TIP Number S199 (PIN 1759.19) < TIP # > | < PIN >
All funds are in matched millions of dollars.
This listing includes the amendment for this project of 04/11 and 10/11 .
This project is based on the project fact sheet used in the 2010-15 TIP Update.

Project Listings |  Clickable Maps |  Help |  Previous Online TIP's

Project Description

Lower State Street & Washington Avenue: Reconstruction

State Street: City Line to Erie Blvd

Washington Ave: NY 5 to I-890

Reconstruction with curbing, water line and closed drainage system replacement, water/sewer relocations, replace conduit, replace traffic signals, sidewalks, install raised median, crosswalks, midblock crossing on Washington at SCCC, pedestrian signals and curb ramps, bike facilities, bike racks, transit facilities and landscaping.




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source

2008-10

2010-11

2011-12

2012-13

2013-14

2014-15

Post '15

STP-Flex

0

0

0

0

0.200 R

9.540 C

0

STP-Flex

0

0

0

0

0.600 D

0

0

STP-Flex

0

0

0

0

0.600 P

0

0



Funding Totals by Phase

Phase

Five-Year Funding
(2010-11 through 2014-15)

Seven-Year Funding
(2008-10 through 2014-15)

Engineering

1.200

1.200

Right-of-Way

0.200

0.200

Construction

9.540

9.540

Total

10.940

10.940



Other Information

TIP Number: S199

First TIP: 2010-15

PIN: 1759.19

Func. Class: NA

Project Type: Reconst'n

Length: Ln-Mi

Jurisdiction: City

Plan Ref.: HWY Cond

Location: Schenectady

No EIS Required

Implementer: City

Air Quality: Exempt






CDTC Home Page   |  Site Map