TIP Number A455 (PIN H2034.1) < TIP # > | < PIN >
All funds are in matched millions of dollars.

Project Listings |  Clickable Maps |  Help |  Previous Online TIP's

Project Description

Thruway Exit 23 to Exit 24: Pavement Reconstruction & Mobility Improvements

Mileposts 141.92 to 147.87




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source

2008-10

2010-11

2011-12

2012-13

2013-14

2014-15

Post '15

Thruway

0

4.800 P

0

0

115.000 C

0

0



Funding Totals by Phase

Phase

Five-Year Funding
(2010-11 through 2014-15)

Seven-Year Funding
(2008-10 through 2014-15)

Engineering

4.800

4.800

Construction

115.000

115.000

Total

119.800

119.800



Other Information

TIP Number: A455

First TIP: 2005-10

PIN: H2034.1

Func. Class: UI

Project Type: Reconst'n

Length: 5.95 Cl-Mi

Jurisdiction: Thruway

Plan Ref.: Thruway

Location: Multiple

EIS Required

Implementer: Thruway

Air Quality: Non-Exempt






CDTC Home Page   |  Site Map