This project will construct about 350
feet of 5 foot wide sidewalk along the
western side of NY 9 at the Town of
Malta Community Center, connecting the
Community Center with the Town Complex
and Downtown District.
Federal funding is 80%, with a maximum
of $0.0225M.
This project was funded via RG41
from
the 2005-08 period.