TIP Number A454 (PIN H2173.1) < TIP # > | < PIN >
All funds are in matched millions of dollars.

Project Listings |  Clickable Maps |  Help |  Previous Online TIP's

Project Description

Thruway Exit 25 (Schenectady): Interim Plaza & Ramp Pavement Rehabilitation




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source

2008-10

2010-11

2011-12

2012-13

2013-14

2014-15

Post '15

Thruway

1.100 C

0

0

0

0

0

0



Funding Totals by Phase

Phase

Five-Year Funding
(2010-11 through 2014-15)

Seven-Year Funding
(2008-10 through 2014-15)

Construction

0

1.100

Total

0

1.100



Other Information

TIP Number: A454

First TIP: 2005-10

PIN: H2173.1

Func. Class: UI

Project Type: Resurface

Length: NA

Jurisdiction: Thruway

Plan Ref.: Thruway

Location: Multiple

No EIS Required

Implementer: Thruway

Air Quality: Exempt






CDTC Home Page   |  Site Map