TIP Number SA200 (PIN 1754.56) < TIP # > | < PIN >
All funds are in matched millions of dollars.
This project is based on the project fact sheet used in the 2003-08 TIP Update.

Project Listings |  Clickable Maps |  Help |  Previous Online TIP's

Project Description

Canal Road Bike Path

Construct off-road multi-use path along Canal Road from US 9 to the Twin Bridges for 2.8 miles.

This project replaced SA135 from the 2001-06 TIP.

As of 5/4/11 this project is not capped.

This project is complete.




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source

2008-10

2010-11

2011-12

2012-13

2013-14

2014-15

Post '15

STP-Flex

0.033 P

0

0

0

0

0

0

STP-Flex

0.032 D

0

0

0

0

0

0

STP-Flex

0.405 C

0

0

0

0

0

0



Funding Totals by Phase

Phase

Five-Year Funding
(2010-11 through 2014-15)

Seven-Year Funding
(2008-10 through 2014-15)

Engineering

0

0.065

Construction

0

0.405

Total

0

0.470



Other Information

TIP Number: SA200

First TIP: 2003-08

PIN: 1754.56

Func. Class: UL

Project Type: Bike/Ped

Length: NA

Jurisdiction: Town

Plan Ref.: NV

Location: Halfmoon

No EIS Required

Implementer: Town

Air Quality: Exempt






CDTC Home Page   |  Site Map