TIP Number SA195 (PIN 1756.29) < TIP # > | < PIN >
All funds are in matched millions of dollars.

Project Listings |  Clickable Maps |  Help |  Previous Online TIP's

Project Description

Zim Smith Mid-County Trail

Convert abandonded D&H railroad corridor into bikeway and trailway.

This includes grading, leveling, paving, roadway crossings, two trailhead endpoints and a new bridge over the Mourningkill

Federal funding for the STP-Enh funds are 80%, with a maximum $0.686M federal share.

The phase funded with Stimulus funds is PIN 1758.62. It was funded with $1.433M, but now reflects low bid.

This project is complete.




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source

2008-10

2010-11

2011-12

2012-13

2013-14

2014-15

Post '15

STP-Enh.

0.858 C

0

0

0

0

0

0

StimNew

0.524 C

0

0

0

0

0

0

Local

0.255 C

0

0

0

0

0

0



Funding Totals by Phase

Phase

Five-Year Funding
(2010-11 through 2014-15)

Seven-Year Funding
(2008-10 through 2014-15)

Construction

0

1.637

Total

0

1.637



Other Information

TIP Number: SA195

First TIP: 2001-06

PIN: 1756.29

Func. Class: NA

Project Type: Bike/Ped

Length: 8.77 miles

Jurisdiction: County

Plan Ref.: NV

Location: Multiple

No EIS Required

Implementer: County

Air Quality: Exempt