TIP Number S188 (PIN 1758.00) < TIP # > | < PIN >
All funds are in matched millions of dollars.
This listing includes the amendment for this project of 11/12 .
This project is based on the project fact sheet used in the 2007-12 TIP Update.

Project Listings |  Clickable Maps |  Help |  Previous Online TIP's

Project Description

Erie Boulevard/Jay Street/Nott Street/Front Street Roundabout

This was programmed as a top candidate for a roundabout. Final design depends on the project design process.

The 2-lane roundabout includes pedestrian accommodations, drainage improvements and redesign of adjacent parking lot.

This project was funded via RG104 . Funds were moved from P & I to C.




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source

2008-10

2010-11

2011-12

2012-13

2013-14

2014-15

Post '15

CMAQ

0

0

0

0.270 P

0.283 R

0

0

CMAQ

0

0

0

0.015 I

2.030 C

0

0



Funding Totals by Phase

Phase

Five-Year Funding
(2010-11 through 2014-15)

Seven-Year Funding
(2008-10 through 2014-15)

Engineering

0.270

0.270

Right-of-Way

0.298

0.298

Construction

2.030

2.030

Total

2.598

2.598



Other Information

TIP Number: S188

First TIP: 2007-12

PIN: 1758.00

Func. Class: UmA

Project Type: Traff Op'n

Length: NA

Jurisdiction: City

Plan Ref.: NV

Location: Schenectady

No EIS Required

Implementer: City

Air Quality: Exempt






CDTC Home Page   |  Site Map