TIP Number S177 (PIN 1757.16) < TIP # > | < PIN >
All funds are in matched millions of dollars.
This listing includes the amendment for this project of 08/11 .
This project is based on the project fact sheet used in the 2005-10 TIP Update.

Project Listings |  Clickable Maps |  Help |  Previous Online TIP's

Project Description

Erie Boulevard, from Liberty Street to I-890: Reconstruction

This includes redesign of the road with signal, drainage, curbs, sidewalks, parking, median and intersection treatments and streetscaping.

The schedule shown for Demo funding assumes NYSDOT willingness & ability to use spending flexibility. The Demo funds extend the limit from State Street to Liberty Street and, if funds permit, to Union Street.

Project selection was used to move funds from R & D to C.




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source

2008-10

2010-11

2011-12

2012-13

2013-14

2014-15

Post '15

NHS

0

0.511 R

0.180 D

0

0

0

0

NHS

0

0.330 D

0

0

0

0

0

NHS

0

0

9.589 C

0

0

0

0

Demo.

0

0

1.460 C

0

0

0

0

Local

0

0

1.500 C

0

0

0

0



Funding Totals by Phase

Phase

Five-Year Funding
(2010-11 through 2014-15)

Seven-Year Funding
(2008-10 through 2014-15)

Engineering

0.510

0.510

Right-of-Way

0.511

0.511

Construction

12.549

12.549

Total

13.570

13.570



Other Information

TIP Number: S177

First TIP: 2005-10

PIN: 1757.16

Func. Class: UPA

Project Type: Reconst'n

Length: 3.6 Ln-Mi

Jurisdiction: City

Plan Ref.: HWY Cond

Location: Schenectady

No EIS Required

Implementer: City

Air Quality: Exempt






CDTC Home Page   |  Site Map