TIP Number A458 (PIN H2034.3) < TIP # > | < PIN >
All funds are in matched millions of dollars.

Project Listings |  Clickable Maps |  Help |  Previous Online TIP's

Project Description

Thruway Exit 24 to Exit 25: Pavement Reconstruction & Mobility Improvements

Mileposts 147.87 to 153.83




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source

2008-10

2010-11

2011-12

2012-13

2013-14

2014-15

Post '15

Thruway

0

5.800 P

0

0

0

0

91.000 C



Funding Totals by Phase

Phase

Five-Year Funding
(2010-11 through 2014-15)

Seven-Year Funding
(2008-10 through 2014-15)

Engineering

5.800

5.800

Total

5.800

5.800



Other Information

TIP Number: A458

First TIP: 2005-10

PIN: H2034.3

Func. Class: UI

Project Type: Reconst'n

Length: 6.0 Cl-Mi

Jurisdiction: Thruway

Plan Ref.: Thruway

Location: Multiple

EIS Required

Implementer: Thruway

Air Quality: Exempt






CDTC Home Page   |  Site Map