TIP Number A435 (PIN 1756.63) < TIP # > | < PIN >
All funds are in matched millions of dollars.
This listing includes the amendment for this project of 01/13 .
This project is based on the project fact sheet used in the 2003-08 TIP Update.

Project Listings |  Clickable Maps |  Help |  Previous Online TIP's

Project Description

ITS Transit Signal Priority on Washington and Western Avenues

Replace signal hardware as needed, connect to TMC and provide transit priority at selected intersections.

P & D phases will be implemented by the City and C by NYSDOT.

Phase 1: con. for Western Ave. and all design (funding shown below)

Phase 2: Washington Ave. construction, currently unfunded (about $2.2M)




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source

2008-10

2010-11

2011-12

2012-13

2013-14

2014-15

Post '15

CMAQ

0.492 P

0

0

0.290 D

5.380 C

0

0



Funding Totals by Phase

Phase

Five-Year Funding
(2010-11 through 2014-15)

Seven-Year Funding
(2008-10 through 2014-15)

Engineering

0.290

0.782

Construction

5.380

5.380

Total

5.670

6.162



Other Information

TIP Number: A435

First TIP: 2003-08

PIN: 1756.63

Func. Class: UPA

Project Type: Traff Op'n

Length: NA

Jurisdiction: City

Plan Ref.: NV

Location: Albany

No EIS Required

Implementer: City

Air Quality: Non-Exempt






CDTC Home Page   |  Site Map