TIP Number S200 (PIN 1759.18) < TIP # > | < PIN >
All funds are in matched millions of dollars.
This listing includes the amendment for this project of 04/11 and 10/11 .
This project is based on the project fact sheet used in the 2010-15 TIP Update.

Project Listings |  Clickable Maps |  Help |  Previous Online TIP's

Project Description

Hamburg Street (NY 146), Curry Road to Caldicott Road: Corridor Improvements

Reconstruction of 0.5 miles of roadway (4th Street to Stoodley Place) with curbing, maintenance strips, a 14 foot shared bike lane and a parking lane and access management.

Replacement and installation of 8900 feet of sidewalk from Curry to Caldicott.

NYSDOT moved $0.250M from year 2 to year 4 as shown.




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source

2008-10

2010-11

2011-12

2012-13

2013-14

2014-15

Post '15

STP-Flex

0

0

0

0

0.350 P

5.060 C

0

STP-Flex

0

0

0

0

0.300 D

0

0



Funding Totals by Phase

Phase

Five-Year Funding
(2010-11 through 2014-15)

Seven-Year Funding
(2008-10 through 2014-15)

Engineering

0.650

0.650

Construction

5.060

5.060

Total

5.710

5.710



Other Information

TIP Number: S200

First TIP: 2010-15

PIN: 1759.18

Func. Class: NA

Project Type: Reconst'n

Length: Ln-Mi

Jurisdiction: Town

Plan Ref.: HWY Cond

Location: Rotterdam

No EIS Required

Implementer: Town

Air Quality: Exempt






CDTC Home Page   |  Site Map