TIP Number S173 (PIN H2174.1) < TIP # > | < PIN >
All funds are in matched millions of dollars.

Project Listings |  Clickable Maps |  Help |  Previous Online TIP's

Project Description

Thruway, Milepost 153.8 to 158.8: Pavement Rehabilitation




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source

2008-10

2010-11

2011-12

2012-13

2013-14

2014-15

Post '15

Thruway

8.800 C

0

0

0

0

0

0



Funding Totals by Phase

Phase

Five-Year Funding
(2010-11 through 2014-15)

Seven-Year Funding
(2008-10 through 2014-15)

Construction

0

8.800

Total

0

8.800



Other Information

TIP Number: S173

First TIP: 2005-10

PIN: H2174.1

Func. Class: UI

Project Type: Reconst'n

Length: 5.0 cl-mi

Jurisdiction: Thruway

Plan Ref.: Thruway

Location: Multiple

No EIS Required

Implementer: Thruway

Air Quality: Exempt






CDTC Home Page   |  Site Map