TIP Number R173 (PIN 1089.62) < TIP # > | < PIN >
All funds are in matched millions of dollars.

Project Listings |  Clickable Maps |  Help |  Previous Online TIP's

Project Description

I-90 Exit 8 Connector Phase 2: ITS Demonstration.

$3.5M was spent prior to the 2003-05 period. The project is currently estimated to cost a total of $75M. Additional funding is dependent on identification of a fund source.

Phase 1 was R36 from the 1994-99 TIP.

Related Project: R222 from the 2003-08 TIP.




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source

2008-10

2010-11

2011-12

2012-13

2013-14

2014-15

Post '15

Demo.

9.244 R

0

7.118 C

0

0

0

0



Funding Totals by Phase

Phase

Five-Year Funding
(2010-11 through 2014-15)

Seven-Year Funding
(2008-10 through 2014-15)

Right-of-Way

0

9.244

Construction

7.118

7.118

Total

7.118

16.362



Other Information

TIP Number: R173

First TIP: 1997-02

PIN: 1089.62

Func. Class: UPA

Project Type: New Cons'n

Length: 12 Ln-Mi

Jurisdiction: State

Plan Ref.: NV

Location: North Greenbush

May Require EIS

Implementer: County

Air Quality: Non-Exempt






CDTC Home Page   |  Site Map