TIP Number SA225 (PIN 1757.54) < TIP # > | < PIN >
All funds are in matched millions of dollars.
This listing includes the amendment for this project of 09/12 .

Project Listings |  Clickable Maps |  Help |  Previous Online TIP's

Project Description

Round Lake Road Traffic and Mobility Improvements

Includes bike/ped accommodations between East Line Road and the Round Lake Bypass roundabout. Intersection capacity and operational improvements would be constructed at Chango Drive and at Ruhle Road. Also, access management improvements, advance storm water management and street-scaping.

A total of $9.251M was available for this project and has all been programmed. Programming is considered when scope and limits are defined for CDTC to amend its TIP air quality conformity determination. Projects SA226 & SA227 were funded through this project. SA228 is related.

NYSDOT redistributed $0.127M, but the total remained the same.




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source

2008-10

2010-11

2011-12

2012-13

2013-14

2014-15

Post '15

Demo.

0

0

0

0.300 D

4.544 C

0

0

Demo.

0

0

0

0.176 P

0.150 R

0

0

Demo.

0

0

0

0.105 I

0

0

0



Funding Totals by Phase

Phase

Five-Year Funding
(2010-11 through 2014-15)

Seven-Year Funding
(2008-10 through 2014-15)

Engineering

0.476

0.476

Right-of-Way

0.255

0.255

Construction

4.544

4.544

Total

5.275

5.275



Other Information

TIP Number: SA225

First TIP: 2005-10

PIN: 1757.54

Func. Class: NA

Project Type: Reconst'n

Length: TBD

Jurisdiction: County

Plan Ref.: Luther

Location: Multiple

No EIS Required

Implementer: County

Air Quality: Exempt






CDTC Home Page   |  Site Map