TIP Number A438 (PIN 1756.59) < TIP # > | < PIN >
All funds are in matched millions of dollars.
This project is based on the project fact sheet used in the 2003-08 TIP Update.

Project Listings |  Clickable Maps |  Help |  Previous Online TIP's

Project Description

19th Street, from City Line to Congress Steet Bridge: Reconstruction

Includes new signals, raised median, some sidewalk & curb reconstruction, drainage and traffic calming.

The C cost reflects the low bid. The STP construction funds were added by NYSDOT.

This project is complete.




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source

2008-10

2010-11

2011-12

2012-13

2013-14

2014-15

Post '15

STP-Urb.

0.394 D

0

0

0

0

0

0

STP-Urb.

0.129 R

0

0

0

0

0

0

STP-Urb.

0.014 I

0

0

0

0

0

0

STP-Urb.

0.357 C

0

0

0

0

0

0

Stim

6.628 C

0

0

0

0

0

0



Funding Totals by Phase

Phase

Five-Year Funding
(2010-11 through 2014-15)

Seven-Year Funding
(2008-10 through 2014-15)

Engineering

0

0.394

Right-of-Way

0

0.143

Construction

0

6.985

Total

0

7.522



Other Information

TIP Number: A438

First TIP: 2003-08

PIN: 1756.59

Func. Class: UPA

Project Type: Reconst'n

Length: 3.9 Ln-Mi

Jurisdiction: City

Plan Ref.: HWY Cond

Location: Watervliet

No EIS Required

Implementer: City

Air Quality: Exempt






CDTC Home Page   |  Site Map