TIP Number SA201 (PIN 1756.60) < TIP # > | < PIN >
All funds are in matched millions of dollars.
This listing includes the amendment for this project of 02/12 .
This project is based on the project fact sheet used in the 2003-08 TIP Update.

Project Listings |  Clickable Maps |  Help |  Previous Online TIP's

Project Description

Ballston Avenue, from Union Street to Hamilton Street: Safety Improvements

Reconstruction with a left turn lane, curb realignment, traffic signal replacement, sidewalks and streetscaping.




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source

2008-10

2010-11

2011-12

2012-13

2013-14

2014-15

Post '15

STP-Flex

0

0

0

0.078 C

0

0

0

Safety

0

0

0.084 D

0.120 R

0

0

0

Safety

0

0.084 P

0.035 I

1.012 C

0

0

0



Funding Totals by Phase

Phase

Five-Year Funding
(2010-11 through 2014-15)

Seven-Year Funding
(2008-10 through 2014-15)

Engineering

0.168

0.168

Right-of-Way

0.155

0.155

Construction

1.090

1.090

Total

1.413

1.413



Other Information

TIP Number: SA201

First TIP: 2003-08

PIN: 1756.60

Func. Class: UPA

Project Type: Safety

Length: NA

Jurisdiction: City

Plan Ref.: ITS

Location: Saratoga Springs

No EIS Required

Implementer: City

Air Quality: Exempt






CDTC Home Page   |  Site Map