 Northbound Ramp to South Mall Expressway, Mainline on Clinton
|
A469
|
1755.34
|
Pictuay Road Bridge Over Coeymans Creek: Bridge Replacement
|
A471
|
1935.57
|
Port of Albany Rehabilitation, Operational Improvments and Maintenance
|
A473
|
1756.86
|
Albany Waterfront/Corning Preserve Improvements
|
A475
|
H1034.3
|
Service Area Truck Parking Expansion: Guilderland, Mohawk and Pattersonville
|
A476
|
1757.41
|
Siena College Perimeter Loop Road
|
A477
|
1758.07
|
Green Island Traffic Signals
|
A478
|
1757.62
|
Euclid Avenue Sidewalks
|
A480
|
1757.64
|
Elsmere Avenue and Feura Bush Road Sidewalks
|
A481
|
1ME0.19
|
State Street, Eagle Street to Broadway: Resurfacing
|
A482
|
1011.12
|
NY 145 Bridge Over Unknown Creek
|
A483
|
1043.46
|
Dunn Memorial Bridge: Monodeck & General Repairs
|
A484
|
1051.59
|
I-787, Clinton Avenue Monodeck: General Repairs
|
A487
|
1306.77
|
NY 7, I-87 To I-787 Overlap: Minor Rehabilitation
|
A489
|
1807.16
|
NY 913T Bridge Over the Delaware & Hudson Ramp: Bridge Replacement
|
A490
|
1807.17
|
Loudonville Road Bridge over the I-90 Ramp: Bridge Replacement
|
A491
|
1528.68
|
Patroon Island Bridge: Bridge Rehabilitation
|
A492
|
1757.72
|
Erie Canal Heritage Trail
|
A494
|
1806.43
|
Dunn Memorial Bridge: Overhead Signs
|
A495
|
1034.22
|
NY 5, from NY 155 to the Albany City Line: 2R Rehabilitation
|
A497
|
1754.45
|
Central Avenue (NY 5), from Everett Road to Quail Street: Resurfacing
|
A498
|
1757.91
|
City of Watervliet Alternative Fuel Retrofit: 5 Fire Trucks and 9 DPW
|
A499
|
1757.94
|
Carman Road Connector Sidewalk
|
A500
|
1757.95
|
Sheridan Hollow Sidewalks
|
A501
|
1758.01
|
School Zone Driver Feedback, City of Albany: Signs and Signals Program
|
A502
|
1758.02
|
Meads Lane/Van Dyke Road Intersection: Upgrade/Realignment
|
A503
|
1758.04
|
ITS Signal Improvements on New Scotland Avenue
|
A504
|
1758.09
|
Orchard Street Sidewalks: Crestwood Lane to Cherry Avenue
|
A505
|
1758.13
|
Sand Creek Middle School Bike/Ped Program
|
A506
|
1758.24
|
Catherine Street Sidewalk: South Swan Street & South Hawk Street
|
A507
|
1528.79
|
Patroon Island Bridge Repairs
|
A508
|
1758.67
|
Washington Avenue 1R Preventive Maintenance
|
A509
|
1758.68
|
Elm Avenue (CR 52), Delmar Bypass to Fuera Bush: 1R Preventive Maintenance
|
A510
|
|
NY 20: 1R Preventive Maintenance
|
A511
|
|
NY 155: MM 1101-3066 to MM 1101-3078: 1R Preventive Maintenance
|
A512
|
1808.28
|
I-787: Downtown Albany Pier and Capbeam Repair
|
A513
|
1808.29
|
South Mall Expressway: Joint & Pier Repair as Necessary
|
A514
|
|
Transit Supportive Zoning Study
|
A515
|
1935.77
|
Port of Albany Freight Wharf & Dock Repairs
|
A516
|
|
Bio Fuels Transfer Facility
|
A517
|
1935.49
|
Livingston Avenue Bridge Rehabilitation
|
A518
|
1933.03
|
Grade Crossing Signal Updrade: Ontario Street
|
A519
|
1933.05
|
Grade Crossing Signal Upgrade: Menands Road
|
A520
|
1933.06
|
Grade Crossing Signal Upgrade: Cemetary Avenue
|
A521
|
1051.68
|
I-787 Bridge Over Broadway
|
A522
|
1051.65
|
I-787 Watervliet South City Line to 8th Street in Troy, Mill & Fill
|
A523
|
1759.14
|
Albany Shaker Road & Northern Boulevard: Reconstruction
|
A524
|
1759.17
|
Albany County High Risk Rural Road Safety Program: Various Locations
|
A525
|
1808.21
|
NY 910D (Washington Avenue Extension), NY 155 to Fuller Road: Reconstruction
|
A526
|
1758.92
|
CR 9 over Fox Creek: Bridge Reconstruction
|
A527
|
1758.91
|
CR 55 over Vloman Kill: Bridge Replacement
|
A528
|
1759.03
|
Weaver Road over Black Creek: Bridge Reconstruction
|
A529
|
1758.88
|
Plank Road, Onesquethaw Creek Road and Rowe Road: Bridge Deck Replacements
|
A530
|
1808.25
|
NY 9W: 1R Preventive Maintenance
|
A531
|
1933.10
|
Youman's Road Grade Crossing Elimination
|
A532
|
|
Washington Avenue/Western Avenue Bus Rapid Transit (BRT) Alternatives
|
A533
|
1933.17
|
Municipal Work at Various Rail Crossing Locations in Cohoes
|
A534
|
1933.20
|
Grade Crossing Signal Upgrade: Main Street in Altamont
|
A535
|
1933.16
|
Warning Device Upgrade at New Cortland Street Rail Crossing, Cohoes
|
A536
|
1ABP.01
|
I-87 Twin Bridges over the Mohawk River: Bridge Rehabilitation
|
A537
|
1721.89
|
I-87 & NY 910F, Western Avenue to the Saratoga County: Repaving
|
A540
|
1759.54
|
Sidewalks: Various Locations in the Town of Bethlehem
|
R106
|
1001.28
|
NY 2 Over Poestenkill: Bridge Replacement
|
R155
|
1753.39
|
NY 2, from 11th Street to Pawling Avenue/Brunswick Road: Reconstruction
|
R173
|
1089.62
|
I-90 Exit 8 Connector Phase 2: ITS Demonstration.
|
R175
|
1754.51
|
ITS Signal Upgrades at Two Locations on Broadway between US 20 to
|
R178
|
1754.52
|
Troy-Menands Bridge Pedestrian and Bicycle Access
|
R185
|
1130.63
|
NY 22 Bridge over Kinderhook Creek: Bridge Replacement
|
R186
|
1306.61
|
NY 7 Bridge over Hoosick River: Bridge Replacement
|
R187
|
1306.62
|
NY 7, from Raymertown to Tomhannock Resevoir: Reconstruction
|
R188
|
1335.18
|
NY 40 Bridge over Hoosick River: Bridge Replacement
|
R195
|
1754.59
|
South Troy Industrial Park Road
|
R196
|
1754.68
|
CR 111 (Pitts-Johns Road) Bridge over the Hoosick River: Bridge Restoration
|
R198
|
1754.70
|
New Sidewalks on the West Side of Brookside Avenue
|
R202
|
1755.03
|
56 Road Bridge over Poestenkill Creek: Bridge Replacement
|
R203
|
1754.99
|
CR 40 (Plank Road) Bridge over the Poestenkill Creek: Bridge Replacement
|
R219
|
1755.42
|
ITS Signal Improvements in the City of Troy
|
R223
|
1755.66
|
Troy Pedestrian Bicycle Trail
|
R229
|
1756.31
|
Sherwood Avenue in East Greenbush, US 9 & 20 to Red Mill Road: Sidewalk
|
R230
|
B130.1
|
Castleton Bridge on Thruway: Rehabilitation of Substructure
|
R231
|
B131.1
|
Castleton Bridge on Thruway: Mitigation of Footing Erosion
|
R234
|
B136.1
|
Interchange B1 over Thruway: Bridge Replacements
|
R235
|
1001.31
|
NY 2 over Dayfoot Brook: Bridge Replacement
|
R238
|
1043.34
|
US 9 over NY 9J and 9 over AMTRAK & CSX: Bridge Replacement
|
R239
|
1188.33
|
NY 67 Bridge over Hoosick River: Bridge Replacement
|
R240
|
1755.20
|
Brookside Avenue over Wynantskill: Bridge Replacement
|
R241
|
1755.31
|
CR 49 (Eastern Union Turnpike) over Wynantskill Creek: Bridge Replacement
|
R242
|
1756.37
|
Spring Avenue Over Poestenkill: Bridge Replacement
|
R243
|
1756.42
|
Broadway Over AMTRAK Service Road: Bridge Rehabilitation
|
R244
|
1756.70
|
ITS Signal Improvements in the City of Troy Phase 2
|
R245
|
1756.62
|
NY 2, from 5th Avenue to 11th Street: Reconstruction
|
R246
|
1089.64
|
US 4 over the Hudson River: Bridge Replacement
|
R248
|
1756.96
|
9th Street Gateway Streetscape
|
R249
|
1756.97
|
First Alley Connector Sidewalk
|
R250
|
1756.99
|
NY 151: Flashing Beacons
|
R251
|
1757.01
|
Scott Avenue (NY 150), from Prins Way to Ransom Avenue: Sidewalk Rehabilitation &
|
R252
|
H81.1
|
Thruway Exit B1: Plaza Pavement & Ramp Rehabilitation
|
R253
|
B916.1
|
NY 203 (Eastbound & Westbound) Bridges Over Thruway: Bridge Replacements
|
R254
|
1757.15
|
Broadway, from US 20 to Broadway Viaduct Bridge: Reconstruction
|
R255
|
1757.35
|
Route 20 Corridor Bike/Ped Improvements
|
R256
|
1757.08
|
Caretaker Bridge Over Walooomsac River
|
R257
|
1755.36
|
NY 151 over East Street: Bridge Rehabilitation
|
R259
|
1757.20
|
CR 26 Bridge over Black Brook: Bridge Replacement
|
R260
|
1757.21
|
Sand Bank Road Bridge over the Little Hoosic River: Bridge Replacement
|
R261
|
1757.22
|
Elm Street Bridge over the Little Hoosick River: Bridge Replacement
|
R262
|
1757.37
|
Park & Ride Lots in US 20 Corridor
|
R265
|
1932.76
|
South Rensselaer County Port Connector
|
R266
|
1528.63
|
I-90 Bridges over the Moordenerkill: Rehabilitations
|
R267
|
1757.71
|
Luther Road (NY 151): Ped/Bike Access Improvements
|
R268
|
1528.68
|
Patroon Island Bridge: Bridge Rehabilitation
|
R269
|
1043.48
|
Dunn Memorial Bridge: Monodeck & General Repairs
|
R271
|
1001.35
|
NY 2, from Brunswick Town Line to Grafton State Park: 2R Rehabilitation
|
R276
|
1045.11
|
NY 378 Bridge Over Hudson River Shore: Rehabilitation
|
R277
|
1757.96
|
Lansingburgh Sidewalks
|
R278
|
1757.98
|
126th Street/US 4 (2nd Avenue)
|
R279
|
1757.99
|
US 4/Mannix Road Roundabout
|
R280
|
1758.05
|
ITS Signal Improvements on Pawling Avenue
|
R281
|
H1074.1
|
New York Thruway, Berkshire Spur: I-87 Exit 21A to I-90 Exit B1
|
R282
|
1758.69
|
Oakwood Avenue (CR 145), Troy City Line North to Troy City Line South: 1R
|
R283
|
|
NY 4, MM 1401-1016 to MM 1401-1039: 1R Preventive Maintenance
|
R284
|
1528.78
|
I-90, Patroon Island Bridge to Between Exits 10 and 11: Resurfacing
|
R285
|
1931.99
|
Con/Hud Crossing Green Street
|
R286
|
1111.34
|
NY 20 Bridge Over Kinderhook Creek,
|
R287
|
1758.15
|
CR 68 Over Wynantskill Creek
|
R288
|
1089.67
|
NY 4 Bridge Over Mill Creek
|
R289
|
1758.14
|
CR 114 Over Powamppokonk Creek
|
R290
|
1111.36
|
NY 20 Bridge Over Kinderhook Creek: Bridge Replacement
|
R291
|
1932.85
|
Amtrak Hudson Line Grade Crossings
|
R292
|
1758.38
|
US 4, Couse Corners to Mannix Road: Corridor Improvements
|
R293
|
1528.79
|
Patroon Island Bridge Repairs
|
R294
|
1111.29
|
US 20, US 4 to East Village of Nassau Line: Reconstruction
|
R295
|
1759.15
|
21st Street Realignment & Hoosick Street/Burdett Avenue Intersection
|
R296
|
1758.93
|
East Road (CR 33) over Kinderhook Creek: Bridge Replacement
|
R297
|
1758.98
|
Plank Road (CR 126) over the Deepkill: Bridge Replacement
|
R298
|
1758.99
|
Preservation of County Bridges
|
R299
|
1759.04
|
White Church Road over Quackenkill: Bridge Replacement
|
R300
|
1758.90
|
Broken Wheel Road over Hoosick River: Bridge Replacement
|
R301
|
1759.05
|
White Creek Road Bridge: Bridge Replacement or Reconstruction
|
R302
|
1808.25
|
NY 9: 1R Preventive Maintenance
|
R303
|
1932.08
|
Grade Crossing Signal Upgrade: Hunt Road Crossing of Pan Am Railways
|
R304
|
1932.24
|
Grade Crossing Signal Upgrade: Fishermans Lane
|
R305
|
1932.25
|
Grade Crossing Signal Upgrade: Buttermilk Falls Road
|
R306
|
1932.42
|
Grade Crossing Signal Upgrade: Potter Hill Road
|
SA84
|
1089.54
|
US 4 Bridge over the D&H Railroad: Bridge Reconstruction
|
SA88
|
1096.18
|
NY 50, North of Saratoga Springs: Reconstruction
|
SA95
|
1043.19
|
US 9 Intersection with Crescent Road and Church Hill Road: Intersection
|
SA104
|
1753.63
|
Batchellerville Bridge (CR 98): Bridge Replacement
|
SA108
|
1085.27
|
Balltown Road, from River Road to Glenridge Road: Corridor Improvements
|
SA109
|
1804.42
|
Glenridge Road, from Maple Avenue to NY 146: Reconstruction
|
SA133
|
1754.55
|
South Broadway/Ballston Avenue Intersection Improvements
|
SA134
|
1821.66
|
Replacement Buses for CDTA and Northway Express Service
|
SA136
|
1754.57
|
Saratoga Springs Downtown Pedestrian Improvements
|
SA144
|
1089.63
|
NY 4 OVER HUDSON RIVER , TOWNS OF NORTHUMBERLAND AND GREENW
|
SA152
|
1116.43
|
NY 9N Bridge over the Hudson River: Bridge Replacement
|
SA181
|
1755.93
|
Spring Run Trail Construction
|
SA185
|
1188.31
|
NY 67 from I-87 to NY 50: Resurfacing
|
SA190
|
1756.18
|
Green Street Connector Sidewalk Reconstruction, Village of Schuylerville
|
SA195
|
1756.29
|
Zim Smith Mid-County Trail
|
SA198
|
1247.08
|
NY 9P over Saratoga Lake Outlet: Bridge Replacement
|
SA199
|
1756.23
|
Bryant's Bridge Road Bridge over Fish Creek: Bridge Replacement
|
SA200
|
1754.56
|
Canal Road Bike Path
|
SA201
|
1756.60
|
Ballston Avenue, from Union Street to Hamilton Street: Safety Improvements
|
SA202
|
1756.34
|
Saratoga Springs to Corinth: Track Purchase and Rehabilitation
|
SA211
|
C67.1
|
Rehabilitation of Lock E-6
|
SA212
|
1756.79
|
Hudson Crossing Multi-Use Path
|
SA214
|
1722.05
|
I-87, Exit 13 to Exit 15: Resurfacing
|
SA215
|
1722.22
|
Malta Avenue (CR 63) Bridge Over I-87: Superstructure Replacement
|
SA216
|
1757.14
|
Church Street (NY 9N), from West Avenue to North Van Rensselaer Street:
|
SA217
|
1757.36
|
Crescent Road Bike and Pedestrian Improvements
|
SA218
|
CDTC11
|
Saratoga County Van Pool
|
SA220
|
1756.40
|
CR 7 Stewart Dam Bridge Over the Sacandaga Reservoir: Bridge Replacement
|
SA221
|
1757.07
|
CR 43 (Geyser Road) Bridge Over D&H Railroad: Bridge Replacement
|
SA222
|
1757.09
|
CR 45 (Northline Road) Bridge over Kayderosseras: Bridge Replacement
|
SA223
|
1757.10
|
US 4 (Central Avenue) Bridge Over the Anthony Kill: Bridge Replacement
|
SA225
|
1757.54
|
Round Lake Road Traffic and Mobility Improvements
|
SA226
|
1757.49
|
Commercial Access Highway Improvements: Two Roundabouts
|
SA227
|
1757.55
|
Commercial Access Highway Improvements: Round Lake Gateway
|
SA228
|
1757.53
|
Commercial Access Highway Improvements: Reconstruction of Cold Spring Road from
|
SA229
|
1757.48
|
Stabilizing of Brookwood Road
|
SA230
|
1757.65
|
Champlain Canal Trail
|
SA231
|
1757.66
|
Halfmoon Physically-Challenged Fishing Access
|
SA232
|
1757.67
|
Community Center NY 9 Spur
|
SA233
|
1722.23
|
NY 50 Bridge over I-87: Bridge Rehabilitation
|
SA234
|
1722.24
|
NY 9P Bridge over I-87: Bridge Replacement
|
SA235
|
1722.25
|
Two I-87 Bridges over NY 146 (Exit 9): Bridge Replacement
|
SA236
|
1722.26
|
I-87, Saratoga County Line to Exit 10: Mill & Fill
|
SA237
|
1806.85
|
Saratoga National Historic Park Slide Repair
|
SA238
|
1757.68
|
Erie Canal Towpath Community Connector
|
SA239
|
1757.75
|
Town of Milton Sidewalks & Curbs
|
SA241
|
1756.04
|
Saratoga Monument Visitor Access Improvements
|
SA242
|
1722.30
|
I-87, Exit 10 to Exit 13: Resurfacing
|
SA243
|
1043.51
|
NY 9 & NY 67, Intersections
|
SA244
|
1089.64
|
US 4 over the Hudson River: Bridge Replacement
|
SA245
|
1758.03
|
South Street Safety Upgrades
|
SA246
|
1758.25
|
Route 9/Town Court Pedestrian Connectivity Project
|
SA247
|
1758.26
|
Core Area Mobility Impaired Accessibility Improvement Program
|
SA248
|
1758.08
|
Shenendehowa Community Trails Network
|
SA249
|
1758.10
|
NY 4, Stillwater: Sidewalk Extension
|
SA250
|
1758.73
|
Dunning Street (CR 108), limits TBD: 1R Preventive Maintenance
|
SA251
|
|
NY 50, MM 1502-1066 to MM 1502-1075: 1R Preventive Maintenance
|
SA252
|
|
NY 9: 1R Preventive Maintenance
|
SA253
|
1758.65
|
Dix Bridge: Rehabilitation
|
SA254
|
1757.76
|
CR 67 Over Fish Creek: Bridge Replacement
|
SA255
|
1941.14
|
Lock 3 Access Road Bridge over the Champlain Canal
|
SA256
|
1935.61
|
Canadian Pacific Railway’s Ballston Spa Siding
|
SA257
|
CDTC.19
|
Park & Ride Lot at Wilton Mall
|
SA258
|
1759.16
|
North Line Road/Old Post Road/Malta Avenue Intersection
|
SA259
|
1759.00
|
Staffords Road CR 67 over Fish Creek: Bridge Reconstruction
|
SA260
|
1758.96
|
Mott Road over Snook Kill: Bridge Deck Repair
|
SA261
|
1758.97
|
North Main Street over Anthony Kill: Bridge Replacement
|
SA262
|
1758.94
|
Frances Street over Anthony Kill: Bridge Replacement
|
SA263
|
1808.25
|
NY 50: 1R Preventive Maintenance
|
SA264
|
1808.25
|
NY 146: 1R Preventive Maintenance
|
SA265
|
1808.69
|
Emergency Slide Repairs at Saratoga National Park
|
SA266
|
1808.70
|
Pavement Management Projects at Saratoga National Park FFY 11-12
|
SA267
|
1808.71
|
Pavement Management Projects at Saratoga National Park FFY 12-13
|
SA268
|
1722.40
|
I-87, Mohawk River to Exit 12: 1R Resurfacing
|
SA269
|
1932.91
|
Grade Crossing Signal Upgrade: Mott Road/Lansings
|
SA270
|
1933.19
|
Grade Crossing Signal Upgrade: Park Avenue
|
SA271
|
1ABP.01
|
I-87 Twin Bridges over the Mohawk River: Bridge Rehabilitation
|
SA272
|
1759.59
|
Geyser Road Sidewalks
|
SA273
|
1759.60
|
Round Lake Road Sidewalks
|
SA274
|
1759.61
|
Pruyn Hill Sidewalks
|
SA275
|
1759.57
|
Driver Speed Feedback Signs
|
S96
|
1085.31
|
Balltown Road, from River Road to Glenridge Road: Corridor Improvements
|
S97
|
1096.19
|
NY 50, Freeman's Bridge Road to Glenridge Road: Corridor Improvements
|
S120
|
1804.42
|
Glenridge Road, from Maple Avenue to NY 146: Reconstruction
|
S124
|
1525.29
|
I-890, from Campbell Road to Exit 26: Reconstruction
|
S140
|
1754.63
|
Mohawk-Hudson Bike-Hike Trail: Corridor Improvements
|
S143
|
1754.66
|
Bicycle and Pedestrian Path Near Lock 8
|
S150
|
1935.52
|
NYSDOT/Amtrak Rail Initiative: Rensselaer to Schenectady Double Track.
|
S155
|
1755.79
|
Scotia Sidewalks
|
S157
|
1756.01
|
Maple Avenue Realignment
|
S160
|
1755.91
|
Mohawk-Hudson Bike-Hike Trail
|
S165
|
1941.22
|
Mohawk-Hudson Bike-Hike Trail: Rotterdam Junction to Amsterdam
|
S166
|
1306.66
|
NY 7 over Normanskill: Bridge Replacement
|
S167
|
1755.33
|
Oak Street over CSX: Bridge Replacement
|
S168
|
1805.68
|
Ferry Road over Backchannel Mohawk: Bridge Replacement
|
S170
|
1941.19
|
Western Gateway Transportation Center
|
S171
|
1941.21
|
Rehabilitation at Lock E-8
|
S173
|
H2174.1
|
Thruway, Milepost 153.8 to 158.8: Pavement Rehabilitation
|
S174
|
C239.1
|
Lock E-9, Moveable Dam #5: Steel Repairs
|
S175
|
1755.37
|
CR 103 (Pangburn Road) Bridge Over Normanskill: Bridge Replacement
|
S176
|
1941.25
|
Schenectady Trail Rehabilitation
|
S177
|
1757.16
|
Erie Boulevard, from Liberty Street to I-890: Reconstruction
|
S178
|
1306.76
|
NY 7 Bridge Over I-890: Bridge Replacement
|
S182
|
1034.21
|
NY 5 Bridge over the Erie Canal: Bridge Replacement
|
S183
|
1525.35
|
I-890, Thruway Exit 25 to NY 337 (Campbell Road): Minor Rehabilitation
|
S184
|
1757.90
|
City of Schenectady Alternative Fuel Retrofit: Up to 26 Vehicles
|
S185
|
1757.89
|
County of Schenectady Alternative Fuel Retrofit: 3 Vehicles
|
S186
|
1757.92
|
Town of Niskayuna Alternative Fuel Retrofit: 7 Vehicles, 1 Light Tower and
|
S187
|
1757.97
|
Mohawk/Hudson Bike Trail Crossing at NY 5S
|
S188
|
1758.00
|
Erie Boulevard/Jay Street/Nott Street/Front Street Roundabout
|
S189
|
1758.06
|
New Traffic Signal at Intersection of Providence Avenue & Hillside Avenue
|
S190
|
1758.27
|
Seneca Street and Maxon Road Canalway Trail Crossing
|
S191
|
1758.28
|
Mohawk-Hudson Bike-Hike Trail Informational Kiosks
|
S192
|
1758.29
|
Hamburg Street Sidewalk Connection: Arlene Street to East Campbell Road
|
S193
|
H1102.1
|
New York State Thruway: Rotterdam Interchange (Exit 26) - Pavement
|
S194
|
1758.70
|
River Road/Providence Avenue: 1R Preventive Maintenance
|
S195
|
1758.71
|
Rosendale Road, River Road to NY 7: 1R Preventive Maintenance
|
S196
|
1758.72
|
Van Vranken Avenue, Nott Street to Maxon Road: 1R Preventive Maintenance
|
S197
|
|
NY 914D, Weaver Street to Edison Avenue: 1R Preventive Maintenance
|
S198
|
1808.24
|
I-88 Bridges over Pangburn Road and over NY 7: Deck Repair
|
S199
|
1759.19
|
Lower State Street & Washington Avenue: Reconstruction
|
S200
|
1759.18
|
Hamburg Street (NY 146), Curry Road to Caldicott Road: Corridor Improvements
|
S201
|
1759.20
|
Broadway: Reconstruction and N. Westcott Sidewalk Only (one side from NY 7 to
|
S202
|
1759.21
|
Upper Union Street, West City/Town line at Van Antwerp Road to NY 146 (Balltown
|
S203
|
1759.02
|
Van Vorst over Alplaus Kill: Bridge Replacement
|
S204
|
1758.95
|
Kings Road (CR 65) over CSX: Bridge Reconstruction
|
S205
|
1759.01
|
Sunnyside Road over Amtrak: Bridge Deck Repairs
|
S206
|
1758.89
|
Alplaus Avenue Bridge over Alplaus Kill: Bridge Reconstruction or Replacement
|
S207
|
1808.25
|
NY 7: 1R Preventive Maintenance
|
S208
|
1808.25
|
NY 50: 1R Preventive Maintenance
|
S209
|
1808.25
|
NY 146: 1R Preventive Maintenance
|
S210
|
1932.26
|
Grade Crossing Signal Upgrade: NY 5S
|
S211
|
1933.18
|
Grade Crossing Signal Upgrade: Main Street (NY 395)
|
S212
|
1932.95
|
Seneca St. Rail Crossing
|
S213
|
1759.55
|
Sidewalks on McClellan Street and Grand Boulevard
|